A06_Specifications.pdf
PDF 7 MB Posted
- Attached to
- BLM-CO WRFO KIOSK INSTALLATION Federal contract opportunity
- Solicitation number
- 140L1725Q0022
About this file
This document is a comprehensive set of technical specifications for the White River Field Office (WRFO) Kiosk Installation project. The project involves removing 9 existing wood frame kiosks and installing 14 new 2-panel steel kiosks across Rio Blanco, Moffat, and Garfield counties in Colorado. The work is to be completed within 60 days of the notice to proceed, with installation occurring Monday through Friday, excluding federal holidays.
The specifications provide detailed technical requirements for kiosk installation, including concrete mixing standards, equipment operator qualifications, mounting procedures, and warranty conditions. The kiosks will be furnished by Rockart Signs and Markers, model #03-450-L-BS, featuring a shed roof and 48-inch wide panels. The installation process involves precise hole digging, post placement, roof panel mounting, and concrete setting, with specific instructions for ensuring proper alignment, leveling, and securing of the kiosk structures. Additional requirements include cleaning equipment before site arrival, maintaining work limits, and following specific mounting and hardware installation guidelines.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B12_Vendor_Questions_0003.pdf | ||
| Sol_140L1725Q0022_Amd_0003.pdf | ||
| Sol_140L1725Q0022_Amd_0002.pdf | ||
| A06_Specifications_-_Updated_0002.pdf | ||
| Sol_140L1725Q0022_Amd_0001.pdf | ||
| B03_Wage_Determination.pdf | ||
| Sol_140L1725Q0022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL INFORMATION AND REQUIREMENTS
White River Kiosk Installations 02/2025
01009 - 1
SECTION 01009
PART 1: GENERAL
1.1 SUMMARY
A. Description of Work: Furnishing labor and equipment for the removal of 9 existing wood frame kiosks and the installation of 14 new 2-panel steel kiosks.
B. Location: Work under this Contract is in the White River field office, covering Rio Blanco, Moffat, and Garfield counties. The work locations are shown on the drawings.
C. Schedule: Work shall be completed within 60 days of the notice to proceed. Work shall occur Monday – Friday, excluding Federal
Holidays.
1.2 REFERENCES
A. Referenced Specifications/Standards with Abbreviations and/or
Acronyms: Wherever the following acronyms are used in these specifications or on the drawings, they are to be construed the same as the respective expressions represented. Copies of the referenced specifications/standards referred to herein may be procured by the Contractor, from the following:
ACI American Concrete Institute
P.O. Box 19150
Detroit, MI 48219
ACI 305R-91 Hot Weather Concreting
ACI 306R-88 Cold Weather Concreting
ASTM American Society for Testing and Materials
100 Barr Harbor Dr.
West Conshohocken PA 19428-2959
ASTM C 143 Methods for Slump of Hydraulic Cement
Concrete
1.3 DEFINITIONS
A. Approvals: Approval of the submittals is an indication that the
Contractor's submittals have been reviewed and that there are no
01009 - 2 objections, except as noted. Approval of deviations shall apply only to those deviations or omissions from the requirements of the drawings and specifications brought to the Contracting
Officer's attention in writing. After approval of an item, submit a substitute for approval when the approved item cannot be purchased or delivered in time to avoid delay in completion of the project.
1.4 SUBMITTALS
A. Submittals Required: Submittals shall include photos of equipment and vehicles cleaned and free of soils and contaminants.
B. Requirements: Refer to specifications for submittals required.
Allow at least 5 working days for review. Submittals shall be sent in electronic PDF format to ibergemann@blm.gov or given to the COR/PI at the prework conference.
C. Identification of Submittals: Completely identify each submittal by showing at least the following information:
1. Name and address of submitter, plus name and telephone number of the individual to contact for further information.
2. Name of project as it appears in these specifications.
3. Contract number, drawing number, and specification section number to which the submittal applies.
4. Whether this is an original submittal or resubmittal.
5. Each item shall clearly note the manufacturer's name and address, trade name, product, lot, style, color, catalog designation or model number, and locations of use.
1.5 QUALITY ASSURANCE
A. Codes and Standards: The work shall comply with codes and standards applicable to each type of work and as listed in the individual sections of these specifications. This Contract incorporates materials, applications, and tests by reference, with the same force and effect as when they were given in full text.
B. Conflict: Where a conflict occurs between reference documents and project specifications, the project specifications shall govern.
C. Equipment Operators Qualifications: Personnel operating heavy equipment for the construction of the work as described within the specifications and as shown on the drawings shall have a minimum of one year of experience operating the specific type of heavy equipment to be used. Heavy equipment includes but is not limited to, motor grader, dozer, front end loader, excavator, backhoe, skid steer.
01009 - 3
1.6 DELIVERY, STORAGE, AND HANDLING
A. Delivery: Protect products incorporated into the work from damage while in transit to the site.
B. Storage: Provide temporary storage facilities for products.
Storage shall comply with the manufacturer's instructions. The storage area shall permit access for inspection and handling.
C. Handling: Load and unload products protecting them from damage.
1.7 PROJECT/SITE CONDITIONS
A. Access to the Work: As per Federal Acquisitions Regulations
Clause 52.236-10. Access to work locations within the sites shall be limited to existing roads only.
B. Environmental Considerations: As per Federal Acquisitions
Regulations Clause 52.236-9 and 52.236-10.
C. Cleaning of Equipment: All construction equipment, including heavy equipment and vehicles, shall be cleaned and free of all soils and contaminants prior to delivery onsite. Equipment and vehicles that arrive to the work area and have visible soils or contaminants on the equipment or vehicles, shall be removed from the work area and cleaned offsite prior to being allowed back onsite. Submit photos of cleaned equipment and vehicles prior to mobilization of equipment to the work area. Photos shall be taken immediately prior to delivery and/or offloading at work site.
D. Work Limits and Control Points: Will be established by the
Contracting Officer. Parking of equipment and storage of equipment and materials shall be limited to existing disturbed areas along the road and parking areas as approved by the Contracting Officer.
