About this file

This document is an amendment to Solicitation No. 140L3624R0017 for the Fort Meade Water Systems project issued by the Department of the Interior Bureau of Land Management. The amendment provides responses to questions submitted by interested offerors, addressing topics such as tracer wire and warning tape requirements, curb box keys, threaded fittings, curbstop valves and boxes, bore sleeve sizing, air relief valve sizing, and pressure reducing valve installation. The solicitation has a period of performance from 09/02/2024 to 12/31/2024. Offerors must acknowledge receipt of this amendment prior to the specified due date. The key objectives of the project are to upgrade the water systems at Fort Meade.

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140L3624R0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

LMA

BILLINGS MT 59101

5001 SOUTHGATE DR.

BLM MT STATE OFC(MT935)

LMA

BILLINGS MT 59101

5001 SOUTHGATE DR.

BLM MT-STATE OFC(MT935)

07/02/20240001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/02/2024

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Page 2 of 4 for changes incorporated by this amendment.

Period of Performance: 09/02/2024 to 12/31/2024

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Jorge Alvarez

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

PROJECT DESCRIPTION: Fort Meade Water Systems Solicitation No. 140L3624R0017

Description of Changes - This amendment incorporates the following information:

1. The Government is providing the Questions received from interested offerors and the associated Answers provided by the Government.

Acknowledgement - See Block 11 above regarding how to acknowledge this amendment. The Government must receive the acknowledgement at the place designated for receipt of offers (See Block 8 of the Standard Form 1442).

Third Party – If you have given a copy of the solicitation to someone else, please forward this amendment accordingly.

Questions and Answers Offerors shall submit questions by 26 July 2024, at 1:00 pm, Mountain Time. Questions submitted after this date and time may not be answered. Offerors for this RFQ, including subcontractors and teammates, shall consolidate questions related to this solicitation in a Request for Information (RFI) formatted Word document. Any RFI is to be emailed as an editable attachment to Jorge Alvarez (jalvarez@blm.gov) with the subject line: RFI – 140L3624R0017 Fort Meade Water Systems. Only written RFI’s will be considered and responded to. BLM responses to the RFI will be posted as an amendment to the solicitation on https://sam.gov.

Solicitation Number: 140L3624R0017 Project Title: Fort Meade Water Systems

1. Are both tracer wire and detectable warning tape required? Typically, if a job has tracer wire being used and warning tape is also desired, the specs will call out non-detectable warning tape to save on cost.

a. Both the tracer wire and detectable warning tape will be required. Detectable warning tape provides another layer of utility sensing to minimize disturbance of the water lines.

2. How many curb box keys are needed, 5 or even more? The spec section that says to provide some to the government seems a little unclear.

a. 5 keys shall be provided to the government for the curb boxes. All curb boxes should have the same key configuration.

3. Is there any issue with having brass or stainless-steel male threads be inserted into PVC female threads?

a. Contractor is responsible for installing transition fittings that are satisfactory with no cracked connections. System will be evaluated after 1 year of operation before the end of the warranty.

4. Should the ball curbs utilize iron curb boxes like a 5615 from Ay McDonald for example, or should they just use PVC risers? If PVC risers is what is desired, what size should be used?

1-1/2” and 2” ball curbs have 2” MPS threads for attachment. The specs only seem to mention what to use when using 1” ball curbs.

a. For the stockwater system, provide curbstop valve and curbstop riser and cap meeting the requirements of specification 331700- Part 2.1 H and I.

b. For the potable rec line system, provide a valve that matches the nominal size of the pipe (2"). Curbstop boxes shall be extension type Minneapolis curb box. A 5615 Ay McDonald box would meet the requirements.

5. What is the minimum sleeve size needed for the 1-1/2” IPS DR11 carrier pipe to go through for the bore crossing? Would 3” work for the size, and can the thickness be DR11 or must it be DR9?

a. 3" bore sleeve is adequate. Boring spec requires sleeve to be same pressure rating or greater as the waterline. Pressure rating for Spur A going through the Bore sleeve is

DR11.

6. What size air relief valves are needed? Looks like the Bermad Model A30 has either a ¾” inlet or a 1” inlet. All of them are shown to be on the 1-1/2” stock water lines except for 1 being on the 2” potable line. Any difference in size needed between the two?

a. 3/4" or 1" air relief valves would be adequate for the stockwater waterline. Use the same air relief valves for the entire system.

https://sam.gov/

7. The bid form calls out 11 air relief valves, but the plans appear to only show 10 from what I counted.

a. Air valves are paid for by EA as installed. The quantity on the SOI should be used for bidding purposes.

8. For the frost-proof hydrants, is the Woodford Y34 or Y1 what you are looking for? They seem very close to what is listed in the specs. Except the Y34 has a ¾” inlet, and a 1” galvanized riser. The Y1 has a 1” inlet, but a 1-1/4” galvanized riser. Both would have a ¾” hose nozzle. But the max operating pressure is 125psi.

a. Either of these hydrants would be adequate.

9. Many of the hydrants are called out as having a Watts U5 pressure reducing valve installed above grade. What size PRV is needed, and how would this assembly work exactly? Would the PRV’s be expected to thread onto the ¾” outlets of the hydrants? Ay McDonald does make a ¾” female garden hose thread x ¾” MIP outlet. Is this what you have in mind for the installation of the PRV’s? Typically, I see these Watts PRV’s be installed in meter pits.

I’ve never seen one installed with a yard hydrant above grade so I want to make sure I understand this correctly, because to me it seems like the water pressure would need to be reduced before making the connection to a yard hydrant.

a. Size of the pressure reducing valve is not specified. Contractor shall propose an adequate PRV meeting the minimum requirements of the specifications. Size shall be as needed for efficient / clean installation. The order of installation is hydrant - PRV - float valve- see Attachment 10 – Question 9 Photos for photos of previous examples of this installation.