GUFFEY GORGE DESIGN BUILD TRAIL Federal contract opportunity
Solicitation number
140L1722R0009
Issued by
Department of the Interior Bureau of Land Management Colorado Region

View the file

Other files for this federal contract opportunity

Other files attached to GUFFEY GORGE DESIGN BUILD TRAIL, newest first.
File Type Posted
Sol_140L1722R0009_Amd_0003.pdf PDF
Sol_140L1722R0009_Amd_0002.pdf PDF
Sol_140L1722R0009_Amd_0001.pdf PDF
B13_-_140L1722R0009_-Past_Performance_Questionnaire.doc DOC document
A04_-_140L1722R0009-Schedule_of_Items.xls XLS spreadsheet
Sol_140L1722R0009.pdf PDF
B13-140L1722R0009-_Form_889.pdf PDF
B03-140L1722R0009-_Wage_Rate.pdf PDF
A04_-_140L1722R0009-Scope_of_Work.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BLM COLORADO ENGINEERING

Guffey Gorge Design Build Trail - Addendum #1

PREBID MEETING:

Solicitation No: 140L1722R0009 Project: Guffey Gorge Design/Build Trail Date/Time: July 12, 2022 10:00AM Location: Guffey Gorge, Guffey, CO, 80820

CO: Chau Nguyen COR: Kris Chesonis PI: Zackery Koenig

ADMINISTRATIVE ITEMS:

• SAM.GOV Link: https://sam.gov/opp/2d58d27c6c7a49e7bbc09e0898d488ce/view

• Davis Bacon Wages. YES

• Period of Performance and Hours of work. 10/1/22 - 6/1/23 7:00am-5:00pm (negotiable) o Design Complete and Approved by 1 March 2023 o Construction Complete by 1 June 2023

• Required to be in SAMs for Award.

PROJECT REQUIREMENTS: MODIFICATIONS/CLARIFICATIONS

• Low Price Technically Acceptable Contract – Requirements listed in SOW

• No permits required

• Storm Water BMP when necessary

• Can cross the creek when required and operate in the creek with BLM permission

• Tree removal allowed with BLM permission

• Traffic control – Follow MUTCD if task requires it

• Site/Road Closures – need advance warning to Field Office and COR for temporary closure.

Day long closures are not allowed at this time. Contractor responsible to protect the work, hiking trail shall stay open

QUESTIONS/REQUEST FOR CLARIFICATION

o Hand Rails – To be placed where is industry best practice (No grade requirement) o Question: Is it possible to split this project up into a design project and then a construction project after the design is completed? I feel that my number for construction would be wildly off given the potential variability to the SOW.

Answer: No, we received a one-time grant and have to execute all of the funds this FY. I encourage all companies to visit the site, while design/build can seem like a lot of possibilities the space to work within is limited. In addition, BLM is looking to construct a trail to industry best practices.

o Question: If it is not possible to split this project up, what process is intended to be used to make adjustments to construction estimates if the design chosen requires significantly more materials and/or time than initially conceptualized?

Answer: BLM hopes to enter into a partnership with the winning contractor and to have all parties walk away successful. Per the FAR, this is a fixed priced contract and BLM is looking to build this trail to industry standards. BLM strives to work closely with the contractor and be aware of all scope and cost decisions and how it effects all parties involved.

o Question: Sam.gov has an original response and inactive date of 8/11/2022. Is this the deadline for when the proposals are due?

Answer: Yes, this is the date proposal is due o Question: Is there a page limit for the proposals?

Answer: Please refer to L-6 on Terms and Conditions o Question: Was the site visit on 7/12 mandatory for submitting a proposal?

Answer: No, but BLM Colorado Engineering HIGHLY recommends you visit the site and understand the existing trail.

o Question: RFP states “UTV can make it to the start of the trail (no further)”. Does this mean the start of the main trail? Or the steep sections/construction sites?

Trail Section #1 Answer: Yes, UTV, SXS, Equipment, Ext. can make it to this part of the trail (top and bottom) Trail Section #2 Answer: UTV, SXS, Equipment, Ext. can only make it to:

38°46'15.9"N 105°20'06.8"W Displayed in the map below, the red line show how far UTV, SXS, Equipment, Ext. can get to the red pin. The project starts for the second section of steep trail at the blue circle:

o Question: Can machines (mini trail dozers, excavators and crawlers) access both steep section construction sites and the staging areas 2 & 3? Or does all materials need to brought in by hand/stock/bike/electric bike and built by hand? I am unclear from the "possible ideas to get supplies to the project" on page 5 and the equipment requirements/examples on page 13 Answer: No, equipment can not be driven to the start of trail section #2 based on engineering review of the project. With that being said, engineering is open to creative ideas from the contractor, and we will support creative solution to the maximum extent possible. For example, a contractor could sling load a mini excavator into staging area #2 or #3, this project does not all have to be done by hand; it is up to the contractor to decide the best value and most cost effective solution. BLM Engineering highly recommends visiting the site and understanding the constraints.

Picture of the Trail section #2 taken 12 July 2022: