This is a Statement of Work (SOW) for radon mitigation system installation at Pecos National Historical Park's two-unit Casita located at Forked Lightning Ranch in Pecos, New Mexico. The Casita, a 2,175-square-foot horseshoe-shaped structure built around 1925, currently has radon levels of 9.4 picocuries per liter (pCi/L), exceeding the EPA residential limit of 4.0 pCi/L. An existing radon mitigation system installed around 2013 is not functioning as intended and requires modification or replacement.
The contractor must conduct a site survey, perform baseline radon testing in both units, complete a Pressure Field Extension Communication test to determine optimal system location, and submit a design proposal to the Contracting Officer for approval that considers both aesthetic and functional aspects of the historic structure. The scope includes modifying or replacing the existing system, with preference for installing external mitigation systems on the north side to minimize visual impact. If the existing system is reused, a new fan must be installed above the roof line; if abandoned, it must be removed with repairs made to the foundation and roof. The project must be completed within 60 calendar days from issuance of the Notice to Proceed, with work limited to 8 a.m. to 4 p.m. Monday through Friday, excluding federal holidays. The contractor must submit accident prevention and construction schedules before the preconstruction conference, provide product data and shop drawings for approval, and deliver as-built drawings, warranty information, and radon testing results at 15 days, 30 days, and six months to verify the system achieves levels below 4.0 pCi/L. The Contracting Officer is Billie Thomas at (406) 599-4402.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P1226Q0041_Amd_0002.pdf | ||
| B09_Attachment_Wage_Determination_per_DBA_NM20260028_05_18_2026_0002.pdf | ||
| Attachment_Q_A_1_2_NPS_Responses_0002.pdf | ||
| Sol_140P1226Q0041_Amd_0001.pdf | ||
| Sol_140P1226Q0041.pdf | ||
| B08_Attachment_2_Wage_Determination_per_DBA_TX20260173.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Install Radon Mitigation in Casitas at Pecos National Historical Park
PART 1 – GENERAL
1.1 Background:
Pecos National Historical Park has a two-unit Casita for Transient and Seasonal Staff located at Forked Lightning Ranch. Radon tests conducted in November of 2024 showed 9.4 picocuries per liter (pCi/L), exceeding the Environmental Protection Agency (EPA) limit of 4.0 pCi/L for residential buildings. A radon mitigation system was installed around 2013, but it appears to not function as intended. This project is to modify existing system or install new systems to reduce the radon levels below 4.0 pCi/L.
The Casita is a 2,175 square, horse shoe shaped, foot block structure constructed around 1925. The current radon mitigation system is centrally located in the East Casita, plumbed into a crawl space and vented through the roof. Due to the historic nature of this structure, a design proposal for the mitigation will be required to be submitted to Pecos National Historical Park prior to work. Both exterior and interior visual appearances should be considered along with functionality. If old system is completely abandoned, it shall be removed and repairs made to both the foundation and roof. If old system is utilized a new fan shall be installed above the roof.
If horizontal boring and external mitigation systems are needed. Every effort should be made to install those systems on the north side of the casita to limit visual impacts. Other systems not envisioned in this scope will be considered and multiple systems may be required due to the shape and size of the building and a site visit is recommended.
Completion of the project will be determined when levels test below 4.0 pCi/L.
1.2 Work Covered by the Contract Documents:
• Project Location: Pecos National Historical Park, 1 Peach Drive, Pecos, NM 87552
• Scope of Work:
1. Conduct a site survey to assess the jobsite and existing system. See Attachments
2. Conduct baseline radon testing in both sides of the Casita.
3. Complete Pressure Field Extension Communication test to determine where Radon
Mitigation System(s) would be best located.
4. Submit design proposal to COR for approval keeping in mind historic nature of building.
Design proposal should include all components as well as new electrical locations.
5. If horizontal boring and external mitigation systems are needed. Every effort should be made to install those systems on the north side of the casita to limit visual impacts.
• Attachment 1 (SOW)– Casita Floor Plan with existing radon vent shown as red circle.
• Period of Performance:
Work must be completed within 60 calendar days from the issuance of the Notice to Proceed
ITEM 2 - EXISTING SYSTEM
• Radon Mitigation System was installed around 2013 and this system may be modified and reused.