1.8 SEQUENCING AND SCHEDULING
A. Work Schedule: The schedule shall be submitted within 5 calendar days after signing the Notice to Proceed and as per Federal
Acquisitions Regulations Clause 52.236-15. When requested, submit an updated schedule. At a minimum, the schedule will state the estimated timeframes for the work to be performed.
PART 2: PRODUCTS
(There are no applicable requirements.) PART 3: EXECUTION
3.1 PROJECT MEETINGS
01009 - 4
A. Pre-Work Conference:
1. Will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the Contract.
2. The Contractor, subcontractors and the persons responsible for coordination of the work shall be present at the meeting.
3. Be prepared to summarize and explain procedures planned for the project [and present the submittals requested in the specifications].
B. Progress Meetings:
1. To be held at the project site, or as determined by the
Contracting Officer.
2. May be called by either the Contracting Officer or the
Contractor. Request shall state who should attend and include an agenda.
C. Final Inspection:
1. To be held at the project site, or as determined by the
Contracting Officer.
2. Notify the Contracting Officer in writing at least 5 working days before the completion date so the Government can schedule final inspection.
3. The superintendent shall be present during this inspection.
3.2 CONSTRUCTION STAKEOUT
A. Work Layout: The Government will supply a list with coordinates of all kiosk locations along with a map with all kiosk locations.
Exact kiosk installation locations at each site shall coordinated and established between contractor and government prior to installation of kiosk.
3.3 WARRANTY
A. Requirements: Materials and equipment furnished under this
Contract shall be covered by the most favorable commercial warranties given to customers for such materials or equipment.
The rights or remedies provided herein are in addition to and do not limit rights afforded to the Government by other clauses of this Contract. With respect to warranties, expressed or implied, from manufacturers or suppliers for materials or equipment furnished under the Contract the Contractor shall:
1. Obtain warranties that would be given in normal commercial practices.
2. Require warranties to be executed, in writing, for the benefit
01009 - 5 of the Government.
3. Submit warranties to the Contracting Officer prior to the final inspection.
PART 4: MEASUREMENT AND PAYMENT
4.1 METHOD OF MEASUREMENT
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
END OF SECTION
MINOR CONCRETE
03306 - 1
SECTION 03306
A. Section Includes: Furnishing and placing bag concrete mix concrete.
1.2 QUALITY ASSURANCE
A. Causes for Rejection: Concrete may be rejected for, but not limited to, the following reasons:
1. Freezing within the first 3 days of placement
2. Excessive or inadequate slump
3. Segregation of aggregate or over-vibration resulting in excessive water in the surface of the concrete
4. Honeycomb over 25% of the surface
5. Voids larger than 2 inches across
6. Misalignment of concrete
2.1 MATERIALS
A. Bag Concrete Mix: 4000 psi minimum strength bag concrete mix.
B. Water: Potable water shall be used for mixing concrete. Contractor to furnish water required for mixing concrete.
PART 3: EXECUTION
3.1 PREPARATION
A. Subbase Preparation: Subbase and earth walls to be in contact with concrete shall be undisturbed or compacted.
3.2 CONCRETE PLACEMENT
A. Mixing of Concrete: Mix and place sack concrete mix according to the manufacturer’s instructions.
B. Concrete Placement Under Adverse Conditions: During hot weather, refer to ACI 305R. During cold weather, refer to ACI 306R. Materials required for protection shall be on the jobsite before concrete work is started. Do not place concrete on a frozen subgrade or against surfaces having deposits of frost, snow, or ice.
03306 - 2
3.3 CONCRETE FINISHING
A. Concrete Surface Finishes: The top footings shall be given a float finish after screeding.
3.4 PROTECTION
A. Requirements: During the curing period, protect concrete from load stresses, shock loads, or vibration. Protect surfaces from damage by equipment, other materials, running water, or rain.
A. Units: The work described in this section will not be measured for payment.
4.2 BASIS OF PAYMENT
A. Payment: No direct payment for the work described under this section will be made. Consideration for this item shall be included in the bid price for other items of the Contract.
MISCELLANEOUS SPECIALITIES
White River Kiosk Installations
02/2025
10990-1
SECTION 10990 MISCELLANEOUS SPECIALITIES
A. Section Includes: Furnishing labor and materials required for the removal of 9 existing single panel timber frame kiosks and the installation of 14 new 2 panel steel kiosks.
2.1 MATERIALS
A. Government Furnished Kiosks: 2-panel straight kiosk with shed roof, 6”x6” as described in Section 01019, 2.1, A., Model#03-450-L-BS as manufactured by Rockart Signs and Markers, www.rockartsigns.com.
B. Government Furnished Bag Concrete Mix:
PART 3: Execution
3.1 PREPARATION
A. Existing Kiosks Removal: Remove 9 existing kiosks timber kiosks. Remove posts and backfill holes, cutting of posts at or below ground level shall not be permitted. Minimize disturbance to surrounding areas by keeping equipment on pre-disturbed surfaces where possible dispose of removed kiosks at the Field Office: 220 E. Market St, Meeker, CO 81640, United States. Coordinates below show the location of the new installations.
Kiosk Name Latitude Longitude Existing Kiosk
Bull Canyon WSA 40.3028444 -108.9455361 Yes/replacement
Moosehead Mtn 40.31643362 -108.9322489 No
Bull Canyon South 40.25873056 -108.9980889 No
North Rangely 40.06805833 -108.8068389 No Big Trujillo 40.07522 -108.887667 Yes/replacement Dragon Rd. 40.0321 -108.81181 Yes/replacement
Willow Creek 39.78504 -108.61656 Yes/replacement Oil Springs Mountain 39.7077138889 -108.875313889 Yes/replacement Proposed Pike Ridge 39.64961111 -108.7044607 No
Duck Creek 39.9851 -108.4667 No Pinto Mesa 40.0099 -108.45715 Yes/replacement Crossroads 40.05698 -108.29951 Yes/replacement
Indian Valley 40.22131 -108.21663 Yes/replacement Smith's Gulch 40.04708771 -108.1422076 Yes/replacement http://www.rockartsigns.com/
10990-2
10990-3
3.2 INSTALLATION
A. Kiosk: Install the new Government Furnished kiosks as instructed by the kiosk manufacturer. Install at the locations as shown on the drawings and at the approximate coordinates as shown above. Exact kiosk installation locations at each site shall coordinated and established between contractor and government prior to installation of kiosk.
