Q_As_0001.docx
DOCX document 15 KB Posted
- Attached to
- FUME HOOD & BIO SAFETY CABINET SERVICES
- Solicitation number
- 140G0126Q0252
About this file
This file is a Questions and Answers document addressing clarifications on contract requirements for fume hood and biosafety cabinet services at the National Fish Health Research Laboratory in Kearneysville, WV.
The Q&A clarifies key operational details: the four clean room air handlers are located on the roof above the second story, with the high-containment lab situated on the first floor. The contractor is responsible for identifying, obtaining, and supplying all pre-filters and HEPA filters of the correct size and type. For decontamination of the high-containment lab, the contractor must supply all equipment and chemicals needed; the chemical previously used was Chlorine Dioxide. The high-containment lab measures approximately 1,900 square feet with 12-foot ceilings (subject to contractor verification), though the cubic footage of the ducting supply is unknown. Available schematics have been provided to bidders, and contractors are expected to verify dimensions and specifications on-site. This document provides essential technical clarifications that bidders must incorporate into their quotations for the one-year service contract under solicitation 140G0126Q0252.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| High_containment_lab_schematics_0001.pdf | ||
| Sol_140G0126Q0252_Amd_0001.pdf | ||
| B03_Wage_Determination_2015-4285.pdf | ||
| Sol_140G0126Q0252.pdf | ||
| Instructions.docx | DOCX document | |
| A04_SOW_for_Fume_Hood_Certifications2_CO.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions Answers
| The four clean room air handlers, are these supply HEPA filters located in the ceiling above the lab, or are they actual air handlers located on the rooftop? |
| Air Handler is on the roof above the second story; High containment lab is on the first floor. |
| Would we be responsible for providing the pre-filters and HEPA filters needed for the service? |
| Contractor is responsible for Identifying and obtaining correct size and type. |
| Regarding the decontamination of the high-containment lab. How is the decontamination currently being handled? If it hasn’t been done yet, is there equipment already on-site that we would use, or would we need to provide the equipment ourselves. |
| Contractor is responsible for supplying equipment and chemicals needed for decontamination. No further information on the equipment used, the chemical used was Chlorine Dioxide. |
| Is it possible to get the layout and schematics of lab and Hepa filtration. |
| Available schematics are attached. The high containment lab is roughly 1900 sq feet with around 12-foot ceilings (contractor to verify). Cubic footage of the ducting supplying the space in unknown. |
File details come from the government source that posted it. Updated .