B08_-_Attachment_2_-_Seed_Project_TO1.pdf
PDF 2 MB Posted
- Solicitation number
- 140P1424R0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1424R0003_Amd_0002.pdf | ||
| Sol_140P1424R0003_Amd_0001.pdf | ||
| Amendment_1_Attachment_-_Q_A_0001.docx | DOCX document | |
| B08_-_Attachment_5_-_Limitation_on_Subcontracting_Worksheet.xlsx | XLSX spreadsheet | |
| Sol_140P1424R0003.pdf | ||
| B08_-_Attachment_3_-_TO1.xlsx | XLSX spreadsheet | |
| B08_-_Attachment_1_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B08_-_Attachment_6_-_Wage_Determination.pdf | ||
| B08_-_Attachment_4_-_SoW_Roadway_Striping.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW - Grand Teton National Park Scope of Work: Pavement Markings - 2024 Contract # ___________, Task Order 1
ATTACHMENT 2 - TASK ORDER #1
Task Order #1 Bid Schedule
Item # DESCRIPTION Unit QTY Unit Price Subtotal
R O
AD
W
AY
ST
R
IP
IN
G 1 Striping, yellow, 4" width LF 404,430
2 Striping, white, 4" width LF 516,289 3 Striping, yellow, 6" width LF 181,747 4 Striping, white, 6" width LF 296,337
4A Striping, white, 8" width LF 1,935
R em ov al
5 Removal- symbol or message Ea -
6 Removal-stripe LF - 7 Removal- paint on curb LF -
H an d Pa in tin g
8 Parking space lines LF -
Accessible parking symbol, blue box background, white symbol
Ea -
10 Stop bar LF 490 11 Crosswalk LF 500 12 Curb painting LF -
Stenciled message, i.e.
STOP, AHEAD, 35 MPH
(5 letters max)
Ea 16
14 Arrow Ea 156 15 Hand stripe- 4 in. wide LF 5,692 16 Hand stripe-6 in. wide LF - 17 Bike symbol Ea 4 18 Yield Line Triangles Ea 34 19 Bike lane, green, 5' width LF -
PR
EP
20 Gros Ventre Roundabout Traffic Control and Cleaning Ea 1
Total
STATEMENT OF WORK
The work of this contract is pavement markings as determined by task order description on the roads and parking areas within Grand Teton National Park and John D. Rockefeller Parkway, WY. Distances are approximate. Contract will be awarded as a lump sum. Work to be completed by 21 June, 2024.
SOW - Grand Teton National Park Scope of Work: Pavement Markings - 2024 Contract # ___________, Task Order 1
Task work:
Task 1 Provide all paint, labor, equipment and materials to repaint all existing road markings on the Outside Highway (US Highway 26) from the Grand Teton National Park South Boundary to the East Boundary, near Moran, WY (approx. 28 miles) - see Attachment A. Work includes the Triangle X horse crossing and the Gros Ventre Roundabout (see Attachment D).
Task 2 Provide all paint, labor, equipment and materials to repaint all existing road markings on the North Park Road (US Highway 89) from the Moran Junction to the John D Rockefeller Parkway North Boundary (approx. 27 miles). See Attachment B.
Task 3 Provide all paint, labor, equipment and materials to repaint all existing road markings on the Teton Park Road from Moose Junction to Jackson Lake Junction. Work includes the stop bars at the Moose 4- & 2-Way intersections, Highlands, Lupine Meadows, Potholes Turnout, RKO Pit, River Road, Signal Lagoon, and Signal Mountain Summit Rd.
Work includes the 2 crosswalks at the Moose 4-Way intersection, the crosswalk at the east leg of the Moose 2-Way intersection, and the crosswalks crossing the road just south of Taggart Trailhead and just south of the Jackson Lake Dam. See Attachment C.
List of Attachments:
Attachment A – Outside Highway
Attachment B – North Park Road
Attachment C – Teton Park Road
Attachment D – Gros Ventre Roundabout
Communication Requirements:
The contractor shall be required to communicate on a weekly basis to the COR about the work completed during the previous week and the work expected to be completed by the end of the upcoming week.