B. Concrete Footings: Mix bag concrete as per Section 03306 and as instructed by the manufacturer.
A. Units: The work described will be measured and paid for by each individual kiosks installed and accepted. The removal of the existing kiosks shall not be paid for separately but shall be included in the bid price for other items of the Contract.
10990-4
4.2 BASIS OF PAYMENT:
A. Payment: Prices and payment will be full compensation for the work described in this section. Consideration for items of work not listed shall be included in the bid price of other items. Payment will be made under:
Pay Item Pay Unit
10990(1) Kiosk. ......................................... EA
Aluminum Assembly Fixture Return Merchandise Authorization (RMA) Form
Ship-To:
ROCKART, Inc.
3006 North Maple Mesa, AZ 85215-1127
(480) 854-3400
Invoice #:
3006 North Maple � Mesa, Arizona 85215 � (480) 854-3400
This Aluminum Assembly Fixture is property of ROCKART, Inc., and should be promptly returned to ROCKART after the kiosk is installed. To receive proper credit/refund of the security deposit, please follow the instructions below:
We are unable to issue a refund without an INVOICE number to reference!
Please write the Invoice# on BOTH RED LINES, at the bottom of this page!
After the kiosk is installed, and you’re ready to return the Assembly Fixture, simply:
• Cut out the RMA Form (bottom left corner) and place it inside the shipping box.
• Cut out the SHIP-TO Label (bottom right) and tape it to the outside of the package, if needed.
RMA Form:
To receive a refund of the security deposit, you MUST WRITE the original INVOICE # on the line below!
Cut out this form & place it inside the shipping box.
Invoice #:
Cut along this line
• Only undamaged , re-usable Assembly Fixtures may be returned for a refund.
• If possible, re-use the original shipping boxes/containers to package the Assembly Fixture.
• DO NOT return the hardware kit (i.e., nuts, bolts, washers) included with the Fixture.
• Choice of shipping carrier and all shipping costs are the customer’s responsibility (we highly recommend selecting a provider that provides a way to track shipments).
• ROCKART is not responsible for items that are lost, damaged or mishandled by the shipping provider.
03-450-L
03-450-R
03-450-L-BS
03-450-R-BS
03-450-L-WOS
03-450-R-WOS
ASSISTING WITH or PERFORMING AN INSTALLATION IS DONE COMPLETELY AT YOUR OWN RISK!!
ROCKART, Inc. assumes absolutely NO LIABILITY for any type of damage sustained resulting from following the instructions published within this Installation guide. This includes damage to personal property, any personal injury (whether immediate or delayed-onset), loss of life or limb (whether by accident or consequential).
WE STRONGLY RECOMMEND THAT YOU ALWAYS WEAR PROTECTION WHEN AND WHERE APPROPRIATE!
NEVER TAKE RISKS WITH YOUR HEALTH & WELL-BEING!
CALL FOR A BLUE STAKE BEFORE DIGGING!
ROCKART® Message Center Kiosk Installation Guide
03-450 Series
Before you begin, it is recommended that you review this entire installation guide.
Ro ck ar t, In c.
v .2
A ug
PG 1
Message Center Kiosk Parts List
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Optional Products Recommended by Rockart
ITEM # DESCRIPTION
03-524
3-piece Aluminum Assembly Fixture (for 48”w sign panels)— used during installation to maintain post spacing without risking damage to your sign panels. The purchase price (less shipping) will be credited back when you return the fixture, in good condition, to Rockart.
RECOMMENDED Qty: 2
08-1015 Touch Up Paint, Rust Texture, 12 oz. aerosol can
08-637 7/32 Screwdriver, drilled for 3/8-16
Part Drawings are not to scale.
Parts List
Parts List
QTY PART# DESCRIPTION
2 03-474 6x6 x 120 Long END POST for Roofed Kiosks, 2 mounting tabs (48h sign panels)
1 03-475 or 03-476
6x6 x 120 Long CENTER Post for LEFT / RIGHT ANGLED Shed Roof Kiosks, 4 mounting tabs (48h sign panels)
1 03-455 58.5 x 42 Shed Roof Panel SubAssembly
1 03-451 or 03-452
62 x 39.5 LEFT / RIGHT Angled Shed Roof Panel SubAssembly
4 03-449 Shed Roof Mounting Plate
2 03-911 Shed Roof Mounting Hardware Kit (for attaching Roof Mounting Plates to Kiosk Posts & Shed Roof Panel to Mounting Plate)
1 08-627 7/32 x 3" Long Hex L-Key (Drilled for 3/8 Button Head Screws, Pin-in-Hex) RED
1 08-1005 .14 Oz Packet Anti-Seize Compound
These items are included only with SHINGLED models
1 03-458 or 03-454
61.5 x 39 Shed Roof Shingle Overlay (LEFT / RIGHT Angled)
1 03-456 58 x 41.5 Shed Roof Shingle Overlay
2 03-915 Shingle Overlay Hardware Kit (for attaching a shingle overlay to Shed roof panel)
03-474 Qty. = 2
#10-16 x .5” Long Hex Washer Head Qty.=20
03-915 Qty. = 2
03-918 12@3/8-16 x .75 hex head bolts, 12 nuts and 12 washers
03-524 3 pieces, includes
1 hardware kit #03-918
3/8-16 x .75” Button Head Qty.=16
3/8-16 x 2” Hex Head Bolts Qty.=2
03-911 Qty. =2
03-449 Qty. = 4
08-1005 Qty. = 1
08-627 Qty. = 1 (Red)
03-475 or 03-476 Qty. = 1
Qty. = 1
OR
OR
Qty. = 1
Qty. = 1
Qty. = 1
1) Auger and 12” bit
2) Post hole digging tools
3) Wheelbarrow
4) Cement Mix for 3 holes @
(5 cubic feet/hole)
5) Water
6) Hoe
7) (3) 36” long 2x6 wood planks
8) (3-5) 12’ long 2x4 wood planks
9) (2-4) Concrete spikes
10) 1 Bottle jack
11) Framer’s level
12) (2) saw horses
13) 3/8-16 tap
14) Tap wrench for a 3/8-16 tap
15) Power Drill
16) (2) 9/16 box or end wrenches
17) Metal Tape Measure
18) (2) 6’ Step Ladders
19) 5/16” Hex Driver
Before You Start . . .
