B09 - 140P1221R0001 - Amendment 0004 - Additional Questions and Answers_0004.pdf

PDF 98 KB Posted

Attached to
Replace Underground Fuel Storage Tanks at ROMO
Solicitation number
140P1221R0001
Issued by

About this file

This document contains questions and answers regarding Amendment 0004 to solicitation number 140P1221R0001 to replace underground fuel storage tanks and dispensing stations at Rocky Mountain National Park. The solicitation seeks to replace east and west headquarters underground fuel storage tanks and dispensing stations. Questions addressed include confirmation that laboratory testing and contaminated groundwater removal will be provided separately, compensation for potential rock excavation or unsuitable foundation materials, and prohibiting use of an existing wash bay for dewatering discharge.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE UNDERGROUND FUEL STORAGE TANKS AND DISPENSING STATIONS

ROCKY MOUNTAIN NATIONAL PARK, CO

RFP# 140P1221R0001

AMENDMENT #0004

PRE-PROPOSAL QUESTIONS & ANSWERS

1. QUESTION: Pay for electrical consumption (meter) (015000-1 1.2C) “Use of existing electrical power service will be permitted… (015000-4 3.2H) Which governs?

ANSWER: Both are in effect. Use of existing electrical power service will be permitted with metering and with payment of use charges. For bidding purposes, please assume that electrical use will be metered.

The logistics of metering and payment, if applicable, will be coordinated with appropriate park staff.

2. QUESTION: Laboratory testing for (tanks) closure and preparing closure reports will be provided by an independent third party (Environmental Consultant – EC) as a separate contract provided by the Government. (026500-9 3.1A.5) Please confirm.

ANSWER: Correct.

3. QUESTION: Removal, treatment, and disposal of contaminated groundwater shall be covered under a Contract Modification. (026500-11 3.3C.3) Please confirm.

ANSWER: Correct.

4. QUESTION: Section 012700 DEFINITION OF CONTRACT LINE ITEMS. Bid Line items No.1 and No.2 both contain geotechnical confirmation of conditions. What does that include?

ANSWER: Please see Specification 312000 1.7.

5. QUESTION: Is excavation in rock anticipated? Will the contractor be compensated for rock excavation?

ANSWER: Excavation of rock is not anticipated. If significant rock excavation is required a contract modification will be negotiated.

6. QUESTION: Sheet 14 of 27, general note 2, will contractor be compensated for over excavation and additional aggregate base course, if unsuitable foundation material is encountered?

ANSWER: If significant unsuitable foundation material is encountered the contractor would be compensated through a contract modification.

7. QUESTION: On Sheet C2, just north of Building 83 Oil Shed, there is an existing wash bay. Can this existing wash bay be used as a discharge point for dewatering operations?

ANSWER: No.

File details come from the government source that posted it. Updated .