Bid Schedule
| BID SCHEDULE |
| 140L5724R0001 Calf Creek Recreation Area Redevelopment |
| Base Bid | | | | | |
| GAOA | | QUANTITIES | | COST | |
| | # Units | Unit of Measure | Unit | Total |
| ITEM | DESCRIPTION | | | | |
| Mobilization - Division 00 Mobilization | | | | | |
| 1 | Mobilization | 1 | LS | $ - 0 | $ - 0 |
| Site Work- Division 02 Existing Conditions - Demolition | | | | | |
| 2 | Shade Shelter with Footing | 3 | EA | $ - 0 | $ - 0 |
| 3 | Typical Campsite Demolition: Includes fire ring, BBQ pedestal, table, block wall, table relocation, concrete, concrete pad, etc. as applicable. Includes disposal. | 14 | EA | $ - 0 | $ - 0 |
| 4 | Water Play Area Demolition: Includes block walls, fences, stairs, tables, concrete, etc. Includes disposal. | 1 | EA | $ - 0 | $ - 0 |
| 5 | 30 x 40 Concrete Pad | 1 | EA | $ - 0 | $ - 0 |
| Site Work - Division 03 Concrete | | | | | |
| 6 | Valley Gutter: Includes preparation, base, forming, finish | 10 | SF | $ - 0 | $ - 0 |
| 7 | Concrete Retaining Wall: Includes concrete, reinforcing, footings, forming, preparation, stone cap and facing | 90 | LF | $ - 0 | $ - 0 |
| 8 | Water Play Area Concrete Stairs | 1 | EA | $ - 0 | $ - 0 |
| Site Work - Division 13 Special Construction | | | | | |
| 9 | Fire Rings | 17 | EA | $ - 0 | $ - 0 |
| 10 | Tent Pad | 17 | EA | $ - 0 | $ - 0 |
| 11 | Table - 6' Long | 12 | EA | $ - 0 | $ - 0 |
| 12 | Table - 8' Long | 8 | EA | $ - 0 | $ - 0 |
| 13 | Shade Structure | 3 | EA | $ - 0 | $ - 0 |
| 14 | Remove and replace bridge wood components | 1 | LS | $ - 0 | $ - 0 |
| Site Work - Division 31 Earthwork | | | | | |
| 15 | Campsite general clearing and grading: Includes minor clearing and grubbing, minor grading | 18,000 | SY | $ - 0 | $ - 0 |
| 16 | Improved walk surface: Includes trails and walking areas at water play area | 3,500 | SY | $ - 0 | $ - 0 |
| 17 | Site 16 Rock Retaining Wall, 18"-24" diameter rock, 10' high | 45 | LF | $ - 0 | $ - 0 |
| 18 | Rock Retaining Wall, 24"-36" diameter rock, 4' high | 80 | LF | $ - 0 | $ - 0 |
| 19 | Stream Diversion: Includes planning and execution of stream diversion/dewatering for construction of water play area | 1 | LS | $ - 0 | $ - 0 |
| 20 | Water Play Area Excavation and Backfill: Includes excavation, backfill, compaction, and finish grading. Includes excavation to bedrock for retaining wall. | 1 | LS | $ - 0 | $ - 0 |
| Site Work - Division 32 Exterior Improvements | | | | | |
| 21 | Revegetation: Includes preparation, fertilizer, seeding | 1,000 | SY | $ - 0 | $ - 0 |
| Base Bid Total | | | | | $ - 0 |
| Additive - Schedule A | | | | | |
| Non-GAOA | | QUANTITIES | | COST | |
| | # Units | Unit of Measure | Unit | Total |
| ITEM | DESCRIPTION | | | | |
| Site Work - Division 13 Special Construction | | | | | |
| 1 | Shade Structure Erection | 3 | EA | $ - 0 | $ - |
| 2 | Tables - 6' Tables | 6 | EA | $ - 0 | $ - |
| Schedule A Total | | | | | $ - |
| Additive - Schedule B | | | | | |
| Non-GAOA | | QUANTITIES | | COST | |
| | # Units | Unit of Measure | Unit | Total |
| ITEM | DESCRIPTION | | | | |
| Site Work - Division 13 Special Construction | | | | | |
| 1 | Pavilion Structure Erection | 1 | EA | $ - 0 | $ - |
| 2 | Reinforced Concrete Pads 6" thick 30' x 47' | 1 | EA | $ - 0 | $ - |
| 3 | Tables - 8' Tables | 10 | EA | $ - 0 | $ - |
| Schedule B Total | | | | | $ - |