Attachment A – Outside Highway
Attachment B – North Park Road
Attachment C – Teton Park Road, Moose Junction to Jackson Lake Junction
STATE PROJECT
NUMBER
SHEET
WY NPS GRTE 700(4)
M a y
P
M g r te p f.
d g n
NPS Drwg. No. 136/125480
NPS PMIS No. 207748
C h e c k e d b y M
B u tt e r s
D e s ig n e d b y E
N a s z k o w s k a
XIN
G
40 8002040
SCALE IN FEET
N
MARKING LAYOUT
PERMANENT PAVEMENT
ROADWAY
parking aisle)
(type B, accessibility marking symbol, Parking lot pavement
SAGEBRUSH DRIVE
H I G
H W
A Y
G
RO
S
VEN
TRE
RO
AD
L.6
12' Lane
12' Lane
' L an e12
' L an e
L a n e
L a n e
L a n e
L a n e
18' Lane
MATCHLINE A
MATCHLINE B
MATCHLINE B
MATCHLINE A
H I G
H W
A Y
H I G
H W
A Y
Pavement markings, type B, solid (yellow)
Pavement markings, type B, solid (white)
Pavement markings, type B, solid (white)
Pavement markings, type B, solid (yellow)
Pavement markings, type B, solid (white)
Pavement markings, type B (yield line)
Pavement markings, type B, dotted
Pavement markings, type B, solid (white)
Pavement markings, type B, (yield line)
Pavement markings, type B, dotted
Pavement markings, type B, solid (white)
Pavement markings, type B, solid (yellow)
Pavement markings, type B, solid (white)
Pavement markings, type B, solid (yellow) type B, dotted
Pavement markings, Pavement markings, type B (yield line)
Pavement markings, type B, solid (white)
Pavement markings, type B (Crosswalk)
Pavement markings, type B, solid (yellow) type B, dotted
Pavement markings, (yield line)
Pavement markings, type B type B, solid (white)
Pavement markings, type B (Crosswalk)
Pavement markings, (type B, XING) symbols
Pavement markings, symbol)
(type B, bike symbols
Pavement markings, type B, solid (white)
Pavement markings, (24-inch white stop line)
Pavement markings, type B, solid stop line)
(24-inch white type B, solid markings, Pavement type B, solid (white)
Pavement markings, symbol type B accessibility pavement markings, Parking lot type B, solid (white)
Pavement markings, Parking Lot
(type B, Bike symbol)
Pavement markings, symbols
(type B, XING)
Pavement markings, symbol type B, solid (yellow)
Pavement markings, type B, solid (white)
Pavement markings, match existing
206+38 match existing
500+00 match existing
300+00 match existing
403+98 pavement markings on Parking Lot and on pathway not in contract
Attachment D – Gros Ventre Roundabout
| GRTE Roadway Striping FY24 Base Contract TO1 SOW |
| Task 1 Provide all paint, labor, equipment and materials to repaint all existing road markings on the Outside Highway (US Highway 26) from the Grand Teton National Park South Boundary to the East Boundary, near Moran, WY (approx. 28 miles) - see Attac... |
| Task 2 Provide all paint, labor, equipment and materials to repaint all existing road markings on the North Park Road (US Highway 89) from the Moran Junction to the John D Rockefeller Parkway North Boundary (approx. 27 miles). See Attachment B. |
| Task 3 Provide all paint, labor, equipment and materials to repaint all existing road markings on the Teton Park Road from Moose Junction to Jackson Lake Junction. Work includes the stop bars at the Moose 4- & 2-Way intersections, Highlands, Lupine Me... |
| Attachment A – Outside Highway |
| Attachment B – North Park Road |
| Attachment C – Teton Park Road |
| Attachment D – Gros Ventre Roundabout |
| Communication Requirements: |
| The contractor shall be required to communicate on a weekly basis to the COR about the work completed during the previous week and the work expected to be completed by the end of the upcoming week. |
| GRTE Roadway Striping FY24 Base Contract TO1 Attachments |
| Attachments A-C |
| Attachment D - Gros Ventre Roundabout |
File details come from the government source that posted it. Updated .