If this existing system is utilized, a new fan shall be installed above the roof line.
• Additional electrical drops may be required depending on location. Contractor to determine suitability to adding outlets with existing electrical service.
ITEM 3 - CONTRACTOR’S USE OF PREMISES
• Work hours are limited to 8 a.m. to 4 p.m., Monday through Friday, excluding federal holidays, unless otherwise approved.
• List of Federal Holidays o New Year’s Day (January 1) o Birthday of Martin Luther King, Jr. (Third Monday in January) o Washington’s Birthday (Third Monday in February) o Memorial Day (Last Monday in May) o Juneteenth National Independence Day (June 19) o Independence Day (July 4) o Labor Day (First Monday in September) o Columbus Day (Second Monday in October) o Veterans Day (November 11) o Thanksgiving (Last Thursday in November) o Christmas Day (December 25)
• Contractor must contact Park representative upon arrival to jobsite and prior to commencing work for pre-construction meeting to discuss project compliance and mitigations. No excavations will occur without park provided archaeological monitor.
• Casita may be occupied upon award of this contract. Contractor must alert park seven days prior to work commencing to coordinate with tenants.
• Maintain public safety and minimize inconvenience during construction.
• Storage of Materials: Confine storage of materials to the immediate vicinity of the project site unless arranged by NPS representative.
• Use of Site: Limit use of premises to work areas and do not disturb portions of site beyond areas defined by NPS representative.
• Prevent Damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants at no additional expense to the Government
• Provide temporary barriers to protect existing trees, plants and root zones.
• Do not remove, injure, or destroy trees or other plants without prior approval.
• Do not fasten ropes, cables, or guys to existing trees.
• Carefully supervise excavating, grading, filling, and other construction operations near trees to prevent damage.
• Driveways and Entrances: Keep Driveways and entrances serving premises clear and available to
Government, Government’s employees, and emergency vehicles at all times.
• Cleaning of Equipment: Contractor shall ensure that prior to work, all equipment is free of soil, seeds, vegetative matter, or other debris that could hold or contain seeds.
• Contractors may use restrooms or porta-potties located in the park. Depending on the time of the year, this may require driving approximately 1 mile to Kozlowski Trading Post.
ITEM 4 - EXAMINATION OF THE SITE
• Contractors are encouraged to visit the site to understand project conditions. Contact the Contracting Officer Billie Thomas (406) 599-4402 or Billie_thomas@ios.doi.gov.
ITEM 5 - ACCIDENT PREVENTION
• Develop and submit an Accident Prevention Plan – The plan shall be written to comply with OSHA and project requirements including but not limited to the following:
o Name of responsible supervisor to carry out program o Outline the work and associated hazards and methods proposed to ensure property protection, public safety, NPS personnel and contractor employees.
o Planning for emergency situations o Fire Protection.
• Ensure proper PPE usage, including ANSI-compliant safety gear is available to all contactor’s employees.
• Qualifications of Employees: Ensure that employees are physically qualified to perform assigned duties in a safe manner.
• Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or other to injury.
ITEM 6 - SUBMITTALS
• Provide product data and shop drawings Fiber Optics, Conduit & Vaults for approval prior to work.
• Submit a detailed construction schedule and accident prevention plan before the preconstruction conference.
ITEM 7 - PROJECT CLOSEOUT
• Submit as-built drawings and warranty information for installed components.
• Complete a final inspection, addressing any punch-list items within the specified time frame.
• Provide radon testing results at 15 days, 30 days and six months to prove system is working as designed.
Attachements:
Location of existing radon vent shown with red circle
Photo of radon vent behind water heater
| PART 1 – GENERAL |
| ITEM 2 - EXISTING SYSTEM |
| ITEM 3 - CONTRACTOR’S USE OF PREMISES |
| ITEM 4 - EXAMINATION OF THE SITE |
| ITEM 5 - ACCIDENT PREVENTION |
| ITEM 6 - SUBMITTALS |
| ITEM 7 - PROJECT CLOSEOUT |
File details come from the government source that posted it. Updated .