Please check to be sure that you have received (from ROCKART) all items listed below.
Customer will also need to provide items listed under Additional Tools & Supplies (page bottom) to complete this installation successfully.
Additional Tools & Supplies Necessary for Installation
Only Shingled Models ck ar t, In c.
v .2
A ug
PG 2
Message Center Kiosk Front View Drawing
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Aluminum Assembly Fixtures
(temporary)
Front View Drawing
Slotted Sign Panel Mounting Tabs
Slotted Sign Panel Mounting Tabs
Guide for Shed Roof Mounting Plate Installation
Important Notes
• Install the Assembly Fixture on the backside of the Slotted Mounting Tabs (See below)
• The angled flange (at top & bottom edges) should point towards the BACK of the kiosk (See below)
• The Assembly Fixture’s edge should be FLUSH against the vertical post (See below)
• Insert a washer between the Slotted Mounting Tab and a nut (to avoid scratching paint) (See below)
Post #3 Post #1
Post #2 Post #2 Post #1
Post #3
Fr on t S id e of
K io sk
For Left-Angled Models (03-450-L) For Right-Angled Models (03-450-R)
*Notice each numbered post, as they are different depending on the model being installed.
Instructions are written with this in mind.
ck ar t, In c.
v .2
A ug
PG 33006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Message Center Kiosk Hole Digging Guide
30” deep
18” Dia.
For: ANY 2-PANEL, ANGLED KIOSK USING 48”-Wide ROCKART® SIGN PANELS
55.5" 53.25"
" D ia
POST #1 POST #2
POST #3
18.25"
108.75"
Start Here
108.75"
55.5"53.25" 18" Dia.
POST #2 POST #1
POST #3
18.25"
Start Here
Front of Right-Angled Kiosk (03-450-r)
Front of Left-Angled Kiosk (03-450-l)
1 Stand in front of where the kiosk is to be installed as if you were viewing the front side. Using the model-appropriate diagram below, ANCHOR the start of the tape measure at the point labeled “START HERE”. EXTEND the measuring tape directly to the RIGHT approx. 10 feet and lock it.
2 At 108.75”, make a mark on the ground. This will be the center location of POST #1.
3 Without moving the tape, mark the ground at 53.25” for the center location of POST #2.
4 Keeping the tip anchored, retract the measuring tape to ap-prox. 2 ft, then rotate it 90° clockwise (perpendicular to the previous marks) and mark the ground at 18.25” for the center location of POST #3.
5 You should now have 3 spots marked on the ground where the center of each post will be located.
6 Excavate 9” of dirt around each marked spot, so there will be three 18” diameter x 30” deep holes in the ground as shown.
1 Stand in front of where the kiosk is to be installed as if you were viewing the front side. Using the model-appropriate diagram below, ANCHOR the start of the tape measure at the point labeled “START HERE”. EXTEND the measuring tape directly to the LEFT approx. 10 feet and lock it.
2 At 108.75”, make a mark on the ground. This will be the center location of POST #1.
3 Without moving the tape, mark the ground at 53.25” for the center location of POST #2.
4 Keeping the tip anchored, retract the measuring tape to ap-prox. 2 ft, then rotate it 90° counter-clockwise (perpendic-ular to the previous marks) and mark the ground at 18.25” for the center location of POST #3.
5 You should now have 3 spots marked on the ground where the center of each post will be located.
6 Excavate 9” of dirt around each marked spot, so there will be three 18” diameter x 30” deep holes in the ground as shown.
Hole Digging Guide
Follow the model-appropriate instructions & diagram below:
Each red dot represents where the CENTER of each vertical post should be located.
The green circle centered around each red dot represents an 18” diameter area that should be excavated to a depth of 30” inches.
Installing the kiosk at a location where the ground is UNEVEN, may require adjusting hole depths.
CALL FOR A BLUE STAKE BEFORE DIGGING!
For Left-Angled Models (03-450-L) For Right-Angled Models (03-450-R) ck ar t, In c.
v .2
A ug
PG 4
Message Center Kiosk Installation Guide
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
What You Will Need to KNOW... These Instructions Apply to Model(s):
Be sure you have reviewed these related sections:
• Kiosk Parts, Tools & Supplies List , PG 1
• Front View Drawing , PG 2
• Hole Digging Guide, PG 3
• This Installation Guide
• Sign Panel Installation Guide (if your kiosk was purchased with sign panels)
LEFT-ANGLED
#03-450-L (Green Shingled Roof)
#03-450-L-BS
(Brown Shingled Roof)
#03-450-L-WOS
(Non Shingled Roof)
RIGHT-ANGLED
#03-450-R (Green Shingled Roof)
#03-450-R-BS
(Brown Shingled Roof)
#03-450-R-WOS
(Non Shingled Roof)
PLEASE READ FIRST
ROCKART STRONGLY RECOMMENDS the following for the best results:
• We recommend a crew of 3 to 4 persons that are physically strong enough to perform the installation.
• Assembly time takes approximately 2 to 3 hours.
• Ensure the items listed at the bottom of page 1 will be available.
• Hardware and small tools may ship to you separately via UPS at the same time your Kiosk(s) ships.
• If directions seem ambiguous please remember this guide was written with the assumption that the reader is facing the front side of the Kiosk (unless otherwise noted).
