Attachment_5_-_Limitations_on_Subcontracting_Breakout.xlsx
XLSX spreadsheet 91 KB Posted
- Attached to
- Imperial Dam Potable Water Tank Replacement, AZ Federal contract opportunity
- Solicitation number
- 140L0625B0006
About this file
The document is an Attachment for Limitations on Subcontracting Breakout for Solicitation Number 140L0625B0006, which concerns the Imperial Dam Potable Water Tank Replacement project in Arizona. The solicitation is a total small business set-aside with a 365-day performance period after notice to proceed, requiring 15% self-performance. The spreadsheet provides a template for tracking labor costs, subcontractor payments, and compliance with federal subcontracting limitations, with designated sections for small business and large business subcontractor labor costs. While the current spreadsheet shows $0.00 in all fields, it is designed to help contractors demonstrate adherence to subcontracting restrictions by calculating the percentage of work performed directly by the prime contractor versus subcontractors.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0625B0006_Amd_0003.pdf | ||
| Attachment_9_-_Sol_QA_140L0625B0006_Responses_2_0_0003.pdf | ||
| Sol_140L0625B0006_Amd_0002.pdf | ||
| Attachment_8_-_Sol_QA_140L0625B0006_0002.pdf | ||
| Attachment_7_-_SV_Sign-In_Sheet_0002.pdf | ||
| Sol_140L0625B0006_Amd_0001.pdf | ||
| Sol_140L0625B0006.pdf | ||
| Attachment_2_-_Specifications.pdf | ||
| Attachment_4_-_Price_Schedule.pdf | ||
| Attachment_6_-_SF1442_Instructions.pdf | ||
| Attachment_1_-_Maps.pdf | ||
| Attachment_3_-_DOL_Wage_Determination_Imperial_County__CA_CA2025002.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L0625B0006 - Imperial Dam Potable Water Tank Replacement, AZ |
| Type of Set Aside | Total Small Business |
| Performance Period | 365 Days After NTP |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .