AMENDMENT_0003_ADD_TO_SOW_3_12_2025_0003.docx

DOCX document 55 KB Posted

Attached to
FL WELAKA NFH ROAD BASE MATERIAL FOR HATCHERYROADS Federal contract opportunity
Solicitation number
140FS325Q0047
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This document is an Amendment (003) to a Statement of Work (SOW) for road repairs at the Welaka National Fish Hatchery in Crescent City, Florida. The amendment provides additional specifications for road surface preparation, requiring the entire road to be scarified and built up to a uniform height, with the road crown positioned 3 inches above the shoulders and maintaining a 10-foot width. The solicitation (140FS325Q0047) is for FDOT-certified lime rock road base material, with quotes due on March 28, 2025, at 3:00 PM. The project is being conducted by the U.S. Fish & Wildlife Service, Department of the Interior, for road infrastructure improvements at the Welaka National Fish Hatchery located at 1011 County Road 309.

View the file

Other files for this federal contract opportunity

Other files attached to FL WELAKA NFH ROAD BASE MATERIAL FOR HATCHERYROADS, newest first.
File Type Posted
Sol_140FS325Q0047_Amd_0003.pdf PDF
Sol_140FS325Q0047_Amd_0002.pdf PDF
Sol_140FS325Q0047_Amd_0001.pdf PDF
Sol_140FS325Q0047.pdf PDF
Attachment_3-_Past_Performance_Data_Document.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNITED STATES DEPARTMENT OF THE INTERIOR

U.S. FISH & WILDLIFE SERVICE

Scope of Work for Delivery of FDOT-Certified Lime Rock Road Base for Welaka NFH Road Repairs

Welaka National Fish Hatchery 1011 County Road 309 Crescent City, FL 32112

3/11/2025 AMENDMENT 003 – SOW ADDITIONAL INFORMATION

Additional Information:

The entire road surface will need to be prepped with a scarifire and then entire road be built up to a uniform height with the top of the crown of the road being 3 inches above the shoulders with the road being 10 feet wide.

The quote due date remains unchanged – Quotes are due March 28, 2025 @ 3:00pm.

image1.emf

File details come from the government source that posted it. Updated .