• A special hex wrench with a hole in the end is supplied to assemble the roof panels. One is supplied with every Kiosk and is painted RED.
• You will need two (2), #03-524 3-piece Assembly Fixtures. NOTE: DO NOT attempt to use actual Kiosk
Sign Panels in place of an Assembly Fixture! These temporary fixtures help maintain proper spacing between posts during installation. By using them, you need not worry about damaging your actual sign panels, if something goes wrong.
• IMPORTANT: Keep the boxes used to ship the Aluminum Assembly Fixtures. They can be used to return-ship the undamaged fixture(s) back to ROCKART, so we may refund the deposit fee (less shipping costs).
Stage I - Assemble & Install the Kiosk Getting Started
1 REVIEW Pages 1 & 2. Get familiarized with the kiosk part names & numbers.
2 DIG HOLES – Using the hole digging guide on Page 3.
3 ENSURE all holes are only 30” deep for proper viewing height of kiosk sign panels!
Part 1 : Preparation & Pre-Assembly
1 ASSEMBLE each of the 3-piece Assembly Fixtures (#03-524) using eight (8) 3/8-16 x .75” hex head bolts, nuts and washers from hardware kit #03-918. Note: Do not apply Anti-Seize on the Assem-bly Fixture’s bolts! DON’T LOSE the unused hardware, they will be needed later. SET the assembled fixtures aside for now.
2 CLEAN all 3/8” threaded holes with a 3/8-16 tap and tap wrench to REMOVE any corrosion, debris and paint from the threads of all roof panels and posts before beginning assembly. (See Fig 1.1)
Installation Guide ck ar t, In c.
v .2
A ug
PG 5
Message Center Kiosk Installation Guide
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
3 If your kiosk does NOT include shingle overlays (model #’s ending in ‘-WOS’), skip ahead to Part 2A;
otherwise, FOLLOW the steps below to PRE-ASSEMBLE the Shed Roof panels:
4 For each Shed Roof panel subassembly (#03-455 & 03-451 / 03-452) : PLACE it across 2 sawhorses with the top side up. LAY a matching shingle overlay (#03-456 & 03-458 / 03-454 respectively) on top of the roof panel.
5 ENSURE the “steps” in the overlay stair-step in a downward direction and also that the short step of the shingle overlay is at the bottom. (See Fig 1.2 for details) ALIGN the corner holes then SECURE the shingle to the roof panel using #10-16 x .5 Hex Washer Head screws from #03-915. Once the 4 corners are secured, DRIVE screws into the remaining holes, using the pre-drilled holes in the shingle overlay as a guide.
6 REPEAT steps 4 & 5 for the remaining shed roof panel. SET the assembled roof panels aside for now.
Part 2A : Main Section Assembly
1 PLACE each of the top (capped) ends of Post #1 (03-474) & Post #2 (03-475 or 03-476) across a saw horse. POSITION so that the non angled sign mounting tabs are pointing at each other. The un-capped (bottom) ends of these 2 posts should be positioned over their respective holes (See Fig 2).
PLACE a 2x6, 36” long wood plank in each hole (stand it on end, so it is perpendicular to the kiosk post) See Fig 3. Later on, this will serve as a kind of backstop/guide for the posts (as they are lowered into the holes) and will help minimize surrounding dirt from falling into the holes.
2 USE (4) 3/8-16 bolts, nuts and washers (from #03-918) to ATTACH an Assembly Fixture (#03-524) to the BACKSIDE of the 4 slotted tabs between Post #1 & #2 (See Fig 4). READ Important Notes on Page 2, and Fig 5 for more details. The 1” angled flange should point towards the BACK of the kiosk. TIGHTEN these 4 bolts after VERIFYING that the sides of the Assembly Fixture are flush
Fig 1.1
Fig 2 Fig 3
Fig 1.2
Install shingle overlays so they“stair-step” downward
The shortest “step” should be at bottom
To determine the TOP of a Shed Roof panel, look along one side for these 4 holes.
TOP
Fig 4 ck ar t, In c.
v .2
A ug
PG 6
Message Center Kiosk Installation Guide
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com against both posts. Remember to use a flat washer between a mounting tab and a nut or bolt, to avoid scratching the paint.
3 ATTACH (3) Shed roof mounting plates #03-449 to Posts 1 & 2, by following the Guide for Shed Roof Mounting Plate Installation on Page 2. Post #1 requires one shed roof mounting plate (the side op-posite the 2 slotted tabs); Post #2 requires two plates (at the top of the post, above the slotted tabs). ENSURE that the support arm of the roof mounting plate (with the U-shaped notch) is on the FRONT SIDE of the Kiosk.
USE (4) of the 3/8-16 x .75” long, pin-in, stainless steel button head bolts from #03-911 to ATTACH each plate (see Fig 6 ). Apply a dab of Anti-Seize to each bolt first. DON’T over-tighten bolts!
4 Helped by others who are physically capable, LIFT the top ends of posts 1 & 2, ALLOWING the bottom ends to SLIDE down into their respective holes. (Similar to Fig 7.1 & 7.2)
5 Once the posts are sitting in the holes and are positioned (as close as possible) to the center of their respective holes, SUPPORT the structure front and back using 2x4 x 12’ long wood planks and con-crete spikes as necessary.
TIP: If available, PLACING several large rocks into the holes, (in the open space around each post) may help further stabilize the structure.
Part 2B : Angled Section Assembly
1 As before, PLACE the capped (top) end of Post #3 (#03-474) across a saw horse, with the bottom of the post suspended over it’s respective hole. PLACE a 36” long 2x6 wooden plank into hole #3 (stand it on end, so it is perpendicular to the steel post) See Fig 3.
