This is a Statement of Work for the Bureau of Land Management (BLM) Miles City Field Office's procurement of pipeline materials. The contract requires the delivery of 81,000 feet of 2-inch HDPE black pipe (DR 11, 200 psi) manufactured from PE4710 resin polyethylene in accordance with ASTM D 2837 and D3350 standards. The pipe must be furnished in 4,500-foot coils on spools and shall be uniform in color, opaqueness, and density, free from visible cracks, holes, foreign inclusions, or defects.
The contractor is responsible for all costs associated with purchasing and shipping the materials to the BLM Admin Site located at 111 Garryowen Road, Miles City, Montana 59301, with no modifications permitted for increased shipping costs. Delivery must occur during business hours (Monday to Friday, 8:00 AM to 4:30 PM), and the contractor must contact the Contracting Officer's Representative (Lucas Riley, Civil Engineer; lgriley@blm.gov; 406-233-2836) at least 48 hours prior to delivery. BLM will provide forklift and operator for unloading. The contractor must submit manufacturer specifications and written certification of conformance to contract requirements at the time of inspection. Submittals must be emailed to the Contract Specialist and should allow at least seven working days for review. Each submittal must include the submitter's contact information, project name, contract number, and detailed product specifications including manufacturer name, trade name, model number, and locations of use.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3626Q0019_Amd_0001.pdf | ||
| 140L3626Q0019_Specifications_MCFO_Pipeline_Material.pdf | ||
| Sol_140L3626Q0019.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2026 MCFO PIPELINE MATERIAL
BUREAU OF LAND MANAGEMENT
111 Garryowen Road
Miles City, Montana 59301
February 2026
Table of Contents 2026 MCFO Pipeline Material
Table of Contents
Specification Page Number
Statement of Work ......................................................................................................... 1-3
Delivery Location Map
Statement of Work 2026 MCFO Pipeline Material 2
Statement of Work
This contract is to fulfill the Bureau of Land Management (BLM) Miles City Field Office’s (MCFO) need for pipeline materials. The Bid Schedule will provide quantities and lengths of pipeline material as required by this contract. The contractor price is to include any cost associated with shipping. No modification for increased costs will be permitted for shipping. Contractor awarded this contract is responsible for the purchase and delivery of the materials to the BLM Admin Site located at:
111 Garryowen Road Miles City, MT 59301.
At the BLM site, BLM will provide forklift and operator for off-loading materials. Delivery shall be during business hours Monday to Friday 8AM-4:30PM. 48 hours prior to delivering any materials contact the Contracting Officers Representative (COR) to ensure forklift and operator can off-load.
COR Contact Information
Lucas Riley Civil Engineer
Email: lgriley@blm.gov Office: (406) 233-2836 Cell: (406) 853-0328
If COR cannot be reached contact one of the following.
Tanner Cahill Office: (406) 233-2818
Kirk Anderson Office: (406) 233-3140
Matt Lewin Office: (406) 233-2834
Merel Blankenship Office: (406) 233-2878
Submittals & Certifications
A. Scope: Submittals include manufacturers' specifications, and handling & storage details.
Requirements: Refer to items for submittals required. Allow at least 7 working days for review. Submittals shall be to Contract
Identification of Submittals: Completely identify each submittal by showing at least the following information:
Name and address of submitter, plus name and telephone number of the individual to contact for further information.
Name of project as it appears in these specifications.
Contract number, drawing number, and specification section number to which the submittal applies.
Whether this is an original submittal or resubmittal.
Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
Certification: The Contractor shall furnish, at the time of inspection, written certification from manufacturer that the Contractor-furnished materials conform to the requirements of this contract.
Required Material Specifications
Item 1. 2” HDPE Black Pipe (DR 11) (Quantity 81,000 Feet)
HDPE, 2-inch, IPS, DR 11, 200 psi, high density pipe manufactured from PE4710 resin polyethylene manufactured in accordance with ASTM
, D 2837, and D3350. The pipe shall be as uniform as commercially practicable in color, opaqueness, density, and other specified physical properties. It shall be free from visible cracks, holes, foreign inclusions, or other defects. Pipe shall be furnished in 4,500 ft coils on a spool.
Manufacturer specifications submittal and certification required.
End Section