This Performance Work Statement (PWS) details vegetation and infrastructure rehabilitation for the Border 2 Fire at the San Diego National Wildlife Refuge in Jamul, California. The project involves three primary services: 1) invasive weed treatment within a 500-foot buffer of the northern boundary, dozer lines, and habitat mitigation areas, with a minimum of two treatments across two fall growth events; 2) repair of exclusionary fencing along the lower Otay Lakes unit boundary, northeast boundary lines, habitat rehabilitation areas, and a maintenance access road, including signage installation; and 3) native seeding and erosion control within habitat rehabilitation areas.
The contractor will be responsible for providing all personnel, equipment, and materials needed to complete the work, including herbicides, fencing materials, and seeding supplies. Key requirements include treating specific invasive weed species to less than 1% cover, repairing fencing using 12-gauge galvanized smooth wire, installing 30 feet of fencing at mitigation area termini, and implementing native plant seeding with hydroseeding and hand seeding techniques. The project has a performance period from contract award to February 28, 2026, and emphasizes minimizing impacts to native plants, particularly the Quino checkerspot butterfly habitat and host plants. The work will be conducted in coastal sage scrub and chaparral habitats within the San Diego National Wildlife Refuge.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Vegetation and infrastructure rehabilitation for the Border 2 Fire San Diego National Wildlife Refuge, Jamul California
Part 1
General Information
GENERAL: This is a non-personal services contract to provide multiple services related to the rehabilitation of the Lower Otay Lake units of the San Diego National Wildlife Refuge (SDNWR), Jamul, California 91935 after damage from the Border 2 fire. Actions to implement shall include: 1) Invasive weed treatments within a buffer area of the northern boundary of the lower Otay Lakes unit, established dozer lines, and habitat rehabilitation mitigation areas; 2) Repair exclusionary fencing and install signage to prevent unauthorized access; 3) Native seeding and erosion control within habitat mitigation rehabilitation areas. The service provided by the Contractor will be to:
1) Treat invasive weed species that invade the burn area and that are adjacent to the burn, to prevent the area from converting from native habitat to an invasive weed species dominated area.
2) Repair exclusionary fencing in predetermined areas with signage installation along the border 2 fire footprint, dozer line intersections, habitat rehabilitation mitigation areas, and 1418 maintenance access road.
3) Replant native vegetation by way of hydroseed and hand seeding and implement erosion control within habitat rehabilitation mitigation areas.
The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform invasive weed treatments within and adjacent to the burned area, fencing repair and replacement, and seeding activities as defined in this Performance Work Statement except for those items specified as government furnished property and services. All water needed to facilitate any action as described will be sourced and provided by the contractor. The contractor shall meet the standards in this contract.
1.2 Background: The Sage Fire started on January 23, 2025 on BLM property within the Otay Mountain Wilderness on Otay Mountain in San Diego, CA. Due to excessive red flag conditions, including a concurrent Santa Ana wind event, the fire continued to spread north and northwest through contiguous coastal sage scrub and Chamise Chaparral habitat. Adjacent to the BLM parcel where initiation happened, the fire spread and burned 346-acres of a parcel of the San Diego National Wildlife Refuge, referred to as the lower Otay Lakes unit. Within the burn area, a previously rehabilitated habitat mitigation area was burned, rendering the rehabilitation ineffective and in need of replacement. As a means of emergency fire suppression, CAL-FIRE destroyed fencing in specific areas to use industry standard dozers to create artificial firebreaks to prevent further spread of the fire.
The entire fire and suppression efforts occurred within coastal sage and chaparral habitats that support multiple endangered and threatened species, which included designated critical habitat for the Federally Endangered Quino checkerspot (Euphydryas editha quino) and Federally Threatened coastal California gnatcatcher (Polioptila californica californica). The California gnatcatcher, Quino checkerspot butterfly and it’s host plant dot seed plantain (Plantago erecta) was also recorded in the area during surveys in 2022 for an unrelated project. No direct mortality or injury to any threatened or endangered species was observed in the fire area. A small team of USFWS Refuge, Ecological Services, and Fire Management staff reviewed the fire and suppression activity impacts and conducted a post-fire assessment of values at risk, and recommended actions to protect or restore those values, including reducing risk of invasive plant spread in burned areas and recovery of native vegetation and wildlife habitats.
1.3 Objectives:
https://en.wikipedia.org/wiki/Quino_Checkerspot
1. Locate and treat weed species within a buffer of the SDNWR’s northern parcel boundary of the lower Otay Lakes unit which includes a subset of the burned area occurring on SDNWR and adjacent properties. Additional treatment areas include areas within dozer lines on SDNWR and all habitat mitigation areas (See figures 1, 4, & 5). The contractor shall implement a minimum of 2 visits to maximize eradication. All measures will be taken to avoid recovering native plants.
Treat weeds using a variety of equipment and methods as appropriate for maximum control.
Achieve target weed reduction goals outlined below with the objective of allowing native species to recover from burn effects and minimize the negative impact of non-native weeds on that recovery.
2. Locate and repair exclusionary fencing along the lower Otay Lakes unit boundary, northeast boundary lines, termini for all habitat rehabilitation mitigation areas, and the 1418 maintenance access road to reduce unauthorized use of the refuge and adjacent land management parcels (See Figures 2-5). Signage will be installed at regular intervals to provide effective notice of boundary access regulations.
3. Perform vegetation rehabilitation by seeding with native plants to restore a native dominated vegetation community within previously rehabilitated habitat mitigation areas (See Figure 4-5).
Additionally, implement erosion control measures in previously mitigated areas to reduce downslope sedimentation.
1.4 Scope: The contractor shall provide all personnel, equipment and supplies to:
1. Spot treat infestation of invasive weeds in and adjacent to the burn area. The contractor shall accomplish eradication of weed species crimson fountain grass, Bermuda buttercup, stinknet, fennel, stinkwort, black mustard, castor bean, Russian thistle, and any novel invasive weeds that may invade the area during the period of performance; no more than 1% cover of a 500-foot buffer from the northern boundary of the SDNWR parcel, all dozer lines on SDNWR, and habitat mitigation areas will support these species. To the extent possible, other non-native invasive species (e.g., redstem fillaree (Erodium cicutarium), wild oat (Avena barbata)) will be treated to reduce their cover to no more than 20% within the same areas. This percentage of cover is higher due to the high prevalence of these and other non-native grass and forb species in the area. The contractor shall provide the services for two fall/winter growth periods. Adjacent lands to the northern boundary of the burn area are managed by partner land management agencies/entities and invasive species mitigation work will be performed according to the specifications above with appropriate access permission. All dozer lines to be treated are completely within the SDNWR boundary.
2. Locate and repair exclusionary fencing along the lower otay lakes unit of the SDNWR boundary, northeast boundary lines, termini for all habitat rehabilitation mitigation areas, and the 1418 maintenance access road using 2 strand smooth wire and T-posts. Any clearing of vegetation needed will be performed by the contractor to prepare an appropriate work location. All non-native vegetation and seeds cleared from the site will be disposed of at an approved green waste disposal facility.
3. The contractor shall implement vegetation rehabilitation using a combination of hydroseeding and hand seeding to achieve desired native species composition. The contractor shall install erosion control measures according to specifications as stated below in Section 5.
1.5 Period of Performance: The period of performance of the from Contract award/ Notice to Proceed to 2/28/2026.
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.2 Quality Assurance: The government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays:
New Year’s Day Labor Day Martin Luther King Jr. Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Juneteenth Day Christmas Day Independence Day
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 7:30 AM and 5:00PM Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at the San Diego National Wildlife Refuge, Border 2 fire burn area, south of Otay Lakes Road approximately 4.5 miles east of Eastlake and 3.6 miles west of Campo Road, Jamul, CA 91935. See Figure 1.
1.6.6 Type of Contract: The government will award a firm fixed price BPA Call or Purchase order.
1.6.7 Security Requirements: Not Applicable.
1.6.7.1 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities especially gates, equipment, and materials shall be secured.
