Attch_9_A0002_DB_P2_Lim_on_Subcontracting_Breakout_0002.xlsx

XLSX spreadsheet 91 KB Posted

Attached to
DESIGN BUILD GARNET HILL TRAIL SYSTEMS
Solicitation number
140L0624R0034
Issued by

About this file

This document appears to be an Excel spreadsheet titled "Attch_9_A0002_DB_P2_Lim_on_Subcontracting_Breakout_0002.xlsx" that provides a breakdown of the limitations on subcontracting for a federal contract opportunity.

The related federal contract opportunity is for a Design-Build Garnet Hill Trail Systems project with Solicitation Number 140L0624R0034. It is a total small business set-aside with a 943-day period of performance and a 15% required self-performance. The spreadsheet provides a detailed breakdown of the total amount proposed, total material cost, self-performed labor, small business subcontractor labor, and large business subcontractor labor. The spreadsheet also calculates the limitation on subcontracting percentage, which must be greater than the required 15% self-performance. This document appears to be a template or worksheet used to track and report on compliance with the subcontracting limitations for this federal contract opportunity.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0624R0034 - Design-Build Garnet Hill Trail Systems
Type of Set AsideTotal Small Business
Performance Period943 Days After NTP
Required Self-Performance15%

(A) Total Amount Proposed*

(B) Total Material Cost

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost $0.00

(G) Limitation on Subcontracting Percentage*
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) = (B) + (F)
*Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage.

Sheet2

Services (except construction)
General construction
Construction by special trade contractors

File details come from the government source that posted it. Updated .