This is a Post Site Visit Questions and Answers document for a federal landscape services contract solicitation issued by the Bureau of Land Management (BLM), Fire and Aviation division in Boise, Idaho. The solicitation number is 140L3726Q0077 for NIFC Landscape Service, with a performance start date of July 1, 2026.
The contract is a new requirement with an estimated order of magnitude of $200,000 to $400,000 for the base period plus all three option years. Services include landscape maintenance across multiple terrain types including turf grass, tall fescue, xeriscape/rock/bark beds, and native bedding areas, with specific maintenance requirements detailed in Part 19 of the solicitation's attachment. Irrigation system maintenance is required, including inspection, adjustment, and repair of sprinkler heads and nozzles (limited to 20 replacements per year), with more complex repairs such as valve, wiring, and controller work to be performed by NIFC personnel or as optional services outside the contract scope. Leaf raking, vacuuming, and hauling are required with frequency specified in Item 8 of the Schedule of Items. Line Item 15 regarding dead plant and shrub replacement has been removed and will be available as an optional service separate from the contract. Chemical applications must comply with FAR clauses 52.223-2 and 52.223-23 regarding biobased and sustainable products. Contractors may utilize subcontractor-owned equipment with formal teaming or lease agreements. No post-award submittals are required, but contractors must maintain required documentation for periodic COR review and submit contractor personnel lists prior to the start date. Site access does not require HSPD-12 clearance for landscaping personnel, though access is restricted to building 415-MNT. Relevant amendment sketches provide detailed area boundaries and irrigation system information.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
BUREAU OF LAND MANAGEMENT
Fire and Aviation 3833 S Development Ave
Boise, Idaho 83705-5354
POST SITE VISIT Q&A June 11, 2026
NIFC Landscape Service Solicitation Number 140L3726Q0077
CONTRACTOR QUESTIONS GOVERNMENT RESPONSE
1. Is there a current incumbent performing this service? May we have the contract number or the total contract award amount?
1. There is no incumbent performing these services.
2. Regarding the irrigation- is there a sketch, irrigation implementation drawing etc reflecting the zones, controls, head etc
2. See Amendment Sketch 1 NIFC Irrigation System. Also refer to Part 20 Irrigation System Summary, page 9, of the Attachment_1 for this solicitation.
3. Is there a requirement for leaf raking, vacuuming, hauling off etc? If yes, what is the frequency?
3. See Part 19. Schedule of Items, page 8, of the Attachment_1 for this solicitation. Item 8 identifies frequency.
4. The total award amount and contract period of performance for the most recent award (including option years, if exercised).
4. This is a new requirement. Services performed by NIFC personnel previously.
5. What is the maximum procurement or budget allocated for this opportunity?
5. The estimated order of magnitude for base plus all three options years is $200K - $400K.
6. Equipment Ownership (Evaluation Factor 1):
The solicitation requires the submission of a list of vehicles and equipment "owned by the Contractor". If proposing a prime/subcontractor teaming arrangement, will the Government accept equipment owned by our primary subcontractor, provided there is a formal teaming or lease agreement committing the equipment to this contract?
6. Yes, this is acceptable.
7. CLIN 15 Pricing Structure: Line Item 15 for removing and replacing dead plants and shrubs states "(Not to exceed $1200)". Should offerors price this specific CLIN at exactly $1,200 in the Price Schedule for evaluation purposes, or will this be managed as a time-and-materials/pass-through cost upon execution?
7. This line item has been removed from the solicitation. Replacement of dead plants may be completed as an optional service separate from the contract.
8. Item 15 references removal and replacement of dead plants and shrubs not to exceed $1,200 annually. Does the $1,200 limitation include both labor and materials, or materials only? If there are replacements needed that exceed $1,200, is that
8. This line item has been removed from the solicitation. Replacement of dead plants may be completed as an optional service separate from the contract.
billable separately or do we stop replacing plants after $1200?
9. Native Area Quantities: Section 4 of the SOW specifies that "Native Areas shall not be sprayed, but will be weeded, pruned, trimmed". Could the Government provide the approximate square footage or acreage of these Native Areas to ensure accurate labor estimates for manual weed removal?
9. See Amendment Sketch 2 NIFC Turf and Bedding and Amendment Sketch 3 NIFC Native Bedding Areas.
10. Post-Award Submittals: Are there any post-award submittals that we should be aware of? If so, could you please provide the relevant information?
10. No submittals. Please review required documentation to be maintained by the contractor for periodic review by the COR.