1.6.7.2 Key Control. The contractor will be issued a key to the shared access gate providing access through partner lands to the refuge or will be allowed to put a lock on the gate to facilitate their access. Lock must be removed at the end of the contract.
1.6.7.3 Lock Combinations. The contractor shall establish and implement methods of ensuring that all lock combinations are not revealed to unauthorized persons. The contractor shall ensure that lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. These procedures shall be included in the contractor’s Quality Control Plan.
1.6.8 Special Qualifications: Contractor and crews must have experience in controlling by mechanical and chemical methods a suite of invasive non-native plants, including those described above, in a Southern California coastal sage scrub and chaparral site containing federally listed threatened and endangered or other sensitive species that must be avoided. Contractor must provide documentation of past experience in such a project. Contractor or key personnel must also possess a valid California pesticide applicators certificate or license.
1.6.9 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor’s performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10 Contracting Officer Representative (COR): The COR will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor contractor’s performance and notifies both the Contracting Officer and contractor of any deficiencies;
coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: Refuge Manager, Acting Project Leader, Deputy Project Leader (if applicable), and Fire Management Officer. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 AM and 4:30 PM, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for key personnel field personnel are listed in Section are listed in 1.6.8 Special Qualifications.
1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
1.6.13 Contractor Travel: Not Applicable.
1.6.14 Other Direct Costs: Not Applicable.
1.6.15 Data Rights: Not Applicable.
1.6.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may effect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.17 Phase In/Phase Out Period: Not Applicable.
PART 2
DEFINITIONS & ACRONYMS
2. DEFINITIONS AND ACRONYMS:
2.1. DEFINITIONS:
2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.
2.2. ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1. Services: The Government will provide access to the work site, including a key for the access gate.
COR, Refuge or Fire staff will orient the contractor with a site visit prior to work starting.
3.2 Facilities: Not Applicable.
3.3 Utilities: Not Applicable.
3.4 Equipment: Not Applicable.
3.5 Materials: The Government will provide signage to install on fencing repair sites.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
4.1 General: The Contractor shall furnish all personnel, supplies, materials, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Secret Facility Clearance: Not Applicable.
4.3. Materials: Contractor shall supply all materials needed to complete the invasive weed treatments, fencing, and seeding responsibilities including herbicides, herbicide additives, and water for mixing or watering seedlings. There is no electrical or water on-site.
4.4. Equipment: The Contractor shall provide all equipment necessary to complete the treatments, including, but not limited to, herbicide application equipment, personal protective equipment, spill kits, hand and mechanical tools, trash bags for disposing of cut seed heads, trash removal, worker restroom.
4.5 Minimization of impacts to extant habitat: Contractor must be aware of Quino checkerspot host plant, dot-seed plantain, and native plants recovering from the effects of the fire and minimize weed treatment and trampling impacts to those species.
PART 5
SPECIFIC TASKS
5. Specific Tasks:
Basic Services: Invasive treatment
5.1. The contractor shall provide services for treatment of invasive non-native weed species up to a 500-foot buffer (110 acres) from the northern boundary of the lower Otay Lakes parcel of the SDNWR and adjacent properties. Additionally, the contractor shall implement the same treatment within all dozer lines (10 acres) and habitat rehabilitation mitigation areas (2.1 acres) on SDNWR.
Specific Services: Invasive treatment
5.1.1. The contractor shall locate and treat weed species; on a 500 foot buffer from the SDNWR’s northern parcel boundary which includes a subset of the burned area occurring on SDNWR and adjacent properties,;
within all dozer line footprints,; and habitat rehabilitation mitigation areas on SDNWR. A minimum of 2 invasive weed treatments will be required across two fall growth events. Treat weeds using a variety of equipment and methods as appropriate for maximum control. Use herbicides only in strict compliance with manufacturer’s label and state and federal regulations. Areas closer than 25 feet of waterways may only be manually or mechanically treated. Record treatments and herbicide application with a corresponding report, delineated by land management area. Monitor treatment effectiveness and report.
