Amendment_0002_-_140L5724R0001_Attachment_03_Bid_Schedule_0002.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Calf Creek Recreation Area Redevelopment
Solicitation number
140L5724R0001
Issued by

About this file

This bid schedule outlines the line items and quantities for the Calf Creek Recreation Area Redevelopment project solicited by the Bureau of Land Management Utah Region under solicitation number 140L5724R0001. Key work includes existing conditions demolition, site work such as concrete, retaining walls, fire rings, tent pads and tables, earthwork including campsite clearing and walkway surfaces, stream diversion, and revegetation. The schedule provides unit pricing for over 20 separate line items and also includes additive schedules for additional shade structures, tables, and a pavilion. Pricing is to be provided by prospective bidders for consideration and award of the contract.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Schedule

BID SCHEDULE
140L5724R0001 Calf Creek Recreation Area Redevelopment
Base Bid
GAOAQUANTITIESCOST
# UnitsUnit of MeasureUnitTotal
ITEMDESCRIPTION
Mobilization - Division 00 Mobilization
1Mobilization1LS$ - 0$ - 0
Site Work- Division 02 Existing Conditions - Demolition
2Shade Shelter with Footing3EA$ - 0$ - 0
3Typical Campsite Demolition: Includes fire ring, BBQ pedestal, table, block wall, table relocation, concrete, concrete pad, etc. as applicable. Includes disposal.14EA$ - 0$ - 0
4Water Play Area Demolition: Includes block walls, fences, stairs, tables, concrete, etc. Includes disposal.1EA$ - 0$ - 0
530 x 40 Concrete Pad1EA$ - 0$ - 0
Site Work - Division 03 Concrete
6Valley Gutter: Includes preparation, base, forming, finish10SF$ - 0$ - 0
7Concrete Retaining Wall: Includes concrete, reinforcing, footings, forming, preparation, stone cap and facing90LF$ - 0$ - 0
8Water Play Area Concrete Stairs1EA$ - 0$ - 0
Site Work - Division 13 Special Construction
9Fire Rings17EA$ - 0$ - 0
10Tent Pad17EA$ - 0$ - 0
11Table - 6' Long12EA$ - 0$ - 0
12Table - 8' Long5EA$ - 0$ - 0
13Shade Structure3EA$ - 0$ - 0
14Remove and replace bridge wood components1LS$ - 0$ - 0
Site Work - Division 31 Earthwork
15Campsite general clearing and grading: Includes minor clearing and grubbing, minor grading18,000SY$ - 0$ - 0
16Improved walk surface: Includes trails and walking areas at water play area3,500SY$ - 0$ - 0
17Site 16 Rock Retaining Wall, 18"-24" diameter rock, 10' high45LF$ - 0$ - 0
18Rock Retaining Wall, 24"-36" diameter rock, 4' high80LF$ - 0$ - 0
19Stream Diversion: Includes planning and execution of stream diversion/dewatering for construction of water play area1LS$ - 0$ - 0
20Water Play Area Excavation and Backfill: Includes excavation, backfill, compaction, and finish grading. Includes excavation to bedrock for retaining wall.1LS$ - 0$ - 0
Site Work - Division 32 Exterior Improvements
21Revegetation: Includes preparation, fertilizer, seeding1,000SY$ - 0$ - 0
Base Bid Total$ - 0
Additive - Schedule A
Non-GAOAQUANTITIESCOST
# UnitsUnit of MeasureUnitTotal
ITEMDESCRIPTION
Site Work - Division 13 Special Construction
1Shade Structure Erection3EA$ - 0$ -
2Tables - 8' Tables3EA$ - 0$ -
Schedule A Total$ -
Additive - Schedule B
Non-GAOAQUANTITIESCOST
# UnitsUnit of MeasureUnitTotal
ITEMDESCRIPTION
Site Work - Division 13 Special Construction
1Pavilion Structure Erection1EA$ - 0$ -
2Reinforced Concrete Pads 6" thick 30' x 47'1EA$ - 0$ -
3Tables - 8' Tables8EA$ - 0$ -
Schedule B Total$ -
Additive - Schedule C
GAOAQUANTITIESCOST
# UnitsUnit of MeasureUnitTotal
ITEMDESCRIPTION
Site Work- Division 02 Existing Conditions - Demolition
1Cut and Remove Dead Limbs - Cottonwood1LS$ - 0$ -
Schedule C Total$ -