Attachment_O_Interior_Elevations_Visitor_Contact_Station_Drawings_September_2020_0001.pdf

PDF 870 KB Posted

Attached to
CEBR-INTERPRETIVE EXHIBITS
Solicitation number
140P1221Q0085
Issued by

View the file

Other files

File Type Posted
Attachment_F__Specifications_AV_Prod-MM_Plan_Design_Prod_0001.pdf PDF
Attachment_E__Programatic_Guidelines_for_Interpretive_Media_February_2012_0001.pdf PDF
Attachment_A_Museum_Exhibit_Planning_and_Design_Specifications_April_2016_consisting_of_93_pages_0001.docx DOCX document
Attachment_H_Wayside_Exhibit_Map_Standards_May_25__2005__consisting_of_14_pages_0001.pdf PDF
Attachment_B_Museum_Exhibit_Fabrication_Specifications_April_2016_consisting_of_80_pages_0001.docx DOCX document
Attachment_J_CEBR_Foundation_Document_December_2015__consisting_of_70_pages_0001.pdf PDF
Attachment_G_Specifications_for_Audiovisual_Presentation_Systems_and_Equipment_December_2013_0001.pdf PDF
Attachment_I_Digital_Image_Guide_March_2010__consisting_of_nine_pages_0001.pdf PDF
Attachment_M_Exterior(Red)_and_Interior(Blue)_Spaces_Avaiable_for_Exhibits_0001.pdf PDF
Attachment_N_Floor_Plan_and_Exterior_Elevations_Visitor_Contact_Station_Drawings_September_2020_0001.pdf PDF
Sol_140P1221Q0085_Amd_0001.pdf PDF
Attachment_C_Editorial_Style_Guide_2018__consisting_of_30_pages_0001.pdf PDF
140P1221Q0085_Q_and_A_Responses_0001.docx DOCX document
Attachment_D_Exhibit_Conservation_Guidelines__Special_Edition_2013__consisting_of_1_778_pages_0001.pdf PDF
Attachment_K_Past_Performance_Questionnaire_0001.pdf PDF
Attachment_L_Sample_of_Work_Form_0001.pdf PDF
P1221Q0085_Att_1_CEBR-Visitor_Contact_Station_-_Exhibit_SOW.docx DOCX document
Sol_140P1221Q0085.pdf PDF
P1221Q0085_Att_2_Wage_Determination_2015-5495R14.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES

1. ALL WET AREAS SHALL HAVE MOISTURE RESISTANT GWB AND CTBB BEHIND WALL TILE. (MATCH

THICKNESS OF CTBB TO GWB)

2. ALL EXPOSED FINISHED WOOD WORK (T&G CEILING, WOOD JOISTS AND COLUMNS, TRIM, ETC.) SHALL

BE SANDED SMOOTH, STAINED AND SEALED, COLOR AS SELECTED BY CONTRACTING OFFICER.

3. ALL GWB THROUGHOUT SHALL BE PAINTED. COLOR SHALL BE SELECTED BY CO.

FLOOR FINISH KEY:

CONC - SEAL = SEALED CONCRETE

CONC - STN = POLISHED, STAINED, AND SEALED CONCRETE

EPOXY = FLUID APPLIED EPOXY FLOORING WITH 6" INTEGRAL BASE

CPT = CARPET

WALL FINISH KEY:

GWB = GYPSUM WALL BOARD (MOISTURE RESISTANT AT WET AREAS)

PT-1 = PAINT FINISH, BASE COLOR

PT-2 = PAINT FINISH, ACCENT COLOR

BF/EP = BLOCK FILLER AND EPOXY PAINT AT CONC BLOCK WALLS

WALL BASE KEY:

EPOXY = EPOXY BASE

WD = WOOD BASE

RB = RUBBER BASE

CEILING FINISH KEY:

OPEN = OPEN TO STRUCTURE (REFINISH WOOD T&G CEILING AND WOOD STRUCTURE)

GWB = GYPSUM BOARD CEILING - PAINTED WHITE

D

HF

E GA B C

3.5

6.5

WOMEN'S

MEN'S

JAN.

