About this file
This is Amendment 0001 to Solicitation 140L3625R0013 for the Devil's Elbow Chipseal project issued by the Bureau of Land Management (BLM) Montana State Office in Billings, Montana. The amendment extends the offer submission deadline to August 18, 2025, at 1:00 PM MDT and provides site visit attendance records from a July 22, 2025 prebid conference along with questions and answers from interested offerors. The contract period of performance runs from August 28, 2025, to October 30, 2026, and the contracting officer is Jorge Alvarez.
The project involves chip seal work at Devil's Elbow Recreation Site with key requirements including epoxy traffic paint with glass beads meeting specification 718.11 and 718.14 standards, asphalt patching with prime coat application, crack sealing with prior weed spraying by BLM, and traffic control managed by the contractor. Two companies attended the site visit: Montana Materials and Hardrives Asphalt. Notable project details include BLM allowing chip materials to be piled at Camp Site #35, BLM removing a 4'x4' concrete pad at Clarks Bay Recreation Site before patching, and the contractor being permitted to remove concrete parking stops for patching work with prior coordination with the contracting officer and contracting officer's representative.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3625R0013_Amd_0003.pdf | ||
| Updated_-_Attachment_10_-_Price_Schedule_0003.xlsx | XLSX spreadsheet | |
| Updated_-_Attachment_2_-_Drawings_0003.pdf | ||
| Sol_140L3625R0013_Amd_0002.pdf | ||
| Attachment_4_-_Reference_List.pdf | ||
| Sol_140L3625R0013.pdf | ||
| Attachment_10_-_Price_Schedule.xlsx | XLSX spreadsheet | |
| Attachment_2_-_Drawings.pdf | ||
| Attachment_5_-_Past_Performance_Questionnaire.pdf | ||
| Attachment_8_-_SF25_Performance_Bond.pdf | ||
| Attachment_3_-_Wage_Determination.pdf | ||
| Attachment_6_-_Financial_Responsibility_Required_Documentation.pdf | ||
| Attachment_9_-_SF25A_Payment_Bond.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| Attachment_7_-_SF_24_Bid_Bond.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3625R0013 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT STATE OFC(MT935)
LMA
BILLINGS MT 59101
5001 SOUTHGATE DR.
BLM MT-STATE OFC(MT935)
08/06/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/10/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
See below for changes incorporated by this amendment.
Period of Performance: 08/28/2025 to 10/30/2026
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jorge Alvarez
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
PROJECT DESCRIPTION: Devil's Elbow Chipseal Solicitation No. 140L3625R0013
Description of Changes - This amendment incorporates the following:
1. Extends the solicitation to 18 August 2025, 1:00 PM MDT.
2. For informational purposes only, the Government is providing the Site Visit Attendance Records from the organized site visit that the Government held on 22 July 2025, at 1:30 pm Mountain Time.
3. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.
Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).
Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.
PROJECT DESCRIPTION: Devil's Elbow Chipseal Solicitation No. 140L3625R0013
UNITED STATES
DEPARTMENT OF THE INTERIOR
BUREAU OF LAND MANAGEMENT
SITE INSPECTION TOUR / PREBID CONFERENCE RECORD
1. Solicitation Number: 140L3625R0013 4. Meeting Place: Devil’s Elbow Recreation Site
2. Title: Devil’s Elbow Complex Chip Seal 5. Conducted by: Zach Morgan, BLM COR. Also attended by3. Date and Time: 07/22/2025 @ 1:30 pm Kadin Weinrich, BLM Park Ranger.
Attended by:
Name and Firm Address (include zip code) Phone (include area code)Kevan Viste - Montana Materials 2209 Airport Rd, Helena, MT 59601. Email:
Ken.frost@Helenasg.com
(406) 438-1463
Jody Teske - Hardrives Asphalt 2908 64th St W. Billings, MT 59106. Email:
jody@hdasphalt.com
(406) 672-8820
8. Questions asked and responses given:
Q: What type of paint needs to be use?
A: Epoxy Traffic Paint with Glass Beads. As long as the paint meets the specification requirements for 718.11 Epoxy Markings, and718.14 Glass Beads utilized in the Traffic Paint conforming to AASHTO M 247 it will be acceptable. Epoxy Traffic Paint is preferred based on the 1-year warranty period.
Q: Will the BLM allow chips for the chip seal to be piled on site? If so, where at?
A: Yes. The BLM will allow chips for the chip seal to be piled on site. Camp Site #35 will be the designated location for chips to bepiled on site.
Q: Will the BLM take any of the excess chips after they are picked up?
A: Yes. The BLM will take the excess chips after they are picked up. A designated location will be staked by the Government for the excess chips to be left at.
Q: Is a prime coat required to be applied during preparation for asphalt patching?
A: Yes.
Q: Will the BLM spray weeds in the asphalt cracks before the contractor cleans up the cracks before crack sealing?A: Yes. The BLM will spray weeds, trim brush and grass before crack sealing will be performed.
Q: What are the dates for period of performance?
A: The dates for period of performance are, 08/28/2025 - 10/30/2026.
Q: Do nonvisible cracks that have been previously crack sealed, covered with past chip seal, need destructive testing to make visible,and be extra routed out before crack sealing?
A: No. Visible cracks will need to be cleaned out and extra routing may be required for some cracks before crack sealing is completed.Q: Will the BLM remove the 4’x4’ concrete pad at Clarks Bay Recreation Site before the asphalt area will be patched.A: Yes. The BLM will remove the 4’x4’ concrete pad at Clarks Bay Recreation Site before the asphalt area will be prepped andpatched.
Q: What about Traffic Control?
A: Traffic Control will be the responsibility of the contractor.
Q: Can the awarded contractor remove a few concrete parking stops this fall to patch asphalt and replace the concrete parking stops after performing the crack sealing, chip seal and other work next summer?
A: Yes. Please contact the BLM CO and BLM COR to inform them before any work is performed.