Sol_140L0626Q0018.pdf

PDF 2 MB Posted

Attached to
HVAC Replacement at Jupiter ONA - Unit B, Tindall Federal contract opportunity
Solicitation number
140L0626Q0018
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a Request for Quotation (RFQ) for HVAC replacement services at the Jupiter Inlet Lighthouse Outstanding Natural Area in Jupiter, Florida. The Bureau of Land Management (BLM) is soliciting firm-fixed-price quotations for the urgent replacement of heating, ventilation, and air conditioning systems across three structures: the Unit B Administration Building, the historic Tindall House, and the Tindall Kitchen replica. The contractor must furnish all labor, materials, equipment, supervision, and transportation necessary to remove existing HVAC systems and install new split systems sized at 4 tons for the Administration Building and 2 tons each for the Tindall structures. Work must be completed within 15 calendar days of contract award, operating between 7:00 AM and 5:00 PM Eastern Time, Monday through Friday. All installations must meet current ASHRAE and DOE efficiency standards, include hurricane straps per Florida Building Code, and maintain minimum one-year labor and five-year parts warranties.

This is a 100% small business set-aside acquisition under NAICS code 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 million size standard. Quotations are due by August 11, 2026, at 12:00 PM ET, submitted via email to Oksana Rollins and Matthew Gilger. A mandatory site visit is scheduled for August 6, 2026, at 9:00 AM ET, with questions due by the same date at 12:00 PM ET. The Government will evaluate quotations using Lowest Price Technically Acceptable (LPTA) procedures, with technical acceptability being a pass/fail criterion requiring evidence of equipment specifications, installation schedule, applicable warranties, and liability insurance meeting DIAR 1452.228-70 requirements. Award will be made to the responsible quoter submitting the lowest evaluated price. Davis-Bacon Act prevailing wage requirements apply, with Wage Determination No. FL20260079 Modification 1 (dated May 18, 2026) incorporated into the contract. Payment will be made through the Invoice Processing Platform (IPP), and contractors must maintain comprehensive liability insurance including workers' compensation ($100,000), general liability ($500,000), and automobile liability coverage.

View the file

Other files for this federal contract opportunity

Other files attached to HVAC Replacement at Jupiter ONA - Unit B, Tindall, newest first.
File Type Posted
B09_Attachment_1_-_Questions_and_Answers_0002.pdf PDF
Sol_140L0626Q0018_Amd_0002.pdf PDF
Sol_140L0626Q0018_Amd_0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(See ).

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

SOLICITATION

1. SOLICITATION NO.

5. REQUISITION/PURCHASE REQUEST NO.

CODE

6. PROJECT NO.

8. ADDRESS OFFER TO

4. CONTRACT NO.

7. ISSUED BY

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

11. The contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and

b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than

STANDARD FORM 1442 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

is, is not required.

local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.

calendar days and complete it within calendar days after receiving

a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

12b. CALENDAR DAYS

2. TYPE OF SOLICITATION

NEGOTIATED (RFP) REQUEST FOR PROPOSAL

3. DATE ISSUED PAGE OF

SEALED BID (IFB) INVITATION FOR BID

9. FOR

INFORMATION CALL

PAGES

140L0626Q0018

BLM DBS SUPPLIES AND SERVICES - NOC

DENVER FEDERAL CENTER

BLDG. 85

POB 25047

Denver CO 80225-0047

LNB

Oksana Rollins (303) 236-1853

07/24/2026

08/11/2026

10 15

Jupiter Inlet Lighthouse Outstanding Natural Area (ONA) Unit B ¿ Administration (Office) Building, Tindall House, and Tindall Kitchen

This acquisition will be conducted using the commercial acquisition procedures of FAR Part 12, Acquisition of Commercial Products and Commercial Services, in conjunction with the construction requirements of FAR Part 36. This solicitation is an electronic Request for Quotations (RFQ) for a single-award, firm-fixed-price construction project located in Palm Beach County, Florida.

