Sol_140L5725R0003_Amd_0001.pdf
PDF 89 KB Posted
- Attached to
- Calf Creek Bridge Replacement Federal contract opportunity
- Solicitation number
- 140L5725R0003
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for the Calf Creek Bridge Replacement project. Amendment 0001, issued by the Bureau of Land Management (BLM) Utah State Office, incorporates site visit notes and addresses a question about guardrail takeoff lengths. The amendment references specific standard drawings from the Utah Department of Transportation and U.S. Department of Transportation for guardrail details.
The solicitation (140L5725R0003) maintains its original proposal due date of 09/26/2025 at 2:00 PM Mountain Time, with a performance period from 11/01/2025 to 01/07/2027. The amendment provides clarification on guardrail specifications by directing bidders to refer to standard drawings BA 4B2A and project drawing 617-21, specifically detailing railing extensions on the bridge as shown in sheet S-012.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140L5725R0003_Amendment_0001_-_Attachment_08_Site_Visit_Notes_Images_0001.pdf | ||
| Sol_140L5725R0003.pdf | ||
| 140L5725R0003_Attachment_07_Limitations_on_Subcontracting_Breakout.xlsx | XLSX spreadsheet | |
| 140L5725R0003_Attachment_06_Wage_Determination_UT20250009_01_03_2025.pdf | ||
| 140L5725R0003_Attachment_02_Drawings.pdf | ||
| 140L5725R0003_Attachment_03_Supplamental_Drawings.pdf | ||
| 140L5725R0003_Attachment_04_GSENM_Calf_Creek_EA_Final.pdf | ||
| 140L5725R0003_Attachment_05_Bid_Schedule.xlsx | XLSX spreadsheet | |
| 140L5725R0003_Attachment_01_Specifications.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L5725R0003 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LUA
SALT LAKE CITY UT 84101
440 WEST 200 SOUTH, SUITE 500
BLM UT-STATE OFC ADM SVCS BR(UT952)
09/12/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/25/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Calf Creek Bridge Replacement
Amendment 0001 incorporates the following:
1) Incorporate 140L5725R0003 Amendment 001 - Attachment 08 Site Visit Notes Images
2) Question - Is it possible to get a guardrail takeoff for lengths?
Answer - Refer to Utah Department of Transportation standard drawing BA 4B2A & U.S.
Department of Transportation standard drawings attached to the project drawing 617-21 for lengths that extend beyond the railing on the bridge. See detail 2 on sheet S-012 for details along bridge.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tori Blunt Mayes
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L5725R0003/0001
Proposal due date remains 09/26/2025 by 2:00 PM
MT.
Period of Performance: 11/01/2025 to 01/07/2027
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .