This is a Questions and Answers attachment for Solicitation #140L0626Q0018 concerning JILONA Unit B, Tindal House and Kitchen AC Replacement.
The document addresses five clarification questions submitted by potential quoters regarding HVAC system replacement requirements. Coastal unit designation is not required, though all equipment must be suitable for the project location and meet Florida Building Code and local wind-load requirements. Heat pump systems are acceptable alternatives to auxiliary heat kits if they meet required capacities, fit existing configurations, are compatible with electrical service and controls, and satisfy all efficiency and code requirements; quoters must identify manufacturer, model number, capacity, efficiency rating, warranties, and any required modifications. A separate Health and Safety or Accident Prevention Plan is not required, though contractors must comply with FAR 52.236-13 and applicable OSHA standards. Certified weekly payrolls are mandatory for all weeks work is performed and may be submitted in any format containing required information; Optional Form WH-347 is permitted but not mandatory, and each submission must include a signed Statement of Compliance. The contractor bears sole responsibility for properly recovering refrigerant according to EPA Section 608 requirements and transporting all removed HVAC equipment and components off-site for lawful disposal; recovered materials should not be turned over to facility support staff unless otherwise directed by the Contracting Officer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L0626Q0018_Amd_0002.pdf | ||
| Sol_140L0626Q0018_Amd_0001.pdf | ||
| Sol_140L0626Q0018.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation # 140L0626Q0018 JILONA Unit B, Tindal House and Kitchen AC Replacement
Attachment 1 - Questions and Answers
Item Question Answer
1 Should the new HVAC systems be Coastal Units (e.g. be designed for Coastal Environments operation)?
No. The RFQ does not require the new HVAC systems to be specifically designated or marketed as “coastal units.” However, all proposed equipment must be suitable for the project location and meet the applicable efficiency standards, Florida Building Code requirements, and local wind-load requirements identified in the Statement of Work.
2 The existing hvac systems has auxiliary heat kits installed to provide heating during winter months, an offer using heat pumps would be more cost effective and more energy efficient. Would an offer that use Heat Pumps be considered?
Yes. The Government will consider heat pump systems, provided the proposed systems meet the required capacities, fit within the existing configurations, are compatible with the existing electrical service and controls, and meet all applicable efficiency, code, and performance requirements. The quoter shall identify the proposed manufacturer, model number, capacity, efficiency rating, warranties, and any assumptions or required modifications in its quotation.
3 Is a Health and Safety / Accident Prevention Plan required for this project?
No. The RFQ does not require the contractor to submit a separate Health and Safety Plan or
Accident Prevention Plan. However, the contractor must comply with FAR 52.236-13, Accident Prevention, including applicable OSHA standards under 29 CFR Parts 1910 and
1926 and any additional safety measures determined necessary by the Contracting Officer.
4 Would Payroll records using WH-347 be required?
Yes. Certified payrolls are required for each week in which contract work is performed. The payroll information may be submitted in any format that contains the required information;
use of Optional Form WH-347 is permitted but not mandatory. Each payroll submission must include a signed Statement of Compliance.
5 Should the recovered refrigerant and old HVAC equipment be turned over to the facility support staff for disposal?
No. The contractor is responsible for properly recovering the refrigerant in accordance with
EPA Section 608 requirements and transporting all removed HVAC equipment and components off-site for lawful disposal. The recovered refrigerant and old equipment should not be turned over to facility support staff unless otherwise directed by the Contracting
Officer.