Attch_11_A0003_DB_P2_GH_Trail_Systems_Price_Schedule_-_REV_0003.pdf

PDF 249 KB Posted

Attached to
DESIGN BUILD GARNET HILL TRAIL SYSTEMS
Solicitation number
140L0624R0034
Issued by

About this file

This document is a Pricing Schedule for the Garnet Hill Recreation Area Trail Systems project. The project involves the design and construction of 60 miles of new non-motorized and motorized trail systems, as well as the repair of 10 miles of existing route network in the Garnet Hill Recreation Area in Ely, Nevada. The work includes cultural clearances, trail design, and all wayfinding signage.

The Pricing Schedule lists 8 line items for the project, including mobilization/demobilization, the non-motorized trail system, motorized trail system repairs, an OHV technical course, and construction of a new motorized trail system. The total contract value is not provided. This Pricing Schedule is associated with Solicitation Number 140L0624R0034, issued by the Department of the Interior Bureau of Land Management for the "Design Build Garnet Hill Recreation Area Trail Systems" project.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

PRICING SCHEDULE - REVISED

Estimator Date

Contract Number

Project Description

Item Spec. Bid No. Description Unit Quantity Unit Price Cost Amount

1 Mob/Demob LS 1.00

2 Garnet Hill TH Non-Motorized Trail System LS 1.00 3 Egan Crest Motorized Trail System - spot repair LS 1.00

4 Egan Crest Existng Route Network- spot repair LS 1.00

5 OHV Technical Course LS 1.00 6 New Motorized Trail System - Single Track and OHV LS 1.00

7 Cultural Class III Clearances LS 1.00

8 LS 1.00

$0.00TOTAL

Contract/Project Name

Garnet Hill Recreation Area Trail Systems Project Location

Ely, Nevada

Garnet Hill Recreation Area Trail Systems: Non- motorized and motorized trail systems. 60 miles new constructed trail (Machine built and Hand Crew built). 10 miles of existing route network repaired. All wayfinding singage. Includes Cultural Class II Clearances.

Trail Design

File details come from the government source that posted it. Updated .