2 ATTACH the final Shed Roof Mounting Plate #03-449 to the top (capped end) of this post on the side opposite from the slotted mounting tabs using (4) 3/8-16 x .75” long, pin-in, stainless steel button head bolts from #03-911. ENSURE that the extended arm of the mounting plate is on the FRONT
Fig 5
Vertical Post 1” Angled Flange of Assembly Fixture
Washer
Hex Head Bolt
Hex Head Nut
Slotted Sign Panel Mounting Tab
Front Side of Kiosk
Fig 7.1 Fig 7.2 Fig 7.3
Fig 6 ck ar t, In c.
v .2
A ug
PG 7
Message Center Kiosk Installation Guide
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
SIDE of the Kiosk. Again, REFER to the guide on page 2 for placement. Apply a dab of Anti-Seize to each bolt first. DON’T over-tighten bolts!
3 USE (2) 3/8-16 bolts, nuts and washers from #03-918 to ATTACH the one side of the Assembly Fixture to the two remaining mounting tabs on Post #2.
FOLLOW the Important Notes from page 2: ATTACH the fixture to the back side of the slotted mounting tabs. ENSURE that the angled flange is pointing toward the BACK of the kiosk. ENSURE the vertical edges of the Assembly Fixture are flush against side of post #2 (Similar to Fig 7.3 )
4 RAISE the top end of Post #3. ALLOW the bottom end to SLIDE down into the hole, and then SECURE Post #3 to the Assembly Fixture with remaining (2) 3/8-16 bolts, nuts and washers from #03-918.
(Similar to Fig 7.4 ) FOLLOW same guidelines from last step to ENSURE proper installation of the fixture.
Part 3 : Install Roof Panels
1 PLACE Shed Roof panel #03-455 across two sawhorses, UPSIDE DOWN so that the holes along the inner-walls of the recessed area are visible.
2 FOLLOW Fig 8.1 showing placement to INSTALL a 3/8-16 x 2” hex head “swivel” bolt from #03-911 into each hole indicated by a blue arrow. These two “swivel” bolts are installed temporarily while attaching the roof panel, so Don’t tighten these bolts!
3 RAISE the Shed Roof panel #03-455 up into place on the non-angled side. GUIDE each “swivel” bolt into the U-shaped notch in the Roof mounting plate on each side. LET the roof hang (Similar to Fig 9 ).
4 Carefully ROTATE the Shed Roof panel until the holes next to the “swivel bolts” are aligned with holes in the Roof panel. SECURE it using six (6) 3/8-16 x .75” long, pin-in, stainless steel button head bolts
Fig 7.4
Fig 9
Fig 8.1
Fig 10
Fig 8.2
Fig 11 ck ar t, In c.
v .2
A ug
PG 8
Message Center Kiosk Installation Guide
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com from #03-911. Always apply a dab of Anti-Seize to each bolt first. Don’t over-tighten these bolts yet. After these 6 bolts are installed, REMOVE the two “swivel” bolts from step 2 and REPLACE them with (2) more button head bolts from #03-911. (See Fig 10)
5 REPEAT the previous steps 1-4 to INSTALL the Angled Shed Roof panel (#03-451 / 03-452). REFER to Fig 8.2 when INSTALLING the two (2) “swivel” bolts.
Part 4 : Final Steps
1 CHECK & TIGHTEN all loose bolts & screws starting with the bolts securing each of the Shed Roof mounting plates, followed by the bolts securing the Roof panels to the mounting plates.
2 REMOVE the 2x6 x 36 wood planks from the holes (from earlier). If the structure seems unstable, add more SUPPORT using 12’ long, 2x4 wood planks, and concrete spikes.
3 ENSURE the left/right edges of each Assembly Fixture remain flush against each of the vertical posts and all 4 corner bolts securing them to the posts are tight.
4 USE a framer’s level to CHECK the kiosk to VERIFY that it is level (Similar to Fig 12).
Tip: To elevate one side that is lower than the rest, make a stack of 2x4 or 2x6 wood planks di-rectly below the Assembly Fixture (on the low side). PLACE the bottle jack on top of the stack.
INCREASE the jack height until the jack pushes against the 1” angled flange (at the bottom of of the Assembly Fixture). CONTINUE raising the lower side until the structure becomes level (Similar to Fig 13).
5 FOLLOW manufacturer’s directions to MIX & POUR concrete into each hole (Similar to Fig 14). Now sit back and relax while the concrete hardens.
6 After the concrete has properly set, REMOVE the Assembly Fixtures
You’re done with building the Kiosk structure.
You are now ready to move on to STAGE II - Sign Panel Installation.
Fig 12 Fig 13 Fig 14 ck ar t, In c.
v .2
A ug
PG 9
Message Center Kiosk Installation Guide
Model: 03-450 Series 6x6, 2-Panel Angled Kiosk, Shed Roof (48x48 panels)
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
— REMINDER! —
Don’t forget to RETURN all UNDAMAGED ALUMINUM ASSEMBLY FIXTURE(s) to ROCKART as soon as possible to receive your refund.
• Simply pack up the UNDAMAGED fixtures into the same boxes they arrived in.
(No need to return any hardware that was included with them (i.e., nuts, bolts, & washers)
• Fill out the RMA form and send it along with the fixtures
Once they arrive at ROCKART, we will issue a full refund of the deposit for the fixtures (less shipping costs).
Important: SAVE ANY SPECIAL TOOLS!
• Please give any HEX Keys (Red & Yellow) to the Owner or Agency person(s) responsible for the kiosk.
• The YELLOW Hex Key is used to OPEN the Sign Panel Display. (i.e., to change the displayed content)
• The RED Hex Key is used to replace a damaged Roof Assembly in the future.
ck ar t, In c.
v .2
A ug
PG 103006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Message Center Kiosk STAGE II - Sign Panel Installation
STAGE II - Sign Panel Installation
Installation Note for Fully-Enclosed* Sign Panels:
Before mounting a Fully-Enclosed* Sign Panel to the Kiosk, check the orientation of the removable side rail. Fully-Enclosed sign panel displays will have 3 to 5 bolts embedded within this rail (circled on left) that secure the entire display and when installed, and should be along the right side.
For sign panels that include Routed Text across the header and/or footer, verify that the text is displayed as desired.
How to properly install a VandlGard® tamper-resistant nut:
If your kiosk sign panel included tamper-resistant mounting hardware, the odd-looking nuts are tamper resistant and should be installed as follows:
Start by threading the wide, tapered end of the cone-shaped nut onto the end of the bolt as shown by the green arrow (see top image, left). Twist clock-wise with fingers & thumb, until snug.
Using a hex wrench or pair of pliers, continue to tighten the Hex part of the nut until the hex part breaks off... leaving the conical part behind (see bottom image, left). Discard the hex nut. ... all done!
* A Fully-Enclosed Sign Panel protects the displayed content completely (on every side). These models feature a removable side rail (on either the left or right side), and a protective clear polycarbonate cover that is also removable.
Opening a “fully-enclosed” Sign Panel:
To open a Fully-Enclosed* Sign Panel (to change out the signage) you will need the special YELLOW colored Hex tool (included with fully-enclosed displays) to remove the 3 to 5 bolts along the right side (don’t lose them!). Remove the side rail. Grab the tail-end of the flexible security rod sitting on top of the clear polycarbonate cover, and pull it completely out of the channel through the opening (see image, left).
Slide the clear polycarbonate cover over enough to allow you to grasp it firmly on both left & right sides. Lift it straight up, pushing the top edge deeper into the top channel. Now, pivot the bottom edge of the cover out from the display (i.e., towards yourself). Take note which side was facing out (and when done, return it accordingly).
Place the clear cover in an area that is clean as possible while swapping out content.
When finished, simply follow these steps in reverse order. Don’t forget to RE-INSERT the flexible security rod ! Finally, use the YELLOW hex tool as before to secure the side access rail using the same bolts removed earlier.
Flexible Security Rod
Special Hex tool (#08-619) used to open fully-enclosed sign panels (included)
STAGE II - Sign Panel Installation
Important information for ROCKART® Sign Panels and Message Center Kiosks ck ar t, In c.
v .2
A ug
PG 113006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Message Center Kiosk Sign Panel Installation
Vertical Steel Post
Tackboard Sign
Slotted Sign Panel Mounting Tab
Plastic Flat Washer
VandlGard break-away nut. Tighten until hex part breaks off from conical part. Discard hex
2“ Dia. Stainless Steel Fender Washer
2“ Dia. Stainless Steel Fender Washer
Carriage Bolt
Black Nylon Carriage Bolt Adapter
FRONT of Kiosk
Clear Polycarbonate Cover (Optional) Vertical Steel Post
Slotted Sign Panel Mounting Tab
Plastic Flat Washer
VandlGard break-away nut. Tighten until hex part breaks off from conical part. Discard hex
2“ Dia. Stainless Steel Fender Washer
2“ Dia. Stainless Steel Fender Washer
Carriage Bolt
Black Nylon Carriage Bolt Adapter FRONT of Kiosk
Tackboard Sign
Header / Footer
Vertical Steel Post
Ballistic Tack Board Sign
Header / Footer
Header / Footer
Slotted Sign Panel Mounting Tab
Plastic Flat Washer
VandlGard break-away nut. Tighten until hex part breaks off from conical part. Discard hex
2“ Dia. Stainless Steel Fender Washer
2“ Dia. Stainless Steel Fender Washer
Carriage Bolt
Black Nylon Carriage Bolt Adapter FRONT of Kiosk
Tack Board Only #03-901 ASSEMBLY KIT
Header / Footer (Single-Sided) #03-903 ASSEMBLY KIT
Header / Footer (Double-Sided) #03-904 ASSEMBLY KIT
Using included hardware from #03-901, follow the hardware stacking guide (right) to secure each corner of the sign panel to the kiosk.
Using included hardware from #03-903, follow the hardware stacking guide (right) to secure each corner of the sign panel to the kiosk.
Using included hardware from #03-904, follow the hardware stacking guide (right) to secure each corner of the sign panel to the kiosk.
Sign Panel Installation
For Single- and Double-sided Sign Panels having 1 mounting hole in each corner ck ar t, In c.
v .2
A ug
PG 123006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Message Center Kiosk Removing Polycarbonate Cover
Removing Polycarbonate Cover
Removing the Cover
Important! DO NOT REMOVE the 4 Corner Bolts that secure the Sign Panel to the Kiosk!
1 USE the special YELLOW hex wrench (included with your sign panel) to REMOVE the tamper-resistant bolts usually located on the right side of a sign panel (from the Front side of kiosk). Don’t lose these bolts! The nuts are embedded in either the tack-board (for single-sided panels) or in a matching removable side rail on the opposing side (double-sided panels) and should stay in place while the bolts are removed.
Remove bolts marked as “1” (see figure, right).
2 REMOVE the side rail (or rails) of the Sign Panel and set aside.
3 PULL OUT the Flexible PLASTIC ROD inserted into the space above the polycarbonate cover. Don’t lose it! (This important security feature prevents vandals from removing the cover themselves)
4 SLIDE the cover over about an inch, so you can FIRMLY GRASP both sides.
5 LIFT the cover straight up into the top grooved channel then PIVOT the bottom edge towards your body, until it is completely free. Set the cover aside (somewhere clean) so it can be replaced with the same side facing outward. (Remember which side faces out... since UV or Anti-Graffiti films are usually applied to one side only.)
6 SWAP OUT SIGN CONTENT
Replacing the Cover
NOTE: Replace the cover with same side facing out (UV or Anti-Graffiti films are usually applied to one side only).
1 GRASP the left & right sides of the cover, INSERT the top edge fully into the top grooved channel.
2 PIVOT the bottom edge of cover to line up with the bottom grooved channel. Carefully RELEASE it, allowing it to sit in the bottom grooved channel.
3 GENTLY SLIDE the cover left/right (toward the non-removable side rail) until it cannot go any further.
4 RE-INSERT the Flexible PLASTIC ROD into the gap just above the cover itself.
5 Finally, REPLACE the vertical rail(s) and secure with the tamper-resistant bolts using the special YELLOW hex wrench.
Stuff You Need to Know These Instructions Apply to:
• You’ll need the specially-keyed, L-shaped YELLOW hex wrench #08-619 (included with fully-enclosed ROCKART® Sign Panels).
