Attach 8 - Amend 0002 Questions_Answers_0002.pdf
PDF 123 KB Posted
- Attached to
- NEIBER FIRE FENCES Federal contract opportunity
- Solicitation number
- 140L0621R0007
About this file
This document contains questions and answers related to amendment 0002 of solicitation number 140L0621R0007 for NEIBER FIRE FENCES issued by the Department of the Interior Bureau of Land Management National Office. The questions and answers provide clarification on fence components and installation methods. Specifically, gate closers will be required on approximately half of the gates along two-tracks and roads, but not on gates for the dozer line or facilitating livestock movement. Wire fence stays are not required. Corner panels will consist of a mix of three-post and five-post panels. The fence should be constructed entirely of steel, not wood. Equipment may be moved along the fence line as needed for removal and installation where possible.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0621R0007_Amd_0004.pdf | ||
| Attach_12_-_Amend_0004_Questions_Answers_0004.pdf | ||
| Attach_9_-_Amend_0003_140L0621R0007_Cont__Pages_REV_0003.pdf | ||
| Sol_140L0621R0007_Amd_0003.pdf | ||
| Attach_11_-_Amend_0003_Questions_Answers_0003.pdf | ||
| Attach_10_-_Amend_0003_Neiber_Fire_Fence_SOW_REV_0003.pdf | ||
| Sol_140L0621R0007_Amd_0002.pdf | ||
| Attach 7 - Amend 0002 140L0621R0007 Cont. Pages REV_0002.pdf | ||
| Sol_140L0621R0007_Amd_0001.pdf | ||
| Attach 6 - Amend 0001 Questions_Answers and Attendees List_0001.pdf | ||
| Attach 3 - NeiberFencesSiteVisit.pdf | ||
| Attach 2 - Neiber Fire Fences Plans.pdf | ||
| Attach 4 - Wage Determinations.pdf | ||
| Sol_140L0621R0007.pdf | ||
| Attach 5 - Pricing Worksheet.xlsx | XLSX spreadsheet | |
| Attach 1 - Neiber Fire Fences SOW.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEIBER FIRE FENCES
Solicitation No: 140L0621R0007 – Amendment 0002 Questions & Answers
Questions & Answers
1. Would gate closers be needed? Page 12 of the SOW it shows no closers, but the job calls for 60 gates.
Gate closers became a requirement on several of the gates. Gates on Two-Tracks or roads require gate closers (about half), the gates on the Dozer Line and to facilitate livestock movement do not.
2. Would fence stays be required? Page 8 of the SOW specifies no stays, but page 12 shows the spacing.
Wire Fence Stays are not required for this contract.
3. What type of corner panels would be utilized? 3 or 5 post?
Corner Panels - that will be a mix of three and five.
4. Page 10-line B of the SOW shows a wood post 4:1, is this correct or is the job all steel?
Fence should be all steel.
5. Will we be allowed to move equipment up the fence line for removal and installation?
Equipment can be moved along the fence line for removal and instillation where possible.