140P1221Q0091_Att_2_Appendix_A_-_Notes_Map_and_Pics.pdf

PDF 12 MB Posted

Attached to
SAGU Golden Gate Road Grading and Surface Material Federal contract opportunity
Solicitation number
140P1221Q0091
Issued by
Department of the Interior National Park Service Intermountain Region

View the file

Other files for this federal contract opportunity

Other files attached to SAGU Golden Gate Road Grading and Surface Material, newest first.
File Type Posted
140P1221Q0091_Att_3_Wage_Determination.pdf PDF
140P1221Q0091_Att_1_SAGU_Golden_Gate_Road_-_Grading_and_Addition_of_Surface_Material_SOW.docx DOCX document
Sol_140P1221Q0091.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAGUARO NATIONAL PARK, TUCSON MOUNTAIN DISTRICT:

ADDITION OF SURFACE MATERIAL AND GRADING FOR

GOLDEN GATE ROAD

PMIS: 318986

APPENDIX A

Contracting Officer: Bill Walton

C.O.R.: Sam Bell Facilities Manager: Rich Goepfrich

GENERAL NOTES

1. THE GENERAL AIM OF THIS PROJECT IS TO ADD A 6-INCH COMPACTED LIFT OF AGGREGATE BASE

MATERIAL TO THE EXISTING ROAD AND GRADE TO A SMOOTH SURFACE.

2. REFER TO PROJECT SCOPE OF WORK FOR ADDITIONAL DETAILS.

3. THE LOCATION AND ROUTING OF EXISTING AND PROPOSED SERVICES AND EQUIPMENT SHOWN IN

THESE SKETCHES ARE INDICATIVE ONLY. NOT ALL EXISTING SERVICES ARE SHOWN. THE

CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS.

4. THESE SKETCHES ARE SCHEMATIC IN NATURE AND ILLUSTRATE THE GENERAL ARRANGMENT OF

PROPOSED NEW SERVICES AND EQUIPMENT. THESE SKETCHES ARE NOT TO SCALE. THE

CONTRACTOR SHALL FIELD VERIFY SPATIAL REQUIREMENTS AND SERVICES ROUTING BASED ON

EXISTING CONDITIONS AND SHALL MAKE NECESSARY ADJUSTMENTS IN EQUIPMENT PLACEMENT

AND CONNCETION IN ORDER TO ACCOMMODATE EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. NOT ALL EXISTING SERVICES TO BE MODIFIED OR RELOCATED ARE SHOWN IN THESE SKETCHES. THE

CONTRACTOR SHALL COORDINATE MODIFICATION OR RELOCATION OF THESE SERVICES

AS REQUIRED TO ACHIEVE THE GENERAL AIM OF THIS PROJECT AT NO ADDITIONAL COST TO THE

GOVERNMENT.

PROJECT AREA HIGHLIGHTED IN RED: 1.5 MILES

Figure 1. Map of Project Area.

SBell Pencil

Figure 2.

Looking S.E. down Signal Hill Road, from Signal Hill Picnic Area.

Pull-outs to be included in project.

Figure 3.

Looking West down Golden Gate Rd. from Signal Hill turn-off

Figure 4.

Wash crossing Golden Gate Rd. with water bar on opposite side.

Figure 5.

One-way around Signal Hill Picnic Area to be included in project.

(including pullouts)

Blank Page
Blank Page
Blank Page
Blank Page
Blank Page

File details come from the government source that posted it. Updated .