NAICS: 238220 -Plumbing, Heating, and Air-Conditioning Contractors; Small business size standard of

$19M.

SITE VISIT: A site visit will be held on August 5, 2026, at 9:00 AM Eastern Time (ET). See Section 5 for additional information.

QUESTIONS DUE: August 6, 2026, no later than 12:00 PM ET. See Section 5 for additional information.

Continued...

1 39

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

OFFER (Must be fully completed by offeror)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AWARD (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14.)

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

21. ITEMS ACCEPTED:

22. AMOUNT

26. ADMINISTERED BY

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31c. DATE

STANDARD FORM 1442 (REV. 12/2022) BACK

31b. UNITED STATES OF AMERICA

BY

31a. NAME OF CONTRACTING OFFICER (Type or print)

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30b. SIGNATURE 30c. DATE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

copies to issuing office.) Contractor agrees to furnish

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

23. ACCOUNTING AND APPROPRIATION DATA

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES CODE AT

27. PAYMENT WILL BE MADE BY

10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )

20b. SIGNATURE 20c. OFFER DATE

Continued...

AMENDMENT

NUMBER

DATE.

BLM DBS SUPPLIES AND SERVICES - NOC

DENVER FEDERAL CENTER

BLDG. 85

POB 25047

Denver CO 80225-0047

LNB

Matthew Gilger

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140L0626Q0018

QUOTATIONS DUE: August 11, 2026, no later than

12:00 PM ET. See Section 5 for additional information.

00010 Jupiter Inlet Lighthouse Outstanding Natural

Area (ONA) Unit B - Administration (Office)

Building, Tindall House, and Tindall Kitchen:

All labor, material, equipment, and supervision for HVAC Replacement, Jupiter, FL in accordance with the statement of work and associated documents.

Product/Service Code: Z2AZ

Product/Service Description: REPAIR OR

ALTERATION

OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE

BUILDINGS

Combined Synopsis/Solicitation 140L0626Q0018

Pursuant to Federal Acquisition Regulations (FAR) 12.202, the Contracting Officer is issuing a combined synopsis/solicitation for the acquisition of HVAC replacement services at Jupiter Inlet Lighthouse

Outstanding Natural Area (ONA).

(i) This is a combined synopsis/solicitation for the acquisition of commercial services in accordance with the format in FAR 12.202, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotations are being requested and a written solicitation will not be issued.

(ii) Solicitation Number 140L0626Q0018 is being issued as a Request for Quotation (RFQ). This solicitation will utilize the policies and procedures for the solicitation in FAR Part 12.

(iii) The solicitation document and incorporated provisions and clauses are those in effect through

Federal Acquisition Circular (FAC) 2026-01 / 3-13-2026. This solicitation is a 100% small-business set-aside. The Government anticipates that the effort is performed under NAICS code 238220, Plumbing, Heating, and Air Conditioning Contractors, with the small business size standard of $19M.

(iv) See the attached Statement of Work (SOW) for detailed requirements (Section 1). Davis-

Bacon Act Wage Determination No. FL20260079 Modification 1 dated May 18, 2026 is hereby incorporated into this combined synopsis/solicitation (Attachment 1)

DESCRIPTION OF REQUIREMENTS:

The combined synopsis/solicitation is issued by the Department of the Interior (DOI), Bureau of Land

Management (BLM), on behalf of the Southeastern States District Office (SSDO).

The Bureau of Land Management (BLM) seeks qualified contractor services to perform the urgent replacement of Heating, Ventilation, and Air Conditioning (HVAC) systems at three structures within the

Jupiter Inlet Lighthouse Outstanding Natural Area (ONA). These structures include the Unit B

Administration Building, the historic Tindall House, and the Tindall Kitchen replica. Collectively, these buildings serve the administrative and visitor-support functions of the ONA and require reliable cooling to ensure staff comfort, public accessibility, and preservation of historic interpretive environments.

