This is a Bid Sheet for the Red Mountain Road Upgrade project administered by the Bureau of Land Management (BLM) in 2026. The document is a pricing template for contractors to submit unit costs and total costs for road upgrade and maintenance work across multiple treatment sites.
The scope of work includes mobilization, road preparation, water supply, and culvert disposal as initial project tasks. The primary deliverables across 13 main treatment sites (Sites 2, 24, 25, 26.1, 29, 33, 34, 70, 80, 81, 95, and 99) and two additive sites (Sites 30 and 77) consist of rock material (measured in tons), rock transportation (lump sum), culvert installation (measured in linear feet), and installation labor (lump sum). Specific treatment sites vary in their component requirements; for example, Treatment Site 33 requires only culvert installation and labor, while Treatment Site 34 requires culverts, rock, transportation, and installation. The bid sheet requires contractors to enter quantity, unit cost, and calculate total cost for each line item, with a Sites Total row for the base scope and separate totals for each additive site. No response dates, award dates, or other contractual terms are specified in this template document.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Sheet – Red Mountain Road Upgrade Bureau of Land Management 2026
Treatment Site Location/Task
Quantity Unit Unit Cost Cost
Mobilization LS Road prep LS Water LS Culvert Disposals LS
Treatment Site 2 Rock TON
Rock Transport LS
Culvert LF
Installation LS
Treatment Site 24 Rock TON
Rock Transport LS
Install LS
Treatment Site 25
Rock TON
Rock Transport LS
Treatment Site 26.1
Rock Transport LS
Installation LS
Treatment Site 29 Culvert LF
Rock TON
Rock Transport
Installation
Treatment Site Location/Task Quantity Unit Unit Cost Cost
Treatment Site 33
Installation LS
Treatment Site 34 Culvert LF
Rock TON
Rock Transport LS
Installation LS
Treatment Site 70 Culvert LF
Rock TON
Rock Transport LS
Installation LS
Treatment Site 80 (spur 26) Culvert LF
Rock TON
Rock Transport LS
Installation LS
Treatment Site 81 (spur 26)
Culvert LF
Installation LS
Treatment Site 99 (spur 26)
Culvert LF
Rock TON
Rock Transport LS
Installation LS
Treatment Site 95 (spur 2)
Culvert LF
Rock TON
Rock Transport LS
Sites Total
Treatment Site Location/Task Quantity Unit Unit Cost Cost
Additive Site 30
Rock Transport LS
Total Site 30
Additive Site 77
Rock Transport LS
Total Site 77
File details come from the government source that posted it. Updated .