Sol_140L3522Q0001_Amd_0001.pdf
PDF 90 KB Posted
- Attached to
- MOAB SKYWAY DEMOLITION Federal contract opportunity
- Solicitation number
- 140L3522Q0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Moab_Skyway_demo_plans--final.pdf | ||
| B03_DOL_Wage_Determinations.pdf | ||
| Sol_140L3522Q0001.pdf | ||
| Moab_Skyway_demolition_SOW--Final.docx | DOCX document | |
| B08_Solicitation_140L3522Q0001.pdf | ||
| Moab_Skyway_demolition_specs--attachment.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140L3522Q0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
LUY
MOAB UT 84532
82 EAST DOGWOOD
BLM UT CANYON COUNTRY DIST-UTY01
11/19/20210001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/19/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment incorporates the following questions and answers:
1.Can you please provide us with the Asbestos Survey.
a. We are unaware of any asbestos survey, nor am I sure who would have conducted one if one had been conducted. The buildings are likely too new to have used asbestos in the first place.
2.Do you have as-built showing the depth of the concrete footers? If so please provide.
a. No as-builts are available.
3.If drawings of the concrete is not available, how deep are the footers? If unknown how deep are we to predict for bidding purpose?
a. Anticipate footers to a depth of up to 42" (30" frost depth + 12").
4.What kind of fill do you require?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jackie Stevens
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140L3522Q0001/0001
a. Clean graded fill, 1"-minus for max aggregate size. No particular gradation required beyond that.
5.Is there a Storm water permit required? Is a plan required?
a. Project area approximately 1 acre. Storm water permit and SWPP are expected.
6.Will there be water available to use during demolition? Or do we have to provide it ourselves?
a. Contractor will have to provide own water, as well as own power and toilet facilities.
7.Are the septic tanks cleared or do we need to pump them out?
a. Pumping is not anticipated, though dry solid waste may still be inside the vaults.
8.Is there any saw cutting required?
a. Saw cutting will be required for the asphalt to provide a clean edge.
Submit quotes via email to Jackie Stevens at jstevens@blm.gov with "140L3522Q0001 Moab Skyway
Demolition" in the subject line.
Legacy Doc #: BLM
Amendment 1 incorporates Q&As.
Period of Performance: 01/03/2022 to 02/08/2022