140L5724R0005_Attachment_05_Limitations_on_Subcontracting_Breakout.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- Otter Creek Culverts Replacement Federal contract opportunity
- Solicitation number
- 140L5724R0005
About this file
This document is a Limitations on Subcontracting Breakout for Solicitation Number 140L5724R0005 for the Otter Creek Culverts project. The solicitation has a small business set-aside with a 15% self-performance requirement. The contract performance period is 120 calendar days after issuance of the Notice to Proceed. The document provides a template for the contractor to break out the total proposed amount into the following categories: total material cost, self-performed labor, small business subcontractor labor, and large business subcontractor labor. The contractor must ensure the limitation on subcontracting percentage, calculated as (total labor cost - total amount paid to large business subcontractors) / total labor cost, is greater than the 15% self-performance requirement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L5724R0005_Amd_0003.pdf | ||
| Amendment_0003_140L5724R0005_Updated_Section_M_0003.pdf | ||
| Sol_140L5724R0005_Amd_0002.pdf | ||
| Amendment_0002_140L5724R0005_Attachment_06_Site_Tour_Notes-Q_A_0002.pdf | ||
| Amendment_0001_140L5724R0005_Otter_Creek_Culvert_Replacement_0001.pdf | ||
| Sol_140L5724R0005_Amd_0001.pdf | ||
| Sol_140L5724R0005.pdf | ||
| 140L5724R0005_Attachment_02_Drawings.pdf | ||
| 140L5724R0005_Attachment_03_Bid_Schedule.xlsx | XLSX spreadsheet | |
| 140L5724R0005_Attachment_01_Specifications.pdf | ||
| 140L5724R0005_Attachment_04_Wage_Determination_UT20240015_01-05-2024.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L5724R0005 |
| Type of Set Aside | Small Business |
| Performance Period | 120 calendar days after issuance of the NTP |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .