About this file
This is a Questions and Answers document from the National Park Service Intermountain Region addressing contractor inquiries related to the replacement of shade structures in picnic areas at Chamizal National Memorial (Solicitation 140P1226Q0011).
The document clarifies site access and facility use policies, confirming that contractors may use on-site park restrooms if kept clean but are prohibited from accessing dirt walkways with vehicles and cannot access NPS water facilities for dust mitigation. Regarding materials and construction specifications, the document confirms that 4000 PSI Portland cement concrete is required (pre-mixed or sack options are acceptable without mandatory sample testing), 26-gauge roof panels per the SOW are required with no approved equals permitted, steel rafter-to-post connections must be welded rather than bolted, and steel posts must remain embedded and encased in concrete as specified with no alternative anchor bolt proposals accepted. For site-specific questions, the contractor is directed to maintain the same post location for one canopy that extends outside the concrete path rather than resizing. Additional clarifications address temporary fencing as acceptable for barricades, no density testing required for subgrade backfill, no changes to the originally specified paint type, and confirmation that both an Accident Prevention Plan and Safety Plan are required. The document also confirms that a submittal list or register will be provided post-award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P1226Q0011_Amd_0002.pdf | ||
| Atch_5_Questions_and_Answers_0001.docx | DOCX document | |
| Sol_140P1226Q0011_Amd_0001.pdf | ||
| Atch_2_Technical-Experience_Questionnaire.xlsx | XLSX spreadsheet | |
| Sol_140P1226Q0011.pdf | ||
| Atch_1_SOW_Replace_Shade_Structures.docx | DOCX document | |
| Atch_3_Price_Schedule.xlsx | XLSX spreadsheet | |
| Atch_4_DOL_WD_TX20260245.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
5. Are contractors permitted to access the dirt walkways at each site.
No Vehicles are allowed.
6. Can the Contractor utilize the on-site park restroom.
Yes, as long as they keep it clean.
7. Scope of Work reflects utilizing “4,000 PSI high strength Portland cement-80 lb.,” The Contractor can opt to place 4000 psi plant mixed and does this concrete mix require concrete sample testing? Or will the store-bought sacks reflecting 4000PSI mix satisfy the requirement.
Yes
8. During the site visit, a change of the Paint type was recommended, change to epoxy paint, please confirm this change.
No change
9. Will the backfill of any subgrade require density testing?
No testing
10. Will the contractor have access to NPS water facilities with use of a hose for dust mitigation?
No
11. Will the contractor have access to NPS public restrooms?
Yes, as long as they keep it clean.
12. Are there any specific requirements for the temporary barricades outlined in section 3.1 of the SOW? Will temporary fence be acceptable?
Temporary fence will work.
13. For the steel rafter to steel post connections can these be bolted connections?
No, must be welded by SOW
14. Will the Accident Prevention Plan replace the need for a Safety Plan?
No
15. Will the submittal list or register be provided after award?
Yes
16. Does the government require 26ga roof panels or will an approved equal or better solution be acceptable?
Yes, 26ga roof panels as per SOW
17. Reference Section 4.2 in the SOW document, regarding the requirement for steel posts to be embedded and encased in concrete. The Contractor requests a determination on whether the Government will consider an Alternative Means and Methods proposal for anchor bolt connections in lieu of the specified embedment.
No, as per SOW
18. It was noticed that in one of the canopies, the posts are out of the concrete path. For that specific one, do you want us a smaller canopy to fit within the concrete path, leaving at least 1 ft from the perimeter, or do you want the exact same location for the posts?
No, Same location.