012200_BLM_-_Unit_Prices_and_Schedule_of_Values_concrete_demo_0001.pdf
PDF 92 KB Posted
- Attached to
- GAOA - ABA at Big Sand and Grey's Landing
- Solicitation number
- 140L2624Q0047
About this file
This document is a Unit Prices and Schedule of Values for a federal contract opportunity related to the Architectural Barriers Act (ABA) accessibility improvements at the Big Sand Bay and Greys Landing recreation sites.
The key details include six bid items: 1) Mobilization and Construction Management, 2) Demolition of existing concrete pads and sidewalks, 3) Earthwork for site preparation and grading, 4) Riprap installation for erosion control, 5) Concrete work for new pads and sidewalks including accessibility signage, and 6) Pavement markings. All bid items are lump sum payments, except for the unit price items which may be adjusted based on actual quantities. The contract is being procured by the Department of the Interior's Bureau of Land Management Idaho Region. No specific award date or response deadline is provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APRIL 2024 UNIT PRICES AND SCHEDULE OF VALUES
GAOA ABA AT BIG SAND BAY AND GREYS LANDING. 012200-1
SECTION 012200 - UNIT PRICES AND SCHEDULE OF VALUES
PART 1 - GENERAL
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for unit prices and requirements to prepare schedule of values.
1.2 DEFINITIONS
A. Unit price is a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased.
1.3 PROCEDURES
A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit.
B. Government reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Government expense, by an independent surveyor acceptable to Contractor.
C. List of Unit Prices: A list of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price.
1.4 SCHEDULE OF VALUES (Not Required)
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION
3.1 LUMP SUM PAYMENT ITEMS
A. Payment items for the work of this Contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below.
B. Lump Sum items are inclusive of all materials, labor, parts, assembly, and installation in order to produce a functional product. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum payment item, shall be included in the listed lump sum item most closely associated with the work involved.
GAOA ABA AT BIG SAND BAY AND GREYS LANDING. 012200-2
C. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
3.2 UNIT PRICE PAYMENT ITEMS
A. Payment items for the work of this Contract for which unit price payments will be made are listed in the BIDDING SCHEDULE and described below.
B. Unit price items are inclusive of all materials, labor, parts, assembly, and installation in order to produce a unit of the product. All costs for items of work, which are not specifically mentioned to be included in a particular unit price payment item, shall be included in the listed unit price item most closely associated with the work involved.
C. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
D. Quantities regarding unit prices shall be assumed to follow the quantities listed in the bid schedule. If the Contractor suspects a change in the unit quantities, measurement can be made to adjust the final quantity of an item. If the quantity of an item cannot be measured at final condition the contractor shall produce construction documentation collected during construction to demonstrate the quantity.
3.3 SUMMARY OF BID ITEMS
A. The intent of the following paragraphs is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends, and another begins. If no bid item exists for a portion of the work, include the costs in a related bid item.
B. BID ITEM 1 - MOBILIZATION AND CONSTRUCTION MANAGEMENT: This item includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; bonds, work layout; other work and operations which must be performed, or costs incurred prior to beginning work on the various items on the project site. Construction management includes ongoing tasks such as environmental controls, temporary facilities and controls, temporary traffic control, and field office operations. Item also includes preparation and installation of erosion control measures and features. It will be paid for as a lump sum.
C. BID ITEM 2 – DEMOLITION: This item includes all work and labor necessary for removal of existing concrete pads and sidewalks at Big Sand Bay and Grays Landing rec sites. Item will be paid for as a lump sum.
GAOA ABA AT BIG SAND BAY AND GREYS LANDING. 012200-3
D. BID ITEM 3 – EARTHWORK: This item includes labor and equipment to clear the areas identified on the plans for construction, excavation of soil materials to subgrade elevations, placement and compaction of subbase materials, and placement and compaction of base course materials in accordance with the plans. Item includes transport locally for disposal of unsuitable material and stockpiling material as directed by the Government. Includes backfill, site reclaiming, and seeding of all disturbed areas. Item will be paid for as a lump sum.
E. BID ITEM 4 – RIPRAP: Item includes furnishing and placing riprap for erosion control at back and sides of Big Sand Bay toilet as shown on plans. Geotextile under riprap is also included.
