Attachment_3_Quote_Schedule.pdf
PDF 197 KB Posted
- Attached to
- UMRBNM Gas Well Bores P&A, MT
- Solicitation number
- 140L0626Q0002
About this file
This is a Quote Schedule for federal contract opportunity 140L0626Q0002 for Montana (MT) Ute Mountain Reservation (UMRBNM) Gas Well Bores Plug and Abandonment (P&A) work.
The solicitation requires contractors to provide a lump sum (LS) quote for 13 line items covering the complete plug and abandonment and site reclamation of six federal gas wells: Federal 1-12, Federal 22-28, Federal 29-15, Federal 30-1, Federal 34-1, and Federal 31-3. Item 0001 addresses mobilization and demobilization. For each well location, separate line items are provided for plug and abandonment work (items 0002, 0004, 0006, 0008, 0010, and 0012) and site reclamation and infrastructure removal (items 0003, 0005, 0007, 0009, 0011, and 0013). Plug and abandonment services shall include all labor, equipment, materials, cementing, bridge plugs, fluid handling, well control, cut-and-cap operations, well markers, and reporting required to permanently abandon wells per the Statement of Work. Site reclamation and infrastructure removal services shall encompass surface reclamation, site restoration, seeding, erosion control measures, access road reclamation, pit closure, infrastructure removal, waste disposal, fencing, culvert removal, waterbars, erosion control blankets, sagebrush planting, and all other reclamation requirements identified in the Statement of Work. The quote schedule requires contractors to enter pricing for each line item with a total price line provided for the complete scope.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item DESCRIPTION UNIT QTY AMOUNT
0001 Mobilization/Demobilization LS 1
0002 Plug and Abandon Federal 1-12 Well LS 1
0003 Federal 1-12 Site Reclamation and Infrastructure Removal LS 1
0004 Plug and Abandon Federal 22-28 Well LS 1
0005 Federal 22-28 Site Reclamation and Infrastructure Removal LS 1
0006 Plug and Abandon Federal 29-15 Well LS 1
0007 Federal 29-15 Site Reclamation and Infrastructure Removal LS 1
0008 Plug and Abandon Federal 30-1 Well LS 1
0009 Federal 30-1 Site Reclamation and Infrastructure Removal LS 1
0010 Plug and Abandon Federal 34-1 Well LS 1
0011 Federal 34-1 Site Reclamation and Infrastructure Removal LS 1
0012 Plug and Abandon Federal 31-3 Well LS 1
0013 Federal 31-3 Site Reclamation and Infrastructure Removal LS 1
140L0626Q0002 MT, UMRBNM Gas Well Bores P&A
Quote Schedule
NOTE: Site Reclamation and Infrastructure Removal Items shall include all surface reclamation, site restoration, seeding, erosion control measures, access road reclamation, pit closure, infrastructure removal, waste disposal, fencing, culvert removal, waterbars, erosion control blankets, sagebrush planting, and all other reclamation requirements identified in the Statement of Work for the applicable well location.
NOTE: Plug and Abandonment Items shall include all labor, equipment, materials, cementing, bridge plugs, fluid handling, well control, cut-and-cap operations, well markers, reporting, and all activities required to permanently plug and abandon the well in accordance with the Statement of Work.
TOTAL PRICE:
File details come from the government source that posted it. Updated .