B09_SOW_-_GRTE_Bat_Abatement_-_0040640815_0001.docx
DOCX document 15 KB Posted
- Attached to
- Bat Abatement at Grand Teton National Park
- Solicitation number
- 140P1424Q0002
About this file
This statement of work outlines bat abatement services required at two seasonal housing units located within Grand Teton National Park. The contractor shall perform a full inspection of each log-built 1-bedroom, 1-bathroom cabin to identify all possible bat entry points from the exterior. This includes windows, cracks in soffit and fascia, and any other openings. The contractor must then seal all entry points from the interior of the buildings to permanently prevent future bat access. Work hours are limited to weekdays from 8am to 5pm and must be completed by Thanksgiving 2023 or between April 1st and 20th, 2024. The related federal contract opportunity is solicitation number 140P1424Q0002 for bat abatement services at Grand Teton National Park, issued by the Department of the Interior National Park Service Intermountain Region.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Bat Abatement at Grand Teton National Park 23 October 2023 Background:
Grand Teton National Park is seeking a contractor to perform bat abatement in two of its seasonal housing living quarters to correct health, life, and safety issues caused by the constant entry of bats as soon as practicable.
Places of Performance:
Highlands Housing Area 308 Highland Ranch Road Quarters # 1037 Moose, WY 83012 Lupine Housing Area 400 Kimmel Drive Quarters # 658 Moose, WY 83012
Known Bat Activity:
Highland quarters 1037 bat activity has been in the bathroom walls and ceiling.
Lupine quarters 658 bat activity has been seen inside the living spaces of the cabin. It is unknown how the bat accesses the structure.
Scope of Work:
Both living quarters are log-built buildings located within the respective seasonal housing areas listed above. It is not believed that bats are living in the quarters, but they continuously enter the structures. Both cabins are vacated and will not have tenants move back in until 5/1/2024.
· Work hours will be limited to Monday – Friday, 8:00 am – 5:00 pm.
· These are historic 1 bedroom, ¾ bath housing units.
· All work shall be approved prior to starting to maintain the historic fabric of the buildings from both the exterior and interior of the building.
· A full inspection of the buildings shall be performed to identify all possible entry points into the interior of the building.
· Contractor shall seal all possible entry points from the interior to permanently keep bats from accessing the structures.
· Known possible entry points are windows and exterior cracks in soffit fascia.
· Previously the tenants tried using spray foam on both the exterior and interior of the cabins to fill possible entry points. Contractor shall remove spray foam and properly seal all areas where bats could access the structures.
Period of Performance:
November 2023 – April 2024
Due to weather and seasonal road closures, all work shall be completed either 1) before Thanksgiving 2023; or 2) between 4/1/2024 and 4/20/2024. It is preferred that the work be completed prior to Thanksgiving 2023.
File details come from the government source that posted it. Updated .