The existing systems across these buildings are aged and in various stages of decline. Replacement is necessary to restore dependable cooling capacity, improve energy efficiency, and prevent operational disruptions. This Statement of Work outlines the expectations, conditions, and responsibilities associated with completing the HVAC replacements.

The Contractor shall provide to the Government the following:

The contractor shall furnish all labor, materials, tools, transportation, and professional expertise necessary to remove and replace the HVAC systems in the Unit B Administration Building, Tindall House, and

Tindall Kitchen. The contractor is responsible for assessing existing infrastructure, completing all mechanical work, and ensuring full functionality of the replaced systems.

CONTRACT TYPE: The requirement will be awarded as a firm-fixed price.

PERIOD OF PERFORMANCE: The period of performance of this purchase order is 15 calendar days from contract award.

REQUEST FOR QUOTE: The Request for Quote documents can be accessed at the following website:

https://www.sam.gov/. Please see the attachments for detailed information.

DUE DATE: Responses to this RFQ shall be submitted to Oksana Rollins at oksana_rollins@ios.doi.gov and Matt Gilger matthew_gilger@ios.doi.gov no later than 12:00 PM EST, August 11, 2026.

https://www.sam.gov/ mailto:oksana_rollins@ios.doi.gov%20 mailto:oksana_rollins@ios.doi.gov%20 mailto:matthew_gilger@ios.doi.gov

RFQ# 140L0626Q0018

Bureau of Land Management (BLM)

Jupiter Inlet Lighthouse Outstanding Natural Area (ONA) Unit B – Administration (Office) Building, Tindall House, and Tindall Kitchen

Point of Contacts

BLM Contacts Contract Specialist (CS) Contracting Officer (CO)

Name/Email Oksana Rollins / oksana_rollins@ios.doi.gov Matthew Gilger / matthew_gilger@ios.doi.gov mailto:oksana_rollins@ios.doi.gov mailto:matthew_gilger@ios.doi.gov

Table of Contents

SECTION 1: STATEMENT OF WORK

SECTION 2: ADMINISTRATION DATA

2.1 PERIOD OF PERFORMANCE

2.2 PLACE OF PERFORMANCE

2.3 HOURS OF OPERATIONS

2.4 PRICING

SECTION 3 CLAUSES/PROVISIONS

52.232-39 - Unenforceability of Unauthorized Obligations (Jun 2013)

SECTION 4: LIST OF ATTACHMENTS TO RFQ

SECTION 5. INSTRUCTIONS - ADDENDUM TO FAR 52.212-1 INSTRUCTIONS TO OFFERORS – COMMERCIAL

PRODUCTS AND COMMERCIAL SERVICES

SECTION 6: EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (FAR 52.212-2 Jul

2026)

QUOTE SUBMISSION CHECKLIST

SECTION 1: STATEMENT OF WORK

Statement of Work (SOW)

HVAC Replacement

Bureau of Land Management

Jupiter Inlet Lighthouse Outstanding Natural Area (ONA)

Unit B – Administration (Office) Building, Tindall House, and Tindall Kitchen

600 State Road 707, Jupiter, FL

1. Introduction and Purpose

The Bureau of Land Management (BLM) seeks qualified contractor services to perform the urgent replacement of Heating, Ventilation, and Air Conditioning (HVAC) systems at three structures within the Jupiter Inlet Lighthouse Outstanding Natural

Area (ONA). These structures include the Unit B Administration Building, the historic Tindall House, and the Tindall Kitchen replica. Collectively, these buildings serve the administrative and visitor-support functions of the ONA and require reliable cooling to ensure staff comfort, public accessibility, and preservation of historic interpretive environments.

The existing systems across these buildings are aged and in various stages of decline. Replacement is necessary to restore dependable cooling capacity, improve energy efficiency, and prevent operational disruptions. This Statement of Work outlines the expectations, conditions, and responsibilities associated with completing the HVAC replacements.