UNISEX

ASTRO

STORAGE

STOR &

IT

HALL

TS

TS

TS

TD

TD

TD

TD

TD

TD

STAFF

RR

OFFICE

NHA

OFFICE

4' - 0"

TS TD

3.2

C.7C.1

6.8

TS

/4

VEST.

VISITOR

CONTACT

SPACE

TD

FINISH PLAN LEGEND

FLUID APPLIED EPOXY FLOORING

WITH INTEGRAL BASE

POLISHED, STAINED, AND SEALED

CONC

CPT

WALK-OFF MAT

SEALED CONC (NO STAIN)

PROVIDE T&G SHIPLAP SIDING

THRESHOLD

TRANSITION STRIP

TD

TS

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF9/

/2

8:

:4

P

M C

:\U se rs \lo ga nb on d\

D es kt op

\2

N

P S

C E

D A

R B

R E

A K

S _R

L B

.r vt

A6.1

ADE

VISITOR CONTACT CENTER

CEDAR BREAKS NATIONAL MONUMENT

147064

163432

LWB

09/11/2020 44 108

FINISH PLAN &

SCHEDULE

SCALE OF FEET

16808

SCALE A

ROOM FINISH SCHEDULE

ROOM

NUMBER NAME

FLOOR

FINISH

CEILING

FINISH

NORTH WALL EAST WALL SOUTH WALL WEST WALL

COMMENTS

WALL

FINISH BASE

WALL

FINISH BASE

WALL

FINISH BASE

WALL

FINISH BASE

101 ASTRO STORAGE CONC -

SEAL

GWB GWB RB GWB RB GWB RB GWB RB

102 OFFICE CPT GWB GWB RB GWB RB GWB RB GWB RB

103 STAFF RR EPOXY GWB CT-1 / GWB EPOXY CT-1 / GWB EPOXY CT-1 / GWB EPOXY CT-1 /GWB EPOXY

104 NHA OFFICE CPT GWB GWB RB GWB RB GWB WD GWB RB

105 STOR & IT CONC -

SEAL

GWB GWB RB GWB RB GWB RB GWB RB

106 VISITOR CONTACT

SPACE

CONC - STN

- SEAL

T&G GWB WD GWB WD GWB/T&G WD GWB WD T&G CLNG - STN

107 VEST. MTL GRATE T&G T&G WD - - T&G WD T&G WD WALK-OFF MAT

108 HALL CPT GWB GWB WD GWB WD GWB WD GWB WD

201 WOMEN'S EPOXY GWB BF/EP EPOXY CT-1 / GWB EPOXY CT-1 / GWB EPOXY CT-1 EPOXY

202 UNISEX EPOXY GWB BF/EP EPOXY CT-1 / GWB EPOXY CT-1 / GWB

& BF/EP

EPOXY CT-1/GWB EPOXY

203 JAN. CONC -

SEAL

GWB BF/EP EPOXY BF/EP EPOXY BF/EP EPOXY CT-1 /GWB EPOXY

204 MEN'S EPOXY GWB CT-1 / GWB EPOXY CT-1 / GWB EPOXY BF/EP EPOXY CT-1 EPOXY

PRELIMINARY

NOT FOR

CONSTRUCTION

%100 DRAFT CD

A6.1

FINISH PLAN1

SCALE A

E13E13E13

E14

E15

E4

E15

E38E38

A8.3

E15

E34

E13E13

E35 E35

E38

MULTILEVEL TRANSACTION

COUNTER: REF. A8.4

10' - 10 1/4"

E13E13

E15E15

E33 E35E35

E38E38

E13E13

E15

E33

E13E13

E35 E35

E38E38

GENERAL NOTES

1. WD T&G AND STONE SHOWN FOR GRAPHIC

REPRESENTATION ONLY - NOT TO SCALE.

2. FIXTURES SHOWN FOR GRAPHIC PURPOSES ONLY: REF.

PRODUCT FILE.

