This is a Bid Sheet for the Red Mountain Road Upgrade project administered by the Bureau of Land Management (BLM) in 2026. The document is a pricing template for contractors to submit unit costs and total costs for road upgrade and maintenance work across multiple treatment sites.

The scope of work includes mobilization, road preparation, water supply, and culvert disposal as initial project tasks. The primary deliverables across 13 main treatment sites (Sites 2, 24, 25, 26.1, 29, 33, 34, 70, 80, 81, 95, and 99) and two additive sites (Sites 30 and 77) consist of rock material (measured in tons), rock transportation (lump sum), culvert installation (measured in linear feet), and installation labor (lump sum). Specific treatment sites vary in their component requirements; for example, Treatment Site 33 requires only culvert installation and labor, while Treatment Site 34 requires culverts, rock, transportation, and installation. The bid sheet requires contractors to enter quantity, unit cost, and calculate total cost for each line item, with a Sites Total row for the base scope and separate totals for each additive site. No response dates, award dates, or other contractual terms are specified in this template document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Sheet – Red Mountain Road Upgrade Bureau of Land Management 2026

Treatment Site Location/Task

Quantity Unit Unit Cost Cost

Mobilization LS Road prep LS Water LS Culvert Disposals LS

Treatment Site 2 Rock TON

Rock Transport LS

Culvert LF

Installation LS

Treatment Site 24 Rock TON

Rock Transport LS

Install LS

Treatment Site 25

Rock TON

Rock Transport LS

Treatment Site 26.1

Rock Transport LS

Installation LS

Treatment Site 29 Culvert LF

Rock TON

Rock Transport

Installation

Treatment Site Location/Task Quantity Unit Unit Cost Cost

Treatment Site 33

Installation LS

Treatment Site 34 Culvert LF

Rock TON

Rock Transport LS

Installation LS

Treatment Site 70 Culvert LF

Rock TON

Rock Transport LS

Installation LS

Treatment Site 80 (spur 26) Culvert LF

Rock TON

Rock Transport LS

Installation LS

Treatment Site 81 (spur 26)

Culvert LF

Installation LS

Treatment Site 99 (spur 26)

Culvert LF

Rock TON

Rock Transport LS

Installation LS

Treatment Site 95 (spur 2)

Culvert LF

Rock TON

Rock Transport LS

Sites Total

Treatment Site Location/Task Quantity Unit Unit Cost Cost

Additive Site 30

Rock Transport LS

Total Site 30

Additive Site 77

Rock Transport LS

Total Site 77