This is a Statement of Work (SOW) for fume hood and laboratory equipment certification services at the U.S. Geological Survey's Eastern Ecological Science Center in Kearneysville, West Virginia. The contractor must inspect, test, and supply materials for fourteen fume hoods, three snorkels, eleven biosafety cabinets, eleven laminar flow units, four test air flow (TAF) units, and four cleanroom air handler HEPA systems. Testing services include face velocity evaluation, sound measurement, containment monitoring, inflow and downflow velocity measurements, HEPA filter integrity testing, smoke pattern testing, site installation testing, and alarm calibration. The contractor must also decontaminate one biosafety cabinet and perform chlorine dioxide decontamination of the High Containment Lab Facility with exterior gas leak monitoring and biological indicator efficacy testing, with results delivered immediately upon completion and detailed reports within eight days. Supply materials include pre-filters (24x24x4), HEPA filters, HEPA bags, and pre-filter bags, with all materials to be disposed of in an environmentally friendly manner with recycling prioritized.
The contractor must obtain all required federal, state, and local permits prior to work commencement and provide all permitting documentation to the Facility Manager and Contracting Officer's Representative. Work must be scheduled within five days of notice to proceed and conducted during normal business hours (7:30 a.m. to 4:00 p.m., Monday through Friday) without weekend or holiday work unless written approval is obtained. The contractor must submit bid information including local area references (government references preferred), a detailed timeline with start and completion dates, and conduct a pre-construction meeting with the Facility Manager and COR. The contractor is responsible for all labor, materials, travel, and other costs; maintaining a daily employee log; obtaining West Virginia licensure; managing site storage and cleanliness; notifying the Facility Manager of any outages three days in advance; and removing all equipment and debris upon project completion. All work must comply with local, state, and federal environmental, safety, and OSHA regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q_As_0001.docx | DOCX document | |
| High_containment_lab_schematics_0001.pdf | ||
| Sol_140G0126Q0252_Amd_0001.pdf | ||
| Sol_140G0126Q0252.pdf | ||
| B03_Wage_Determination_2015-4285.pdf | ||
| Instructions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
1.0 INTRODUCTION
The EESC Leetown Science Center Fish Health Building has a need to inspect, test and supply material needed on fume hoods, snorkels, biosafety cabinets, laminar flow hoods and HEPA system.
2.0 BACKGROUND
The National Fish Health Research Laboratory and the Animal Health Team are part of the U.S. Geological Survey’s Eastern Ecological Science Center, located at 11649 Leetown Road, Kearneysville, WV 25430. Research conducted at this facility includes study of infectious and noninfectious diseases of fishes and other aquatic organisms. The facility also conducts research on invasive fish species with the intent of better understanding the adaptations these fish are applying in these new, nonnative habitats and developing ways to stop their spread and potentially eradicate them.
3.0 SCOPE
The scope of work includes but is not limited to:
· Test (14) fume hoods – test performed includes:
1. Evaluation of the face velocity
2. The sound
3. Containment, monitor performance and the tracking ability of a VAV
· Test (3) snorkels -
· Test (11) biosafety cabinets - test performed includes:
1.Inflow velocity measurements 2.Downflow velocity measurements 3.HEPA filter integrity testing 4.Smoke pattern testing 5.Site installation testing and alarm calibration
· Decontaminate 1 biosafety cabinet
· Decontaminate (Chlorine Dioxide) High Containment Lab Facility and associated HEPA Filtration system – to include
1. Exterior monitoring for potential gas leaks (multipoint set locations)
2. Efficacy testing using biological indicators (multipoint set locations)
3. Report of monitoring outcomes to be divered immediately up completion of decontamination.
4. Report on biological indicators (treatment efficacy) to be delivered within 8 post treatment (indicator incubation dependent)
· Test (11) laminar flow units – test performed includes:
1. HEPA filter integrity testing
2. Airflow velocity profile 3.Light testing
· TAF (4) test
· In-line HEPA test (single pass)
· Test cleanroom (4) air handler (HEPA air handler)
· Supply material: pre-filter 24x24x4, HEPA, HEPA bag and pre-filter bag
Contractor is to verify all units, filters, HEPA’s, bag sizes and connections.
All materials shall be disposed of in an environmentally friendly manner, recycling wherever possible.
The contractor shall submit costs for labor, materials, travel, and any other category that is part of the total cost as part of the bid.
Contractor shall not proceed with any work until all required submittals are approved by the Facility Manager (FM).