5.1.1.a The contractor shall treat invasive weeds using a variety of equipment and methods including manual, mechanical or chemical means as appropriate. For any herbicide treatments, herbicide storage, transportation, application and disposal will be conducted in strict accordance with manufacturer’s label directions, tribal and federal regulations, and NEPA compliance documents. Certified herbicide applicators will determine the appropriate chemical to use for the species of invasive weed treatment, in consultation with Contracting Officer (CO), Contracting Officer’s Representative (COR) and/or Refuge staff and in compliance with the Pesticide Use Proposal (PUPS). Herbicide applications will only be made by qualified applicators. All applications must be documented and reported according to state and federal guidelines with applications delineated by appropriate land management agency lands.
5.1.1.b The contractor shall be aware of areas along streams or near known cultural resource sites where herbicide will not be applied and treat manually or mechanically according to best management practices.
5.1.1.c The contractor shall apply control treatments prior to seed-set. Any mature seed heads shall be collected and bagged for disposal.
5.1.2 The contractor shall record treated areas by GPS. Maintain location, species, extent of infestation, treatment used, amount of chemical applied, area applied to, and detection and treatment dates in a GIS database and provide to Refuge staff for PUPS data reporting needs.
5.1.3. The contractor shall monitor treatment efficacy to ensure treatment success as measured by invasive weed population decline and report results including photo documentation to COR.
Basic Services: Fencing repair and signage installation
5.2. The contractor shall provide services for location and repair of fencing with signage installation along the lower otay lakes northern boundary, northeast boundary lines, termini for all habitat rehabilitation mitigation areas, and the 1418 maintenance access road.
Specific Services:
5.2.1. The contractor shall locate all areas of broken fencing and t-posts along the entirety of the northern boundary of the lower otay lakes unit, northeast boundary lines, and termini for habitat rehabilitated mitigation areas (approx. 5,300 feet). and fix subset of fencing with partial damage or replace fencing in areas where fencing is no longer present.
5.2.1.a. The contractor shall clear all vegetation to facilitate fencing repair. If species is non-native, all cut vegetation and seed heads shall be disposed of at an approved green waste disposal facility.
5.2.1.b. The contractor shall install a minimum of 30 feet of fencing across the termini of each end of all habitat rehabilitation mitigation areas, consistent with existing fencing in place.
5.2.1.c. All fencing shall be repaired or constructed to prevent unauthorized access to the refuge or within habitat rehabilitation mitigation areas. Fencing shall be logically connected to existing vegetation in the environment to minimize traffic around installed fencing.
5.2.1.d. The contractor shall source and use 12-gauge galvanized smooth fencing wire for all fencing repair or replacement with 4 levels of fencing between all posts.
5.2.2. The contractor shall locate all areas of broken rope fencing and eyelet style posts along the entirety of the 1418 firebreak maintenance access road (approx. 5,000 feet) and replace as needed.
5.2.2.a. The contractor shall source and use high visibility polypropylene rope with eyelet style metal posts spaced every 30 feet along each side of the road, consistent with existing fencing in place.
5.2.2.b. The contractor shall replace all rope fencing and eyelet style posts with any visible damage present.
5.2.2.c. The contractor shall only perform this specific service outside the established SDNWR hunting season, unless otherwise directed by SDNWR staff, due to safety concerns.
5.2.3. The contractor shall remove all fencing and posts materials of any kind if damaged and replaced with new materials.
5.2.4. The contractor shall install government supplied signage on fencing at intervals determined in the field with the refuge.
Basic Services: Seeding and erosion control
5.3 The contractor shall implement seeding to maintain a native dominated vegetation community.
Additionally, the contractor shall implement erosion control measures within the same area(s) to reduce downslope sedimentation.
Specific Services: Seeding and erosion control
5.3.1. The contractor shall use heavy equipment with a scarifier attachment to de-compact the habitat rehabilitation mitigation areas in heavy equipment accessible areas. In inaccessible areas, the contractor shall use hand tools to achieve the same desired effect.
