140L5725Q0002_-_Attachment_01_-_Statement_of_Work_Revision_01_0001.pdf

PDF 215 KB Posted

Attached to
PRICE FO VAULT TOILET PUMPING
Solicitation number
140L5725Q0002
Issued by

About this file

This is a Statement of Work outlining requirements for vault toilet pumping services at BLM facilities in Carbon and Emery Counties, Utah. The contractor must provide on-call pumping services 1-2 times per month during busy season (Spring to Fall), including all equipment, labor, transportation, and supplies needed to pump, clean, disinfect and dispose of waste from toilet vaults.

Key requirements include: responding within 24 hours to confirm service after notification and completing work within 5 calendar days; using a septic pumper truck with 4-inch minimum suction hose capable of reaching 60 feet; removing all waste and debris through cleanouts; washing vault walls; charging empty vaults with 100 gallons of clean water; proper disposal at licensed facilities; maintaining disposal records for 3 years; working between 8:00 AM - 5:00 PM except for emergencies; and following all security/safety protocols for cleanout hatches. Deficient work must be corrected within 48 hours or result in non-payment. The contractor is responsible for all disposal fees and must comply with all federal, state and local regulations regarding waste handling and disposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Vault Toilet Pumping Services Summary of Work

SUMMARY OF WORK

PRICE FIELD OFFICE

PART 1: GENERAL

1.1 SUMMARY

A. Description of Work: Contractor shall furnish, on a call when needed basis, toilet pumping services which includes all equipment, supervision, transportation, labor, operating supplies, and incidentals necessary to pump, wash down, cleanup, disinfect, and dispose of all waste products removed from toilet vaults, in accordance with the following contract specifications and in accordance with State and Federal regulations.

B. Frequency and Dates of Work: The frequency and exact dates when services will be required cannot be pre-determined. The work expected to be performed based on previous use is shown in the Estimated Minimum Work and Schedule and is reflected in the Bid Schedule. Service calls are expected 1-2 a month during busy season (Spring to Fall).

C. Scheduling of Work: The Contracting Officer (COR) shall notify the Contractor of the required servicing. This initial notification shall be by phone. Within twenty-four (24) hours of the initial notification, the Contractor shall confirm by phone the date and time of the scheduled servicing.

The Contractor shall complete the pumping services within five (5) calendar days after the initial notification. Response time for emergency servicing shall be by mutual agreement between both parties. Where feasible, multiple toilets within a group (as defined in the attached schedule) will be serviced on the same trip. Pumping of individual toilets outside of the scheduled group may be requested by the COR.

D. Definitions:

1. Sewage: liquid, semi-liquid, and solid waste matter contained in vault.

2. Debris: all other refuse found in vault, to include but not limited to items such as cans, bottles, rocks, sticks and logs, animals or animal parts, clothing, plastic bags and containers, metal products, pinecones, food products, cardboard and paper products, whole rolls of toilet paper, tools, diapers and sanitary napkins, and other miscellaneous trash.

3. Waste Material: sewage and debris.

1.2 QUALITY ASSURANCE

A. Quality Assurance: The work shall be inspected as stated in 3.2. Deficient work shall be corrected as stated in 3.3.

1.3 SITE CONDITIONS

A. Access to Work Sites: Most sites are accessible via paved roads. A few sites are accessed by maintained graveled roads.

B. Hours of Work: Work shall be scheduled so that it is accomplished between the hours of 8:00 A.M. and 5:00 P.M.; emergency pumping may occur outside of these hours.

C. Security/Safety: Cleanouts from which servicing shall be performed are covered with hatches.

The cleanout hatches are either bolted in place or hinged with a lock for visitor safety. The Contractor shall be responsible for unbolting/unlocking the hatch to gain access to the cleanout and replacing the bolts or re-locking immediately after servicing is complete. At no time, shall the Contractor leave an uncovered cleanout hatch unattended.

1.4 PLACE OF PERFORMANCE

A. Work under this Contract is in Carbon and Emery Counties. See Location Map and attached

PART 2: PRODUCTS (not applicable)

2.1 ODOR CONTROL

A. No odor control required. The Government will provide and apply this treatment.

PART 3: EXECUTION

3.1 MEETINGS

A. Pre-Work Meeting: Shall be held prior to the start of the work. The Contractor will be notified in advance of the meeting time, date, and place. The purpose will be to review required work, invoicing, and other administrative provisions of the Contract.

3.2 INSPECTIONS

A. Method: The work will be inspected randomly by the COR on the scheduled date and time of pumping services.

3.3 DEFICIENT WORK

A. Remedy: If work is found to be deficient, the Contractor shall be notified by the COR immediately and will have forty-eight (48) hours in which to correct the work. The Contractor shall notify the COR immediately after work is corrected. Deficient work is defined as, but not limited to, waste and debris remaining in vault, riser, or in the building, waste and/or debris not disposed of in an approved off-site facility, and vault not charged after pumping.

B. Penalty: Deficient work not corrected by the Contractor in the prescribed time shall result in non-payment of bid item.

3.4 EQUIPMENT

A. Contractor shall use a septic pumper truck with a four (4) inch minimum suction hose.

B. Suction hose shall accommodate a maximum distance from road to vault cleanout of sixty (60) feet.

C. All equipment shall be in conformance with Federal, State, and local regulations.

3.5 PUMPING SERVICE

A. Contractor shall remove waste and debris material from vault through the cleanout.

B. Before pumping service begins, Contractor shall fill the vault with sufficient water to facilitate removal of all waste materials.

C. Contractor shall expect debris to be mixed in with sewage and shall be prepared to remove debris either manually or by pumping.

D. Interior vault walls shall be washed by a hose with sufficient pressure to remove clinging waste material. Hose washing shall occur through the cleanout.

E. No waste material shall remain in the vault after pumping services are complete.

F. Contractor shall charge the empty vault with a minimum of 100 gallons of clean water.

G. Clean and disinfect all contaminated areas outside the vault resulting from the pumping services. Wash all waste material that spilled on the concrete surrounding the cleanout back into the vault. Clean the cleanout hatch and re-bolt into place.

H. If any pumping services occurred inside the restroom the entire restroom shall be cleaned and disinfected, including the toilet seat and riser, walls, door and handles, floor, ceiling, and replacement of toilet tissue if necessary.

3.6 DISPOSAL OF SEWAGE AND DEBRIS

A. The Contractor shall be responsible for waste material disposal and all fees associated with disposal. The Contractor shall conform to all Federal, State, and local laws and ordinances regarding disposal of waste material. Sewage removed from BLM vaults must be disposed of in a licensed or permitted sewage disposal facility. Proof of proper disposal may be required.

Documentation of proper disposal shall be maintained in the contractor’s records for a minimum of three (3) years.

B. The Contractor shall prevent spillage and haul waste material in watertight containers.

Contractor’s handling of waste material shall conform to all applicable health regulations.

C. The Contractor shall dispose of all debris that is removed from the vault toilets in an approved off-site facility in conformance with Federal, State, and local regulations.

PART 4: MEASUREMENT AND PAYMENT

4.1 METHOD OF MEASUREMENT

A. Units: Each is the measurement unit.

B. Each: One unit (each) shall be one pumping service as described in 3.5 and 3.6 for each vault at the work site.

4.2 PAYMENT

A. Payments: Prices and payment will be full compensation for the work described in this section.

Payment will be as shown in the Bid Schedule.

B. Invoicing: Invoices shall be submitted in a timely manner after performance of each request.

END OF SECTION

File details come from the government source that posted it. Updated .