This document is Amendment 2 for the Canyons of the Ancients National Monument Lakeview Intern Housing Renovation project, issued by the Bureau of Land Management. The amendment includes additions to contract documents such as an Asbestos Containing Materials (ACM) survey, updated electrical drawing sheets, and a clarification on power supply. Key clarifications involve asbestos removal, with an estimated 46 square feet to be addressed at specific locations including egress windows and kitchen areas, to be performed by a CDPHE-certified asbestos abatement contractor.
The amendment provides detailed guidance on electrical and fire suppression system requirements. The electrical service will involve coordination with Empire Electric, with power supply transitioning from overhead to underground within 50 feet of the building. The contractor is responsible for all aspects of the fire suppression design, with fire suppression pipes required to be located within the building's conditioned space. The project addresses several technical specifications, including sprinkler system installation, utility upgrades, and asbestos remediation, with the Bureau of Land Management providing specific instructions and expectations for the renovation work.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior Bureau of Land Management
Canyons of the Ancients National Monument
Lakeview Intern Housing Renovation
Amendment 2 https://sam.gov/ Notice ID: 140L1725R0003 Title: Z--BLM-CO TRFO CANM LAKEVIEW INTERN HOUSING
Additions to the contract documents:
Document Description L3600 Anasazi Heritage House ACM Report.pdf Asbestos Containing Materials (ACM) survey E-001 - Updated 09-05-25.pdf Updated drawing sheet E-101 - Updated 09-05-25.pdf Updated drawing sheet CANM Intern House Renovation - Clarification Power Supply.pdf
Clarification to the power supply
Modifications Replace drawing sheet E-001 & E-101 with the drawings listed above.
Questions and Answers:
Q. A fire sprinkler system is to be installed on the project per the solicitation documents. In order to get proper coverage, sprinkler distribution piping should be run in the attic space. If the attic space is not to be conditioned, how is the sprinkler system proposed to be protected from freezing temperatures?
A. Fire suppression pipes shall be located within the building’s conditioned space.
Q. The utility provider, Empire Electric, is mentioned in the Electrical drawings as well as proposed scope involving the electric utility. Is the General Contractor to carry costs associated with service upgrades? If so, please provide an invoice/estimate from the electric utility.
A. The BLM will directly pay the utility provider, Empire Electric, for work that Empire Electric must perform. All other work shall be the responsibility of the Contractor.
Q: Boulder placement, road maintenance and wire fencing are scope items mentioned in the Solicitation scope of work summary, however these scope items are not identified in the Solicitation Documents.
Please advise if these scope items are to be included in the bid, and if so provide clarification on proposed scope.
A: The BLM does not understand the question. Can you please clarify where boulder placement, road maintenance and wire fencing are identified? Boulder placement, road maintenance and wire fencing are not part of this project.
https://sam.gov/
Canyons of the Ancients National Monument Lakeview Intern Housing Renovation
Amendment 2
Clarification – Asbestos Removal The contractor is only required to remove asbestos as required to complete the work. Remaining asbestos shall be encapsulated in accordance with Section 028210 ASBESTOS REMEDIATION.
Asbestos Containing Materials (ACM) shall be removed by a Colorado Department of Public Health and Environment (CDPHE) certified asbestos abatement contractor. Asbestos removal and disposal shall be in accordance with all state and federal laws and regulations.
Asbestos Containing Materials (ACM) locations and estimated ACM removal amounts:
Location Estimated ACM Removal Amount (SF) Installation of Egress Windows 30 Installation of fire sprinkler supply lines 1 Removal of kitchen cabinets, countertops, and kitchen soffit 15
Total Estimated Amount, Square Feet (SF) 46 Actual removal amounts shall be identified and verified by the Contractor.
Clarification – Electrical Service The Contractor shall coordinate all work with the utility provider, Empire Electric, as required to increase power supply to the building. Empire Electric power supply shall be overhead until within ~50’ of the building. The power shall be underground from Empire Electric’s power pole to the building. The power connection to Empire Electric’s supply shall be as shown in the drawing “CANM Intern House Renovation
- Clarification Power Supply.pdf”.
Clarification – Fire Suppression System The contractor is responsible for all aspects of the fire suppression design.