Attachment_9_Vessel_Information_Form__0004.docx

DOCX document 17 KB Posted

Attached to
BOEM Study-Sand, sediments and critical minerals Federal contract opportunity
Solicitation number
140M0126Q0031
Issued by
Department of the Interior Bureau of Ocean Energy Management

About this file

This is a Vessel Information Form template that quoters must complete for each proposed vessel in response to BOEM Study-Sand, sediments and critical minerals solicitation (140M0126Q0031). The form is designed to capture comprehensive vessel specifications and pricing information for offshore survey operations supporting the Bureau of Ocean Energy Management's identification of sand, sediment, and critical mineral resources along the Outer Continental Shelf off Southwest Florida.

The form requires quoters to provide detailed vessel specifications including vessel name, owner/operator information, proposed role, vessel type/class, home port, physical dimensions (length/beam/draft), passenger and crew capacity, maximum offshore endurance, operating limitations, deck space and load capacity, and specialized capabilities such as crane, A-frame, winch, or lifting equipment. Additional required information includes survey equipment supported, coring/sampling equipment capabilities, power/data connections, required certifications and documentation, safety management systems, availability during the period of performance, and prior relevant project experience. For vessel pricing, quoters must itemize costs including daily vessel rate, number of proposed days, minimum day commitments, mobilization and demobilization costs, standby/weather day rates, extended operating rates, fuel costs (if not included in daily rate), crew costs (if separately priced), equipment costs, port and harbor fees, insurance and permit costs, and any other vessel-related expenses, with a total proposed cost and statement of pricing assumptions and limitations.

View the file

Other files for this federal contract opportunity

Other files attached to BOEM Study-Sand, sediments and critical minerals, newest first.
File Type Posted
Sol_140M0126Q0031_Amd_0004.pdf PDF
Sol_140M0126Q0031_Amd_0003.pdf PDF
B09_Amendment__3_Q_A_Responses_0003.pdf PDF
Attachment_8_Pricing_Sheet_Contractors_0003.xlsx XLSX spreadsheet
Attachment_7_Sample_CM_Tables_SHARC_MMIS_20260721_0003.xlsx XLSX spreadsheet
B09_SW_Florida_SOW_Version_5_blueline__Amendment_3_0003.pdf PDF
B09_SW_Florida_SOW_Version_5_clean_Amendment_3_0003.pdf PDF
Sol_140M0126Q0031_Amd_0002.pdf PDF
B09_Attachment_1_QA_Answers_FINAL_0001.pdf PDF
Sol_140M0126Q0031_Amd_0001.pdf PDF
Sol_140M0126Q0031.pdf PDF
B08_Addendum-_final_SAM_gov.pdf PDF
Attachment_3_Task_Pricing.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 9 – Vessel Information Form Quoters shall complete this form for each proposed vessel. If more than one vessel is proposed, submit a separate form for each vessel.

Item
Quoter Response

Vessel name

Vessel owner/operator

Vessel provided by prime or subcontractor

Proposed vessel role

Vessel type/class

Home port / mobilization location

Length / beam / draft

Passenger/crew capacity

Maximum offshore endurance

Operating area limitations, if any

Sea-state/weather operating limitations

Deck space and load capacity

Crane, A-frame, winch, or lifting capability, if applicable

Survey equipment supported

Coring/sampling equipment supported

Power/data connection availability for survey equipment

Required certifications, inspections, or documentation

Safety plan or safety management system

Availability for proposed period of performance

Prior relevant projects performed using this vessel

Vessel Pricing

Cost Element
Quoter Response

Daily vessel rate

Number of proposed vessel days

Minimum day commitment, if applicable

Mobilization cost

Demobilization cost

Standby/weather day rate

Overtime or extended operating day rate, if applicable

Fuel included in daily rate? If no, provide estimated fuel cost

Crew included in daily rate? If no, provide estimated crew cost

Equipment included in daily rate? If no, identify separately priced equipment

Port, docking, or harbor fees, if applicable

Insurance, inspection, or permit costs, if separately priced

Other vessel-related costs

Total proposed vessel-related cost

Vessel pricing assumptions, exclusions, or limitations

File details come from the government source that posted it. Updated .