2. Facility Background and Existing Conditions

Unit B – Administration Building

The Administration Building consists of approximately 2,000 square feet and supports a routine occupancy of seven staff members, with peak occupancy ranging from 10 to 15 people during meetings or special activities. The building currently relies on a 4-ton split HVAC system consisting of:

• An indoor air-handling unit located in a small mechanical closet near the main entry corridor

• An outdoor condenser installed at the rear of the building on an existing concrete pad

Photos 1–3 provided by the Government depict the current air handler, its closet configuration, and the associated interior mechanical arrangement.

Given the building’s cooling load and occupancy patterns, the replacement system shall remain sized at 4 tons.

Tindall House

The Tindall House is an approximately 900-square-foot historic structure interpreted as part of the ONA’s cultural landscape.

It is not continuously occupied and serves primarily as a visitor-orientation and historic exhibit space. The air handler for this building is mounted in the attic, while the outdoor condenser is installed on a ground-level concrete pad adjacent to the kitchen building.

Photo 4 shows the paired outdoor condensers serving both Tindall structures.

To ensure adequate temperature control for artifact preservation and visitor comfort—while recognizing the building’s intermittent occupancy, a 2-ton HVAC system is appropriate and shall be installed.

Tindall Kitchen

The Tindall Kitchen structure is a 600-square-foot replica building used for interpretive programming, but it is not a functional kitchen; it contains no heat-producing appliances, no running water, and minimal internal load. As with the Tindall

House, the air handler is located in the attic, and the outdoor condenser is situated on an existing concrete pad adjacent to the building.

Photo 4 shows the paired outdoor condensers serving both Tindall structures.

To maintain consistency across both buildings, and based on environmental conditions and structural layout, a 2-ton replacement system shall be installed.

3. Scope of Work (Narrative Description)

The contractor shall furnish all labor, materials, tools, transportation, and professional expertise necessary to remove and replace the HVAC systems in the Unit B Administration Building, Tindall House, and Tindall Kitchen. The contractor is responsible for assessing existing infrastructure, completing all mechanical work, and ensuring full functionality of the replaced systems.

Assessment and Planning

Before work begins, the contractor shall perform an assessment of existing refrigerant lines, drains, electrical service disconnects, and mounting surfaces. Special attention shall be given to the refrigerant line-set serving Unit B to determine whether it may be reused or requires replacement. A brief written summary of these findings shall be provided.

Removal of Existing Components

The contractor shall safely disconnect and remove:

• The indoor air handlers in all locations (Unit B closet, Tindall House attic, Tindall Kitchen attic)

• The outdoor condensers at each building, including all associated hardware, outdated electrical whip connections, and deteriorated mounts

All refrigerant must be properly captured following EPA Section 608 guidance. All removed components must be transported off-site for lawful disposal.

Installation of New HVAC Systems

New systems shall be installed as follows:

Unit B Administration Building:

• A new 4-ton split system installed in the existing closet and on the existing pad

• Use of the existing pad is required

• If the existing line-set cannot be reused, a full line-set replacement must be completed, if this work is not needed the government will require a credit back.

• The system shall meet current ASHRAE and DOE efficiency standards

Tindall House:

• A new 2-ton split system

• Air handler installed in the attic

• Condenser installed on the existing concrete pad

• The system shall meet current ASHRAE and DOE efficiency standards

Tindall Kitchen:

• A new 2-ton split system

• Air handler installed in the attic

• Condenser installed on the existing pad

• The system shall meet current ASHRAE and DOE efficiency standards

Across all exterior units, the contractor shall install hurricane straps consistent with Florida Building Code requirements and local wind-load standards. Appropriate vibration pads, condensate components, insulation, electrical disconnects, and line-set protections shall be installed as needed.