5.3.1.a. Equipment will stay within the habitat rehabilitation mitigation area footprints to the extent possible.
5.3.1.b. Soil will be de-compacted from the bottom road terminus and the top road terminus to points where the road in no longer visible or approximately 100 ft from the terminus.
5.3.1.c. The broken soil surface will be roughly raked and graded to improve the surface to accept seed.
5.3.2. The contractor shall seed the prepared areas with hydroseed where accessible with truck mounted equipment, and broadcast seed via handled methods in inaccessible areas.
5.3.2.a. All seeding shall be completed no later than November 15, 2025.
5.3.2.b. The contractor shall implement non-native invasive control within the seeding area before seeding is implemented and an invasive control application 2 weeks post last watering event.
5.3.2.c. Non-native invasive control will include herbicide application and/or physical removal in all areas.
5.3.2.d. Seed for species that occur commonly, as determined by the Refuge Manager, throughout the restoration areas and adjacent areas will be applied via hydroseed.
5.3.2.e. Seed for host and nectar plant species, as determined by the Refuge Manager, and/or those that occur only in specific areas will be applied manually.
5.3.2.f. Manual application of host and nectar plant seed will be conducted immediately prior to (within 24 hours) hydraulic seed application.
5.3.2.g. Recommended application quantity is 40 pounds per acre of seed.
5.3.2.h. The contractor shall water seeded areas a minimum of 2 times per month post seeding until January 10, 2026 to facilitate germination.
5.3.2.i. The contractor may water seeded areas with truck mounted equipment in accessible areas and shall hand water seeded areas in inaccessible areas.
5.3.3. The contractor shall install straw waddles as determined necessary to control water runoff and prevent soil erosion for the mitigation areas, consistent with previously applied straw waddles.
5.3.3.a. The contractor shall source straw waddles that are 100% weed free and possess no plastic materials.
PART 6
APPLICABLE PUBLICATIONS
6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
6.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures related to the application of pesticides/herbicides on weed species in California.
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1. Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
TECHNICAL EXHIBIT 1
Performance Requirements Summary The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objective (The Service required—usually a shall statement)
Standard Performance Threshold (This is the maximum error rate. It could possibly be “Zero deviation from standard”)
Method of Surveillance
Invasive treatment
PRS # 1.
The contractor shall locate and treat invasive weed infestations over a minimum of 2 separate treatments (2 fall treatments) within a 500-foot buffer (110 acres) from the SDNWR’s lower Otay Lakes northern parcel boundary, within entire footprint of dozer lines (10 acres) contained within SDNWR’s boundary, and habitat rehabilitation mitigation areas (2.1 acres).
The Contractor provided service should meet industry standard practices.
No deviation from standard. 100 Percent Inspection
PRS # 2
The contractor shall treat invasive weed using a variety of equipment and methods including manual, mechanical or chemical means as appropriate, in strict accordance with manufacturer’s label directions, tribal and federal regulations, and NEPA compliance documents. Certified herbicide applicators will determine the appropriate chemicals in consultation with Contracting Officer (CO), Contracting Officer’s Representative (COR) and/or Refuge staff and in compliance with the PUPS. Herbicide applications will only be made by qualified applicators according to the label and following state and federal regulations. All applications must be documented and reported according to state and federal guidelines.
The Contractor provided service should meet herbicide application for habitat restoration per industry standard practices.
Mortality of at least 99% of non-native weeds within 2 weeks of herbicide application and living non-native weeds be less than 1% of total plant cover in the 500-foot buffer from the lower Otay Lakes northern parcel boundary, within all dozer lines, and habitat rehabilitation mitigation areas. The non-native species of concern include crimson fountaingrass (Pennisetum setaceum), fennel (Foeniculum vulgare), stinkwort (Dittrichia graveolens), black mustard (Brassica nigra), castor bean (Ricinus communis), Russian thistle (Salsola sp.), Bermuda buttercup (Oxalis pes-caprae), stinknet (Oncosiphon pilulifer). To the extent possible, other non-native invasive species (e.g., redstem fillaree (Erodium cicutarium), wild oat (Avena barbata)) will be treated to reduce their cover to no more than 20% within the same areas.