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF9/

/2

8:

:4

P

M C

:\U se rs \lo ga nb on d\

D es kt op

\2

N

P S

C E

D A

R B

R E

A K

S _R

L B

.r vt

A7.0

ADE

VISITOR CONTACT CENTER

CEDAR BREAKS NATIONAL MONUMENT

147064

163432

LWB

09/11/2020 45 108

INTERIOR

ELEVATIONS

A7.0

INTERP. SPACE / BOOKSTORE NORTH1

A7.0

BOOKSTORE EAST2

A7.0

INFO COUNTER SOUTH3

A7.0

INTERP. SPACE WEST4

PRELIMINARY

NOT FOR

CONSTRUCTION

%100 DRAFT CD

SCALE OF FEET

SCALE A

SCALE ASCALE A

SCALE A SCALE A

KEYNOTES

E4 STONE VENEER ON FRAME CONSTRUCTION AT CHIMNEY:REF.

A8.3.

E13 SURFACE MOUNTED UNIT HEATER: REF. MECH.

E14 WD BURNING FIREPLACE INSERT.

E15 1X10 WD BASE TRIM- STN.

E33 WD T&G FINISH - OPAQUE STN.

E34 WD T&G FINISH - STN TO MATCH GLUEL-AMS.

E35 GLUELAM BEAM: REF. STRUC. - STN.

E38 GWB - PT, TYP.

E15 E13

E38

105A

E13 E15

E38

E15

E3 E38

E15

E38

E30

E13

E38

105B

E30

E13

E38

E30

E3

E38

105A

E30

E13

E38

E15 E15

E38

E15 E13

E38

E15

E3 E38

101A

E15

E38

E30

E13

E38

101A

E30

E13

E38

E30

E13

E38

101B

E30

E38

E15

E32

E38

E15

E32

E38

E15

E19

E38

E15

E19

E38

GENERAL NOTES

1. FOR ROOMS 102 & 104 ALL DR AND STOREFRONT TRIM IS TO BE A 1X4

TITLE OF SHEETSUB SHEET NO.DESIGNED:

TECH REVIEW:

DATE:

DRAWING NO.

PMIS/PKG NO.

SHEET

OF9/

/2

8:

:5

P

M C

:\U se rs \lo ga nb on d\

D es kt op

\2

N

P S

C E

D A

R B

R E

A K

S _R

L B

.r vt

A7.1

ADE

VISITOR CONTACT CENTER

CEDAR BREAKS NATIONAL MONUMENT

147064

163432

LWB

09/11/2020 46 108

INTERIOR

ELEVATIONS

PRELIMINARY

NOT FOR

CONSTRUCTION

%100 DRAFT CD

SCALE OF FEET

SCALE A

KEYNOTES

E3 AL STOREFRONT WINDOW SYSTEM: REF. STOREFRONT ELEVATIONS A6.0.

E13 SURFACE MOUNTED UNIT HEATER: REF. MECH.

E15 1X10 WD BASE TRIM- STN.

E19 ELEC CABINET: REF. ELEC.

E30 4" RUBBER BASE.

E32 SERVER CABINET AND PLYWD BACKERBOARD: REF. ELEC.

E38 GWB - PT, TYP.

A7.1

NHA OFFICE 104 NORTH1

A7.1

NHA OFFICE 104 EAST2

A7.1

NHA OFFICE 104 SOUTH3

A7.1

NHA OFFICE 104 WEST4

A7.1

STOR & IT NORTH5

A7.1

STOR & IT EAST6

A7.1

STOR & IT SOUTH7

A7.1

STOR & IT WEST8

A7.1

OFFICE 102 NORTH9

A7.1

OFFICE 102 EAST10

A7.1

OFFICE 102 SOUTH11

A7.1

OFFICE 102 WEST12

A7.1

STORAGE 101 NORTH13

A7.1

STORAGE 101 EAST14

A7.1

STORAGE 101 SOUTH15

A7.1

STORAGE 101 WEST16

A7.1

HALL 108 NORTH17

A7.1

HALL 108 EAST18

A7.1

HALL 108 SOUTH19

A7.1

HALL 108 WEST20

File details come from the government source that posted it. Updated .