This document is a set of Contractor Questions and Government Responses for the Bayhorse Fuel Break Project (Solicitation Number 140L2625Q0057). The document addresses five key clarifications related to the project's tree thinning requirements, including map compatibility, tree cutting specifications, and work standards. Specific details include: pdf georeferenced maps will be provided for Avenza Maps; all Douglas-fir and Lodgepole pine trees less than 20 inches in diameter within the first 50ft of road-adjacent units must be cut; wood pulling and cutting requirements are limited to specific designated areas with green polygon markings; the government will flag all unit boundaries and provide maps; and tree boles must be bucked to 4-foot lengths. Each response includes a reference to the specific section of the solicitation document where the details can be found.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question Government response Reference
1 Do you have maps compatible with Avenza Maps ?
Yes, pdf georeferenced maps shall be provided by the government and are able to be used in Avenza Maps.
Refer to section F-3 Government Furnished Property and Services, 3.1.2.
Do we need to cut all trees within the first 50ft of the buffer along the side of the road? All Douglas-fir and Lodgepole pine trees less then 20 inches diameter at breast height (DBH) shall be cut within the first 50ft of the units near the road.
Refer to section F-4 Contractor Furnished Items and Services, 4.2.1.1.1.
3 Are we supposed to cut and pull all trees down to the road within 250ft of the main road?
The performance work standard has been edited to only require the pulling of cut wood to the road within areas designated by the BLM. These areas have been identified as having a low enough % slope and distance to the road in order to make the work safe and feasible. The areas are identified as green polygons in two georefernced pdf maps that have been provided.
Additionally, not all material in this area needs to be brought to the road. Any material greater then six inches diameter at breast height (DBH) within the designated areas shall be cut to four foot lengths and brough to the road.
Refer to section F-4 Contractor Furnished Items and Services,
4.2.1.6. See updated maps.
Language redarding unit boundary falgging has been changed. The government will flag all unit boundaries and provide map.
Refer to section F-1, 1.6 General Information, 1.6.6.
Bucking length specifications were absent from section 4.2 Service requirements, but have been updated to require tree boles be bucked to 4 ft lengths.
Refer to section F-4 Contractor Furnished Items and Services, 4.2.1.7.