100 Percent Inspection
PRS # 3
The contractor shall avoid areas along streams or near known cultural resource sites for herbicide application but will manually or mechanically treat.
according to best management practices.
The Contractor provided service should meet herbicide application for habitat restoration per industry standard practices.
No deviation from standard. 100 Percent Inspection
PRS # 4
The contractor shall apply control treatments prior to seed-set. Any mature seed heads shall be collected and bagged for disposal.
The Contractor provided service should meet industry standard practices.
No deviation from standard. 100 Percent Inspection
PRS # 5
The contractor shall record treated areas by GPS. Other data collected shall include location, species, extent of infestation, treatment used, amount of chemical applied, area applied to as delineated by land management agency, and detection and treatment dates in a GIS database and provide to Refuge staff for PUPS data reporting needs.
The Contractor provided service should meet industry standard practices.
No deviation from standard.
100 Percent
PRS # 6
The contractor shall monitor treatment efficacy to ensure treatment success as measured by invasive weed population decline and report results including photo documentation to COR.
The Contractor provided service should meet industry standard practices.
No deviation from standard. 100 Percent Inspection
Fencing repair and signage installatio n
PRS # 1
The contractor shall locate all areas of broken smooth strand metal fencing and t-posts along the entirety of the northern boundary of the lower otay lakes unit, northeast boundary lines, and termini for habitat rehabilitation mitigation areas (approx. 5,300 feet). and fix subset of fencing with partial damage or replace fencing in areas where fencing is no longer present. The contractor shall install a minimum of 30 feet of fencing across the termini of each end of all habitat rehabilitation mitigation areas, consistent with existing fencing in place.
The contractor shall source and use 12-gauge galvanized smooth fencing wire for all fencing repair or replacement with 4 levels of fencing between all posts.
The Contractor provided service should meet industry standard practices. Location and alignment of fencing shall be determined in coordination with COR and/or Refuge Manager.
No deviation from standard.
100 Percent Inspection
PRS # 2
The contractor shall clear all vegetation to facilitate fencing repair. If species is non-native, all cut vegetation and seed heads shall be disposed of at an approved green waste disposal facility.
The Contractor provided service should meet industry standard practices. No deviation from standard.
100 Percent Inspection
PRS # 3
All smooth strand metal fencing shall be repaired or constructed to prevent unauthorized access to the refuge or within habitat rehabilitation mitigation areas. Fencing shall be logically connected to existing vegetation in the environment to minimize traffic around installed fencing.
The Contractor provided service should meet industry standard practices. No deviation from standard.
PRS # 4
The contractor shall locate all areas of broken rope fencing and eyelet style posts along the entirety of the 1418 firebreak maintenance access road (approx. 5,000 feet) and replace as needed.
The contractor shall source and use high visibility polypropylene rope with eyelet style metal posts spaced every 30 feet along each side of the road, consistent with existing fencing in place.
The contractor shall replace all rope fencing and eyelet style posts with any visible damage present.
The Contractor provided service should meet industry standard practices. Location and alignment of fencing shall be determined in coordination with COR and/or Refuge Manager.
No deviation from standard.
100 Percent Inspection
PRS # 5
The contractor shall remove all fencing and posts materials of any kind if damaged and replaced with new materials.
The Contractor provided service should meet industry standard practices. No deviation from standard.
100 Percent Inspection
PRS # 6
The contractor shall install government supplied signage on fencing at intervals determined in the field with the refuge.
The Contractor provided service should meet industry standard practices. Location and interval frequency of signage installation shall be determined in coordination with COR and/or Refuge manager.
No deviation from standard.
100 Percent Inspection
Seeding and erosion control
PRS # 1
The contractor shall implement seeding to maintain a native dominated vegetation community. Additionally, the contractor shall implement erosion control measures within the same area(s) to reduce downslope sedimentation.
