- SAGU Golden Gate Road Grading and Surface Material Federal contract opportunity
- Solicitation number
- 140P1221Q0091
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140P1221Q0091_Att_3_Wage_Determination.pdf | ||
| 140P1221Q0091_Att_1_SAGU_Golden_Gate_Road_-_Grading_and_Addition_of_Surface_Material_SOW.docx | DOCX document | |
| Sol_140P1221Q0091.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SAGUARO NATIONAL PARK, TUCSON MOUNTAIN DISTRICT:
ADDITION OF SURFACE MATERIAL AND GRADING FOR
GOLDEN GATE ROAD
PMIS: 318986
APPENDIX A
Contracting Officer: Bill Walton
C.O.R.: Sam Bell Facilities Manager: Rich Goepfrich
GENERAL NOTES
1. THE GENERAL AIM OF THIS PROJECT IS TO ADD A 6-INCH COMPACTED LIFT OF AGGREGATE BASE
MATERIAL TO THE EXISTING ROAD AND GRADE TO A SMOOTH SURFACE.
2. REFER TO PROJECT SCOPE OF WORK FOR ADDITIONAL DETAILS.
3. THE LOCATION AND ROUTING OF EXISTING AND PROPOSED SERVICES AND EQUIPMENT SHOWN IN
THESE SKETCHES ARE INDICATIVE ONLY. NOT ALL EXISTING SERVICES ARE SHOWN. THE
CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.
4. THESE SKETCHES ARE SCHEMATIC IN NATURE AND ILLUSTRATE THE GENERAL ARRANGMENT OF
PROPOSED NEW SERVICES AND EQUIPMENT. THESE SKETCHES ARE NOT TO SCALE. THE
CONTRACTOR SHALL FIELD VERIFY SPATIAL REQUIREMENTS AND SERVICES ROUTING BASED ON
EXISTING CONDITIONS AND SHALL MAKE NECESSARY ADJUSTMENTS IN EQUIPMENT PLACEMENT
AND CONNCETION IN ORDER TO ACCOMMODATE EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. NOT ALL EXISTING SERVICES TO BE MODIFIED OR RELOCATED ARE SHOWN IN THESE SKETCHES. THE
CONTRACTOR SHALL COORDINATE MODIFICATION OR RELOCATION OF THESE SERVICES
AS REQUIRED TO ACHIEVE THE GENERAL AIM OF THIS PROJECT AT NO ADDITIONAL COST TO THE
GOVERNMENT.
PROJECT AREA HIGHLIGHTED IN RED: 1.5 MILES
Figure 1. Map of Project Area.
SBell Pencil
Figure 2.
Looking S.E. down Signal Hill Road, from Signal Hill Picnic Area.
Pull-outs to be included in project.
Figure 3.
Looking West down Golden Gate Rd. from Signal Hill turn-off
Figure 4.
Wash crossing Golden Gate Rd. with water bar on opposite side.
Figure 5.
One-way around Signal Hill Picnic Area to be included in project.
(including pullouts)