System Testing, Charging, and Commissioning

Following installation, the contractor shall:

• Perform leak testing and system evacuation

• Charge the systems with manufacturer-specified refrigerant quantities

• Test thermostat controls and ensure proper integration

• Measure and record system performance through airflow readings, temperature differential, and amperage measurements

• Provide a basic operational demonstration for ONA staff

4. Deliverables

The contractor shall provide:

• A pre-work assessment summary

• Fully installed HVAC systems at all three buildings

• Written confirmation of proper disposal of removed units

• A commissioning report outlining performance testing

• Complete warranty documentation

• Photographic documentation of new installations (optional but encouraged)

5. Warranty Requirements

Industry-standard warranty requirements apply:

• A minimum one-year labor warranty covering defects in installation or workmanship

• A minimum five-year parts warranty for all major components, or the manufacturer’s standard offering

• Any extended manufacturer warranty available at no additional cost must be included

6. Contractor Responsibilities

The contractor shall maintain a safe worksite, protect adjacent vegetation and historic elements, ensure full compliance with applicable building codes and EPA guidelines, and complete daily cleanup. All attic work must be completed with care, preventing debris or damage to exhibit elements below.

7. Period of Performance

The contractor will have 15 calendar days to complete the work after issuance of the notice of proceed.

8. Government Furnished Property

The Government will not provide tools, equipment, or materials. Access to building interiors and the site will be coordinated to support efficient work execution.

9. Coordination and Access

The contractor shall coordinate timing and progress updates with the ONA Program Manager or designated representative.

(END OF SECTION 1)

SECTION 2: ADMINISTRATION DATA

2.1 PERIOD OF PERFORMANCE

The contractor will have 15 calendar days to complete the work after issuance of the notice of proceed.

2.2 PLACE OF PERFORMANCE

Jupiter Inlet Lighthouse Outstanding Natural Area (ONA)

Unit B (Administration Office Building) and Tindall House, and Tindall Kitchen

600 State Road 707, Jupiter, FL 33469

2.3 HOURS OF OPERATIONS

The Contractor shall perform the replacement service between 7:00 AM and 5:00 PM ET, Monday through

Friday.

2.4 PRICING

Pricing- This Purchase Order shall be Firm Fixed Price (FFP) Lump Sum.

The contractor shall provide a firm-fixed-price quotation that identifies the proposed equipment manufacturer, model number, capacity, and efficiency rating; the proposed installation schedule; applicable equipment and workmanship warranties; and any assumptions or exclusions. The quotation shall include sufficient information to demonstrate that the proposed equipment and installation meet the requirements.

(END OF SECTION 2)

SECTION 3 CLAUSES/PROVISIONS

Solicitation Clauses (Clauses will be incorporated into award)

52.252-2 -- Clauses Incorporated by Reference (Feb 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://www.acquisition.gov

Clause Title Date

52.204-9 Personal Identity Verification of Contractor Personnel Jan-11

52.204-13 System for Award Management Maintenance Jul-26

52.204-19 Incorporation by Reference of Representations and Certifications Dec-14

52.212-4 Contract Terms and Conditions—Commercial Items Jul-26

52.232-40 Providing Accelerated Payments to Small Business Subcontractors Mar-23

(End of Clause)

52.222-6 Construction Wage Rate Requirements (Jul 2026)

(a) Definition.—"Site of the work"—

(1) Means—

(i) The primary site of the work. The physical place or places where the construction called for in the contract will remain when work on it is completed; and

(ii) The secondary site of the work, if any. Any other site where a significant portion of the building or work is constructed, provided that such site is-

(A) Located in the United States; and

(B) Established specifically for the performance of the contract or project;

(2) Except as provided in paragraph (3) of this definition, includes any fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided-

(i) They are dedicated exclusively, or nearly so, to performance of the contract or project; and http://www.acquisition.gov/

(ii) They are adjacent or virtually adjacent to the "primary site of the work" as defined in paragraph (a)(1)(i), or the

"secondary site of the work" as defined in paragraph (a)(1)(ii) of this definition;

(3) Does not include permanent home offices, branch plant establishments, fabrication plants, or tool yards of a Contractor or subcontractor whose locations and continuance in operation are determined wholly without regard to a particular Federal contract or project. In addition, fabrication plants, batch plants, borrow pits, job headquarters, yards, etc., of a commercial or material supplier which are established by a supplier of materials for the project before opening of bids and not on the Project site, are not included in the "site of the work." Such permanent, previously established facilities are not a part of the "site of the work" even if the operations for a period of time may be dedicated exclusively or nearly so, to the performance of a contract.