The contractor shall use heavy equipment with a scarifier attachment to de-compact the habitat rehabilitation mitigation areas in heavy equipment accessible areas. In inaccessible areas, the contractor shall use hand tools to achieve the same desired effect.
The contractor shall keep equipment within the habitat rehabilitation mitigation area footprint to the extent possible.
The Contractor provided service should meet industry standard practices. No deviation from standard.
PRS # 2
Soil will be de-compacted from the bottom road terminus and the top road terminus to points where the road in no longer visible or approximately 100 ft from the terminus.
The broken soil surface will be roughly raked and graded to improve the surface to accept seed
The Contractor provided service should meet industry standard practices. No deviation from standard.
100 Percent Inspection
PRS # 3
The contractor shall seed the prepared areas with hydroseed where accessible with truck mounted equipment, and broadcast seed via handled methods in inaccessible areas.
The contractor shall water seeded areas a minimum of 2 times per month post seeding up to January 10, 2026 to facilitate germination.
The Contractor provided service should meet industry standard practices. Planted area can have no more than 25% of area without successful native plant germination 2 months post seeding application.
100 Percent Inspection
PRS # 4
The contractor shall implement non-native invasive control within the seeding area before seeding is implemented and an invasive control application 2 weeks post last watering event.
The Contractor provided service should meet herbicide application for habitat restoration per industry standard practices.
Mortality of at least 99% of non-native weeds within 2 weeks of herbicide application and living non-native weeds be less than 1% of total plant cover in the habitat rehabilitation mitigation areas. The non-native species of concern include crimson fountaingrass (Pennisetum setaceum), fennel (Foeniculum vulgare), stinkwort (Dittrichia graveolens), black mustard (Brassica nigra), castor bean (Ricinus communis), Russian thistle (Salsola sp.), Bermuda buttercup (Oxalis pes-caprae), stinknet (Oncosiphon pilulifer). To the extent possible, other non-native invasive species (e.g., redstem fillaree (Erodium cicutarium), wild oat (Avena barbata)) will be treated to reduce their cover to no more than 20% within the same area.
100 Percent Inspection
PRS # 5
The contractor shall perform manual application of host and nectar plant seed immediately prior to (within 24 hours) hydraulic seed application.
The Contractor provided service should meet industry standard practices. No deviation from standard.
PRS # 6
The contractor shall install straw waddles as determined necessary to control water runoff and prevent soil erosion for the mitigation areas, consistent with previously applied straw waddles.
The contractor shall source straw waddles that are 100% weed free and possess no plastic materials.
The Contractor provided service should meet industry standard practices. No deviation from standard.
Figure 1. Border 2 fire footprint within SDNWR lands with dozer and buffer area for proposed weed management.
Figure 2. Boundary to locate and repair or replace damaged subsets of fencing sections on the SDNWR.
Figure 3. 1418 maintenance access road to locate and repair or replace damaged subsets of high visibility rope fencing and eyelet style posts.
Figure 4. Northern habitat rehabilitation mitigation areas needing fencing, seeding, and erosion repairs on the SDNWR Border 2 fire area.
Figure 5. Southern habitat rehabilitation mitigation areas needing fencing, seeding, and erosion repairs on the SDNWR Border 2 fire area.
Figure 6: Fence closure at termini of habitat rehabilitation mitigation area.
| PERFORMANCE WORK STATEMENT (PWS) |
| Vegetation and infrastructure rehabilitation for the Border 2 Fire San Diego National Wildlife Refuge, Jamul California |
| 2. DEFINITIONS AND ACRONYMS: |
| 3. GOVERNMENT FURNISHED ITEMS AND SERVICES: |
| 4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES: |
| 5. Specific Tasks: |
| Specific Services: Invasive treatment |
| Basic Services: Fencing repair and signage installation |
| Specific Services: |
| Basic Services: Seeding and erosion control |
| Specific Services: Seeding and erosion control |
| 6. APPLICABLE PUBLICATIONS (CURRENT EDITIONS) |
| TECHNICAL EXHIBIT 1 |
| Performance Requirements Summary |
File details come from the government source that posted it. Updated .