B08_Attachment_3_-_Question_and_Answers_0001.pdf
PDF 100 KB Posted
- Solicitation number
- 140L0626Q0009
About this file
This is a Questions and Answers document for RFQ 140L0626Q0009 MT Tomahawk Dam TI&II, addressing three inquiries from potential contractors.
The document clarifies the location and characteristics of the Tomahawk Detention Dam project in Montana. The dam is a dry detention facility designed to drain completely with no dead pool retention, extending from coordinates 48.07945, -106.87606 to 48.075619, -106.883914, with the Outlet Works Conduit located at 48.076951°, -106.881315°. The earliest anticipated construction start date is summer 2028, contingent upon project funding availability. This is identified as a brand-new requirement with no incumbent contractor or prior similar work by the customer.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L0626Q0009_Amd_0001.pdf | ||
| B08_Attahcment_2_-_SF330-21a_.pdf | ||
| B08_Attachment_1_-_Request_for_Qualifications_5-5-2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
140L0626Q0009 MT Tomahawk Dam TI&II
Attachment 3 – Questions and Answers
1. After inputting the latitude and longitude of the project (48.07945, -106.87606), Google
Earth is not leading me to a detention dam. Looking at Google Earth, it looks like a detention dam at 48.044086, -106.908019 is the location that fits the RFQ description.
Response: The Tomahawk Detention Dam is designed so that it does not retain a dead pool;
instead, all water drains completely from the reservoir area. The dam extends from coordinates 48.07945, -106.87606 to 48.075619, -106.883914. The Outlet Works Conduit is at 48.076951°, -106.881315°.
2. If known, when is this project expected to go to bid for contractors and what is the expected start date for construction?
Response: The earliest anticipated start date for construction is summer 2028; however, when work actually begins will ultimately depend on the availability of project funding.
3. Is there any incumbent/recompete or this is a brand-new project? If yes, could you please provide us with their award number or even if the customer bought similar services in the past.
Response: This is a brand-new requirement.