(b)

(1) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, or as may be incorporated for a secondary site of the work, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Any wage determination incorporated for a secondary site of the work must be effective from the first day on which work under the contract was performed at that site and must be incorporated without any adjustment in contract price or estimated cost. Laborers employed by the construction Contractor or construction subcontractor that are transporting portions of the building or work between the secondary site of the work and the primary site of the work must be paid in accordance with the wage determination applicable to the primary site of the work.

(2) Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Construction

Wage Rate Requirements statute on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (e) of this clause; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such period.

(3) Such laborers and mechanics must be paid not less than the appropriate wage rate and fringe benefits in the wage determination for the classification of work actually performed, without regard to skill, except as provided in the clause entitled Apprentices and Trainees. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein; provided that the employer’s payroll records accurately set forth the time spent in each classification in which work is performed.

(4) The wage determination (including any additional classifications and wage rates conformed under paragraph (c) of this clause) and the Construction Wage Rate Requirements (Davis-Bacon Act) poster (WH-1321) must be posted at all times by the Contractor and its subcontractors at the primary site of the work and the secondary site of the work, if any, in a prominent and accessible place where it can be easily seen by the workers.

(c)

(1) The Contractor must complete and submit to the Contracting Officer the Standard Form (SF) 1444, Request for

Authorization of Additional Classification and Rate, if any class of laborers or mechanics that is not listed in the wage determination applicable to the contract is to be employed under the contract. Upon receipt of a complete SF 1444, the

Contracting Officer will submit a report to the Administrator, Wage and Hour Division, for approving, modifying, disapproving, or rendering a final determination, of the additional classification and wage rate including any amount designated for fringe benefits.

(2) The wage rate (including fringe benefits, where appropriate) determined pursuant to subparagraph (c) of this clause must be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification.

(d) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the Contractor must either pay the benefit as stated in the wage determination or must pay another bona fide fringe benefit or an hourly cash equivalent thereof.

(e) If the Contractor does not make payments to a trustee or other third person, the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program; provided, that the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Construction Wage Rate Requirements statute have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program.

(End of clause)

52.222-7 Withholding of Funds (Jul 2026)

The Contracting Officer must, upon his or her own action or upon written request of an authorized representative of the

Department of Labor, withhold or cause to be withheld from the Contractor under this contract or any other Federal contract with the same Prime Contractor, or any other federally assisted contract subject to prevailing wage requirements, which is held by the same Prime Contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, all or part of the wages required by the contract, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased.

52.222-8 Payrolls and Basic Records (Jul 2026)

(a) Payrolls and basic records relating thereto must be maintained by the Contractor during the course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics working at the site of the work. Such records must contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 40 U.S.C. 3141(2)(B) (Construction Wage Rate Requirement statute)), daily and weekly number of hours worked, deductions made, and actual wages paid. Whenever the Secretary of Labor has found, under paragraph (d) of the clause entitled Construction Wage Rate Requirements, that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in 40 U.S.C. 3141(2)(B), the

Contractor must maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits.

Contractors employing apprentices or trainees under approved programs must maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs.

(b)

(1) The Contractor must submit weekly for each week in which any contract work is performed a copy of all payrolls to the

Contracting Officer. The payrolls submitted must set out accurately and completely all of the information required to be maintained under paragraph (a) of this clause, except that full social security numbers and home addresses must not be included on weekly transmittals. Instead the payrolls must only need to include an individually identifying number for each employee (e.g., the last four digits of the employee’s social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose and may be obtained from the U.S.

Department of Labor Wage and Hour Division website at https://www.dol.gov/agencies/whd/forms. The Prime Contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors must maintain the full social security number and current address of each covered worker, and must provide them upon request to the

Contracting Officer, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a Prime

Contractor to require a subcontractor to provide addresses and social security numbers to the Prime Contractor for its own records, without weekly submission to the Contracting Officer.

(2) Each payroll submitted must be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and must certify-

(i) That the payroll for the payroll period contains the information required to be maintained under paragraph (a) of this clause and that such information is correct and complete;

(ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section3141(2)(B)&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section3141(2)(B)&num=0&edition=prelim https://www.dol.gov/whd/forms/wh347.pdf https://www.dol.gov/agencies/whd/forms forth in the Regulations, 29 CFR Part 3; and

(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract.

(3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 must satisfy the requirement for submission of the "Statement of Compliance" required by subparagraph (b)(2) of this clause.

(4) The falsification of any of the certifications in this clause may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of Title 31 of the United States Code.

(c) The Contractor or subcontractor must make the records required under paragraph (a) of this clause available for inspection, copying, or transcription by the Contracting Officer or authorized representatives of the Contracting Officer or the Department of Labor. The Contractor or subcontractor must permit the Contracting Officer or representatives of the

Contracting Officer or the Department of Labor to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit required records or to make them available, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12.

52.222-9 Apprentices and Trainees (Jul 2026)

(a) Apprentices.

(1) An apprentice will be permitted to work at less than the predetermined rate for the work performed when employed-

(i) Pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of

Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer, and Labor Services

(OATELS) or with a State Apprenticeship Agency recognized by the OATELS; or

(ii) In the first 90 days of probationary employment as an apprentice in such an apprenticeship program, even though not individually registered in the program, if certified by the OATELS or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice.

(2) The allowable ratio of apprentices to journeymen on the job site in any craft classification must not be greater than the ratio permitted to the Contractor as to the entire work force under the registered program.

(3) Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in paragraph (a)(1) of this clause, must be paid not less than the applicable wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program must be paid not less than the applicable wage rate on the wage determination for the work actually performed.

(4) Where a Contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman’s hourly rate) specified in the Contractor’s or subcontractor’s registered program must be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice’s level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination.

(5) Apprentices must be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes must be paid in accordance with that determination.

(6) In the event OATELS, or a State Apprenticeship Agency recognized by OATELS, withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved.

(b) Trainees.

(1) Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration, Office of

Apprenticeship Training, Employer, and Labor Services (OATELS). The ratio of trainees to journeymen on the job site must not be greater than permitted under the plan approved by OATELS.

(2) Every trainee must be paid at not less than the rate specified in the approved program for the trainee’s level of progress, https://www.dol.gov/whd/forms/wh347.pdf expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees must be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees must be paid the full amount of fringe benefits listed in the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate in the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the

OATELS must be paid not less than the applicable wage rate in the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program must be paid not less than the applicable wage rate in the wage determination for the work actually performed.

(3) In the event OATELS withdraws approval of a training program, the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved.

(c) Equal employment opportunity. The utilization of apprentices, trainees, and journeymen under this clause must be in conformity with the equal employment opportunity requirements of Executive Order11246, as amended, and 29 CFR Part

30.

52.222-10 Compliance with Copeland Act Requirements (Jul 2026)

The Contractor must comply with the requirements of 29 CFR Part 3, which are hereby incorporated by reference in this contract.

52.222-11 Subcontracts (Labor Standards) (Jul 2026)

(a) Definition. "Construction, alteration or repair," as used in this clause, means all types of work done by laborers and mechanics employed by the construction Contractor or construction subcontractor on a particular building or work at the site thereof, including without limitation-

(1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off-site;

(2) Painting and decorating;

(3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work;

(4) Transportation of materials and supplies between the site of the work within the meaning of paragraphs (a)(1)(i) and (ii) of the "site of the work" as defined in the FAR clause at 52.222-6, Construction Wage Rate Requirements of this contract, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the "site of the work" definition; and

(5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the "site of the work" definition in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, and the physical place or places where the building or work will remain (paragraph

(a)(1)(i) of the FAR clause at 52.222-6, in the "site of the work" definition).