• The tackboard is VERY dense; thumbtacks and push-pins cannot penetrate it. Consider using an industrial staple gun with heavy duty staples.
• Keep the inside of the sign panel as clean as possible: While performing the steps below, avoid placing removed components directly on the ground. Using a tarp or other ground cover is recommended!
ROCKART®
Message Center Kiosk Standard Sign Panels
(Full-sized & Fully-Enclosed Single-or Double-sided Sign Panels)
IF YOU ARE REPLACING A DAMAGED COVER: If there are any protective (opaque) liners applied to either side of a polycarbonate cover REMOVE the protective liner from the cover as soon as possible. If the liner is exposed to sunlight for extended periods, it may be very difficult to remove.
Instructions only for “fully-enclosed” full-sized ROCKART® Sign Panels ck ar t, In c.
v .2
Se p0
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Message Center Kiosk Stage II - Sign Panel Installation
Installation note for “fully-enclosed” Sign Panels:
Before mounting a Fully-Enclosed* Sign Panel to the Kiosk, check the position of the removable side rail. The 3 to 5 bolts embedded within this rail (circled on left) are used to secure the entire display and when installed, should be located on the right side, vertically aligned.
If the sign panel was ordered with the optional routed text on the header and/or footer, ensure the text is oriented correctly and is readable when viewing the front side of the kiosk.
How to properly install a VandlGard® tamper-resistant nut:
If your kiosk sign panel included tamper-resistant mounting hardware, the strange looking nuts are tamper resistant and should be installed as follows:
Start by threading the wide, tapered end of the cone-shaped nut onto the end of the bolt as shown by the green arrow (top image, left). Hand tighten, until snug.
Using a handheld wrench or pliers, continue tightening the Hex part of the nut until the hex part shears off... leaving the conical part in place (bottom image, left). Discard the hex nut. ...Done!
*Fully-Enclosed models protect the displayed content on all sides. These models typically include at a removable side rail on either the left or right side, and a clear polycarbonate cover that is also removable.
Opening a “fully-enclosed“ Sign Panel:
To open up a fully-enclosed* Sign Panel to change the content inside use the special YELLOW colored hex tool (included in the hardware kit) to perform the following steps:
After the 3 to 5 bolts along the right side have been removed (keep in a safe place), Remove the side access rail. Grab the tail-end of the flexible security rod sitting in the narrow grooved channel just above the clear cover, and pull it completely out through the opening (see image, left).
Then slide the clear polycarbonate cover over just enough to allow you to grasp it firmly by the left & right sides. Lift it straight up, inserting the top edge deeper into the top channel. Now, swing the bottom edge of the cover out and away from the front of the kiosk (towards your body). Take note which side was facing out (and when done, return it accordingly).
Place the clear cover in an area that is clean as possible while changing content.
After changes to the content are done: Simply reinstall the clear polycarbonate cover; Don’t forget to RE-INSERT the flexible security rod ! Finally, using the special YELLOW hex tool (included), Re-attach the side access rail using the bolts removed earlier.
Flexible Security Rod
Special Hex tool used to open fully-enclosed sign panels (included)
Stage II - Sign Panel Installation
Important installation details for ROCKART Kiosk Sign Panels and Message Center family of Kiosks ck ar t, In c.
v .2
Se p0
3006 N. Maple | Mesa, AZ 85215 | P:(480) 854-3400 F:(480) 832-6390 | www.rockartsigns.com | sales@rockartsigns.com
Message Center Kiosk Sign Panel Install Guide
Vertical Steel Post
Tackboard Sign
Slotted Sign Panel Mounting Tab
Plastic Flat Washer
VandlGard break-away nut. Tighten until hex part breaks off from conical part. Discard hex
2“ Dia. Stainless Steel Fender Washer
2“ Dia. Stainless Steel Fender Washer
Carriage Bolt
Black Nylon Carriage Bolt Adapter
FRONT of Kiosk
Clear Polycarbonate Cover (Optional) Vertical Steel Post
Slotted Sign Panel Mounting Tab
Plastic Flat Washer
VandlGard break-away nut. Tighten until hex part breaks off from conical part. Discard hex
2“ Dia. Stainless Steel Fender Washer
2“ Dia. Stainless Steel Fender Washer
Carriage Bolt
Black Nylon Carriage Bolt Adapter FRONT of Kiosk
Tackboard Sign
Header / Footer
Vertical Steel Post
Ballistic Tack Board Sign
Header / Footer
Header / Footer
Slotted Sign Panel Mounting Tab
Plastic Flat Washer
VandlGard break-away nut. Tighten until hex part breaks off from conical part. Discard hex
2“ Dia. Stainless Steel Fender Washer
2“ Dia. Stainless Steel Fender Washer
Carriage Bolt
Black Nylon Carriage Bolt Adapter FRONT of Kiosk
Tack Board Only #03-901 ASSEMBLY KIT
Header / Footer (Single-Sided) #03-903 ASSEMBLY KIT
Header / Footer (Double-Sided) #03-904 ASSEMBLY KIT
Use the included hardware kit from 03-901, follow the hardware stacking order (shown on right) to secure each corner of the sign panel to the kiosk.
Use the included hardware kit from 03-903, follow the hardware stacking order (shown on right) to secure each corner of the sign panel to the kiosk.
Use the included hardware kit from 03-904, follow the hardware stacking order (shown on right) to secure each corner of the sign panel to the kiosk.
Sign Panel Install Guide
For Single- and Double-sided Sign Panels having 1 mounting hole in each corner
SCHEDULE OF ITEMS
Request for Proposal No. Contract No.
Job Title: WRFO Kiosk Installation
Estimated Start Date: September 1, 2025 Estimated Completion Date: October 30, 2025 Performance Time: 60 days
Item Pay Est. Unit Unit Total No. Item Description Quantity Price Amount
1 Installation of Kiosks (including removal of old) 14 EA EA $ $
Total Bid: $ (all or none)