11. LANDSCAPE AREA ACREAGE: Can the Government provide approximate square footage or acreage for each landscape type — turf grass, tall fescue, xeriscape/rock/bark beds, and the Native Area?
11. See Amendment Sketch 2 NIFC Turf and Bedding and Amendment Sketch 3 NIFC Native Bedding Areas.
12. IRRIGATION SYSTEM CONDITIONS: Are there any known deficiencies, broken heads, or pre-existing repair needs within the five irrigation systems? Additionally, can the Government confirm the approximate total number of operational sprinkler heads across all zones to support accurate startup and winterization pricing?
12. No known deficiencies, system is operating and being monitored by current NIFC WFS personnel. Refer to Part 20 Irrigation System Summary, pg 9, of the Attachment_1 for this solicitation.
13. ITEM 15 CAP CLARIFICATION: Does the $1,200 cap for dead plant removal and replacement (Item
15) apply per performance year or to the base period in total? Does it include the cost of nursery stock, or is replacement plant material billed separately?
13. This line item has been removed from the solicitation. Replacement of dead plants may be completed as an optional service separate from the contract.
14. CHEMICAL APPLICATION REQUIREMENTS:
Does the Government maintain an approved product list, or does the contractor have discretion to select EPA-registered products? Are there any site-specific restrictions on herbicide or pesticide use — particularly near the on-site irrigation well?
14. Reference contract clause 52.223-2 Reporting of Biobased Products Under Service and Construction Contracts and 52.223-23 Sustainable Products and Services, where a list of products by category can be found.
15. CAMPUS ACCESS & ONBOARDING TIMELINE:
What is the Government's expected lead time to process contractor personnel for campus access badges? Will there be a structured onboarding window prior to the July 1, 2026 performance start date to ensure no delay in mobilization?
15. Homeland Security Presidential Directive 12 will not apply to landscaping personnel.
Refer to Part 11 Access. Contractor personnel will not be allowed in any buildings, except 415-MNT.
List of contractor personnel expected to work at NIFC shall be submitted to COR prior to start date.
No delay in mobilization expected.
16. Where exactly are all the "Tall Fescue area" for mowing, trimming, edging for 7 months? Line item 6 on the "Schedule of items" sheet.
16. See Amendment Sketch 3 NIFC Native Bedding Areas and Tall Fescue Areas.
17. Are the roadside/shoulder areas along the East perimeter, part of weekly maintenance. Will the current maintenance company and/or BLM maintenance staff, have the planter beds cleared of weeds and grasses?
17. The roadside/shoulder along the east side, outside the perimeter fence is not part of this scope. No, planter beds will not be cleared of weeds and grass.
18. The natural swale area, West side of property,
- how many times will this need to be cut down per contract year?
18. See Amendment Sketch 3 NIFC Native Bedding Areas and Tall Fescue Area.
19. The Performance Work Statement requires inspection and adjustment of the irrigation system. What about irrigation repairs such as replacing sprinkler heads, nozzles, valves, wiring, controllers, etc. Please clarify if irrigation repair labor and parts are included in the contract price or if repairs time and parts are reimbursable separately.
19. Irrigation repairs will be limited to sprinkler head and nozzle replacement, up to 20 per year.
Valves, wiring, controller, piping, shall be repaired by NIFC personnel, or as an optional service outside this solicitation requirement.
20. Can you provide information regarding the current condition of the irrigation system, including any known deficiencies, non-functioning zones, controllers, valves, or sprinkler heads?
20. Irrigation system is functioning and adjusted for this watering season. No known deficiencies.
21. Can you provide the approximate square footage or acreage of:
- Turf grass areas
- Tall fescue areas
- Rock/bark beds
- Native landscape areas
- Xeriscape areas
21. See Amendment Sketches. Broken up into areas of turf and bedding.
22. Are there any upcoming plans for significant landscape renovations, irrigation upgrades, or changes in maintenance scope anticipated during the contract period?
22. Future building is shown on Amendment Sketch 1 for reference, no others landscape renovations are planned.
23. Please clarify the expected maintenance level within the Native Area, including frequency of weeding, pruning, and irrigation monitoring?
23. See Part 19. Schedule of Items, page 8, of the Attachment_1 for this solicitation. Item 8 identifies frequency.
24. Please confirm that snow removal, ice management, storm cleanup, and emergency response services are not included in the scope of this contract unless separately authorized.
24. Confirmed, items listed are not included in the scope of this contract.
25. Are there any seasonal restrictions, security events, fire activity, training exercises, or other operational considerations that may limit site access during the contract period?
25. No restrictions expected. COR will coordinate as needed.