Item includes all materials, equipment, and labor necessary for installation. Installation shall be as directed by the Government and shown on the plans. Item will be paid for as a lump sum.
F. BID ITEM 5 – CONCRETE: This item includes labor, materials, and equipment to install concrete pad and sidewalks in accordance with the plans. This item also includes two (2) ABA Accessible Parking Signs installed in concrete pad. Item will be paid for as a lump sum.
G. BID ITEM 6 – PAVEMENT MARKINGS: This item includes providing all labor, materials, and equipment necessary to install pavement markings per the plans. Item will be paid for as a lump sum.
END OF SECTION 012200
| PART 1 - GENERAL |
| 1.1 SUMMARY |
| A. This Section includes administrative and procedural requirements for unit prices and requirements to prepare schedule of values. |
| 1.2 DEFINITIONS |
| A. Unit price is a price per unit of measurement for materials or services added to or deducted from the Contract Sum by appropriate modification, if estimated quantities of Work required by the Contract Documents are increased or decreased. |
| 1.3 PROCEDURES |
| A. Unit prices include all necessary material, plus cost for delivery, installation, insurance, applicable taxes, overhead, and profit. |
| B. Government reserves the right to reject Contractor's measurement of work-in-place that involves use of established unit prices and to have this work measured, at Government expense, by an independent surveyor acceptable to Contractor. |
| C. List of Unit Prices: A list of unit prices is included in Part 3. Specification Sections referenced in the schedule contain requirements for materials described under each unit price. |
1.4 SCHEDULE OF VALUES (Not Required)
| PART 2 - PRODUCTS (Not Used) |
| PART 3 - EXECUTION |
| 3.1 LUMP SUM PAYMENT ITEMS |
| A. Payment items for the work of this Contract for which contract lump sum payments will be made are listed in the BIDDING SCHEDULE and described below. |
| B. Lump Sum items are inclusive of all materials, labor, parts, assembly, and installation in order to produce a functional product. All costs for items of work, which are not specifically mentioned to be included in a particular lump sum payment item... |
| C. The lump sum price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safet... |
| 3.2 UNIT PRICE PAYMENT ITEMS |
| A. Payment items for the work of this Contract for which unit price payments will be made are listed in the BIDDING SCHEDULE and described below. |
| B. Unit price items are inclusive of all materials, labor, parts, assembly, and installation in order to produce a unit of the product. All costs for items of work, which are not specifically mentioned to be included in a particular unit price payment... |
| C. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety re... |
| D. Quantities regarding unit prices shall be assumed to follow the quantities listed in the bid schedule. If the Contractor suspects a change in the unit quantities, measurement can be made to adjust the final quantity of an item. If the quantity of a... |
| 3.3 SUMMARY OF BID ITEMS |
| A. The intent of the following paragraphs is to explain, in general, what is and what is not included in a bid item, and the limits or cut-off points where one bid item ends, and another begins. If no bid item exists for a portion of the work, include... |
| B. BID ITEM 1 - MOBILIZATION AND CONSTRUCTION MANAGEMENT: This item includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, and incidentals to the project site; bonds, work layout; oth... |
| C. BID ITEM 2 – DEMOLITION: This item includes all work and labor necessary for removal of existing concrete pads and sidewalks at Big Sand Bay and Grays Landing rec sites. Item will be paid for as a lump sum. |
| D. BID ITEM 3 – EARTHWORK: This item includes labor and equipment to clear the areas identified on the plans for construction, excavation of soil materials to subgrade elevations, placement and compaction of subbase materials, and placement and compac... |
| E. BID ITEM 4 – RIPRAP: Item includes furnishing and placing riprap for erosion control at back and sides of Big Sand Bay toilet as shown on plans. Geotextile under riprap is also included. Item includes all materials, equipment, and labor necessary f... |
| F. BID ITEM 5 – CONCRETE: This item includes labor, materials, and equipment to install concrete pad and sidewalks in accordance with the plans. This item also includes two (2) ABA Accessible Parking Signs installed in concrete pad. Item will be paid ... |
| G. BID ITEM 6 – PAVEMENT MARKINGS: This item includes providing all labor, materials, and equipment necessary to install pavement markings per the plans. Item will be paid for as a lump sum. |