140L6221Q0026_QUESTIONS_AND_ANSWERS_AMD_0001_0001.pdf

PDF 95 KB Posted

Attached to
SF ELK CREEK GUZZLER INSTALLATION
Solicitation number
140L6221Q0026
Issued by

View the file

Other files

File Type Posted
140L6221Q0026_AMD_001_UPDATED_BID_SCHEDULE_ELK_CREEK_GUZZLER_0001.xlsx XLSX spreadsheet
Sol_140L6221Q0026_Amd_0001.pdf PDF
Guzzler Layout2.pdf PDF
NE Nevada Water Catchment.pdf PDF
SFElkCreek Guzzler Access.pdf PDF
Guzzler Layout.pdf PDF
02378 Riprap and Rock Lining.docx DOCX document
01009 Gen Info Req SFElkCreekWildlifeGuzzlerProject.docx DOCX document
SFElkCreek Guzzler.pdf PDF
Sol_140L6221Q0026.pdf PDF
Bid Schedule Elk Creek Guzzler Installation.xlsx XLSX spreadsheet
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140L6221Q0026

AMENDMENT: 0001

Q1. The bid schedule items 3, 4, and 6, don’t seem to be mentioned or described anywhere else. Could we have a fuller description of the work involved to complete these items? Is the contractor responsible for disposing of these materials?

A1. There is no fence, culvert, or tank to be removed from this site. An updated Bid Schedule has been included to show this change.

The contractor is responsible for the disposing of all materials as per Section 01009 3.5.A.

Q2. Are GPS coordinates available or other detailed instructions that would enable the site to be found in order to observe site conditions?

A2. GPS coordinates could be provided for the guzzler location, though there are overview maps that show the access road that will be followed.

Q3. Is the BLM going to deliver the guzzler materials to the site? Or where will we pick them up?

A3. The contractor is responsible for hauling all materials for this contract to the site from Worland ware yard on West River Road (RD 433).

4. It seems the only material to be provided by contractor is the rock cobble. Is this correct?

A4. Yes, the rock cobble is what is required by the contractor to provide as per Section 01009 2.0.