This project must be scheduled within 5 days of the notice to proceed.
4.0 APPLICABLE DOCUMENTS
5.0 TECHNICAL REQUIREMENTS
Contractor shall obtain all permits required by federal, state and local regulations prior to commencement of work. All required paperwork and calculations required to obtain any permits shall be provided to the and FM and the Contracting Officer’s Representative at time of submission as well as the permits themselves upon receipt of the documents from the permitting agencies.
Contractor must be licensed to work in the State of West Virginia.
6.0 DELIVERABLES
1) Bid information: One reference for work previously performed in the local area will be supplied. Government references are preferred.
2) Timeline: Work may not begin without the approval of the timeline by the FM. The project schedule shall be a chart which graphically depicts the proposed sequence to accomplish each work feature or operation. It shall show start dates and completion dates for each event on a horizontal time scale. The progress schedule time scale shall begin with the Notice to Proceed and indicate the number of days to completion. The schedule will be the reference to which the contractor’s progress and efforts are compared. Three paper copies or one soft copy shall be submitted to the FM.
IV. Other Requirements
Pre-Construction Meeting:
The contractor shall schedule and conduct a pre-construction meeting on-site with the FM and COR to review the requirements and conditions of this contract. The contractor shall have the project manager, field superintendent, and all subcontractors on site, or available by conference call, for the pre-construction meeting with Government officials prior to the commencement of work for this project.
Outages and Interruptions:
The contractor is advised that the Science Center will continue to perform research functions during the contract. Work shall be conducted as to minimize interruption to service. Contractor shall notify FM at least 3 days prior to any and all outages and interruptions. Contractor shall not proceed with work without approvals from the FM. Changes to the schedule require the submission of a new schedule to the FM for review.
Normal working hours for the construction work at the Science Center shall be 7:30am- 4:00pm, Monday - Friday. The contractor and sub-contractors (if required) shall not work Saturdays, Sundays, legal holidays, or non-normal working hours, unless otherwise authorized by the FM. Request to work other than the normal hours shall be made, and approved, in writing through the FM. Work performed during “other than the normal hours” shall not change the total cost to the government.
Changes/Clarifications:
All work must be completed as shown in the contract documents. If ‘no cost’ change orders are to be made, a written request to the COR must be made detailing why the work cannot be completed as shown, as well as the corrective action suggested by the contractor. For change orders which will alter the price or requirements of the contract, the FM and the COR’s approval must be given in writing before beginning the work described.
Disposal and Transporting of Debris and Material:
All materials and construction debris shall be removed from the work area and placed in an approved dumpster or removed from the site daily by the contractor.
Organization and storage of contractor(s) items at the site:
The FM shall designate areas where the contractor can store or place materials and equipment for short-term storage in preparation for installation. There is limited space on site for the storage of contractor equipment. There is no inside storage space available. Storage and security of materials and equipment as required for the performance of the contract requirements are the responsibility of the contractor. The contractor shall be responsible for making all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site. Upon completion of the contract, the contractor shall remove all equipment and excess materials, and shall restore the site to its original condition, as approved by the FM, at no additional cost to the government.
Site Cleanliness:
The contractor shall maintain the site free of construction debris outside of approved containers (dumpsters). The contractor shall provide dust protection and shall maintain cleanliness of the work site by promptly removing debris, tools, and excess material.
Contractor Parking, Security, and Smoking Regulations:
The contractor shall maintain a daily log of all contractor and subcontractor employees (date, name, arrival time, departure time) and provide a copy of the log to the FM at least weekly. The FM will designate a parking area (or areas) for the contractor to park vehicles. There shall be no smoking in any buildings at any time. All personnel that smoke will have to do so outside in designated smoking areas.
Environmental Protection:
The contractor and subcontractors shall perform all work and activities in accordance with local, state, and Federal environmental regulations.
Safety:
The contractor and subcontractors shall perform all work and activities in accordance with local, state, and Federal safety regulations, including OSHA, NEC, and USGS policy.
Notice to the Government of Delays:
In the event the contractor encounters difficulty in meeting performance requirements, or when it anticipates difficulty in complying with the contract delivery schedule or date, or whenever the contractor has knowledge that any actual or potential situation is delaying or threatens to delay the timely performance of this contract, the contractor shall immediately notify the COR and the FM in writing, giving pertinent details. This data shall be informational only in character. Notice under this provision shall not be construed as a waiver by the Government of any delivery schedule or date or any rights or remedies provided by law or under this contract.