(b) The Contractor must insert in any subcontracts for construction, alterations and repairs within the United States the clauses entitled-

(1) Construction Wage Rate Requirements;

(2) Contract Work Hours and Safety Standards-Overtime Compensation (if the clause is included in this contract);

(3) Apprentices and Trainees;

(4) Payrolls and Basic Records;

(5) Compliance with Copeland Act Requirements;

(6) Withholding of Funds;

(7) Subcontracts (Labor Standards);

(8) Contract Termination-Debarment;

(9) Disputes Concerning Labor Standards;

(10) Compliance with Construction Wage Rate Requirements and Related Regulations; and

(11) Certification of Eligibility.

(c) The prime Contractor must be responsible for compliance by any subcontractor or lower tier subcontractor performing construction within the United States with all the contract clauses cited in paragraph (b).

(d) https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_6 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_6 https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-52#FAR_52_222_6

(1) Within 14 days after award of the contract, the Contractor must deliver to the Contracting Officer a completed Standard Form (SF) 1413, Statement and Acknowledgment, for each subcontract for construction within the

United States, including the subcontractor’s signed and dated acknowledgment that the clauses set forth in paragraph (b) of this clause have been included in the subcontract.

(2) Within 14 days after the award of any subsequently awarded subcontract the Contractor must deliver to the Contracting

Officer an updated completed SF 1413 for such additional subcontract.

(e) The Contractor must insert the substance of this clause, including this paragraph (e) in all subcontracts for construction within the United States.

52.222-12 Contract Termination-Debarment (May 2014)

A breach of the contract clauses entitled Construction Wage Rate Requirements, Contract Work Hours and Safety Standards-

Overtime Compensation, Apprentices and Trainees, Payrolls and Basic Records, Compliance with Copeland Act

Requirements, Subcontracts (Labor Standards), Compliance with Construction Wage Rate Requirements and Related

Regulations, or Certification of Eligibility may be grounds for termination of the contract, and for debarment as a Contractor and subcontractor as provided in 29 CFR 5.12.

52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014)

All rulings and interpretations of the Construction Wage Rate Requirements and related statutes contained in 29 CFR parts 1, 3, and 5 are hereby incorporated by reference in this contract.

52.222-14 Disputes Concerning Labor Standards (Jul 2026)

The United States Department of Labor has set forth in 29 CFR parts 5, 6, and 7 procedures for resolving disputes concerning labor standards requirements. Such disputes must be resolved in accordance with those procedures and not the

Disputes clause of this contract. Disputes within the meaning of this clause include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives.

52.222-15 Certification of Eligibility (May 2014)

(a) By entering into this contract, the Contractor certifies that neither it nor any person or firm who has an interest in the

Contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of 40 U.S.C. 3144(b)(2) or 29

CFR 5.12(a)(1).

(b) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of 40 U.S.C. 3144(b)(2) or 29 CFR 5.12(a)(1).

(c) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001.

52.225-9 Buy American-Construction Materials (Jul 2026)

(a) Definitions. As used in this clause—

Commercially available off-the-shelf (COTS) item—

(1) Means any item of supply (including construction material) that is–

(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal

Acquisition Regulation (FAR) 2.101);

(ii) Sold in substantial quantities in the commercial marketplace; and

(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.

"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and https://www.gsa.gov/forms-library/statement-and-acknowledgment https://www.gsa.gov/forms-library/statement-and-acknowledgment http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section3144(b)(2)&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title40-section3144(b)(2)&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title18-section1001&num=0&edition=prelim http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title46-section40102(4)&num=0&edition=prelim audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.

Cost of components means—

(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or

(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit.

Cost of components does not include any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.

Domestic construction material means—

(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-

(i) An unmanufactured construction material mined or produced in the United States; or

(ii) A construction material manufactured in the United States, if–

(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or

(B) The construction material is a COTS item; or

(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".

Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a construction material other than a domestic construction material.

Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United…