Sheet_05-Culvert_1-Section_Views_0001.pdf
PDF 845 KB Posted
- Attached to
- BLM-WY CFO Aluminum Box Culvert Federal contract opportunity
- Solicitation number
- 140L6225Q0026
About this file
The document is a technical drawing showing multiple section views (station views) of what appears to be an aluminum box culvert design. The views are labeled from STA.0+25 to STA.3+20, depicting cross-sectional profiles with grid lines and precise geometric measurements. This drawing is part of the technical specifications for the BLM-WY CFO Aluminum Box Culvert project (Solicitation Number 140L6225Q0026), which requires an aluminum box culvert designed to allow fish passage for the Paint Creek Project in Cody, Wyoming. The solicitation is a small business set-aside for commercial items, with delivery required at the Park County Public Works Department Road and Bridge Division by October 1, 2025, and quotes to be evaluated based on meeting project specifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sheet_03-Culvert_1-Grading_Plan_0001.pdf | ||
| Sheet_02-Culvert_1-Existing_Conditionsl_0001.pdf | ||
| Sol_140L6225Q0026_Amd_0001.pdf | ||
| Sheet_06-Culvert_1-Details_0001.pdf | ||
| Attachment_3_Questions_Addressed_0001.pdf | ||
| Sheet_04-Culvert_1-Plan_Profile_0001.pdf | ||
| Sol_140L6225Q0026.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Attachment_2_-_Clauses_and_Provisions.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .