This is a Questions and Responses document for RFI 140FS126Q0050, addressing clarifications on commissioning agent qualifications, site staffing, calibration procedures, and contractor responsibilities for a retro-commissioning project.

The document clarifies four key areas relevant to contract performance. For lead commissioning agent qualifications, acceptable alternatives include: 25+ years of HVAC/BAS background; at least 5 years of hands-on maintenance/repair experience (documented); a BS/MS in Mechanical Engineering combined with at least 5 years of experience; or at least 5 years of significant commissioning experience. Regarding site conditions, no controls technician will be available onsite, though O&M staff possess login credentials for Metasys alarm configuration and trend log access. For calibration methodology, thermistors utilize non-linear lookup tables and do not require slope/intercept calibration; instead, readings must be verified to fall within acceptable error bands with offset adjustments as needed. RTDs and linear transmitters may use slope/intercept calibration where applicable, such as for heating water or outside air sensors. Finally, the contractor is required only to complete retro-commissioning checklists during necessary site visits and is explicitly not required to perform general maintenance tasks beyond those essential for contract completion.

View the file

Other files

File Type Posted
Sol_140FS126Q0050_Amd_0002.pdf PDF
Sol_140FS126Q0050_Amd_0001.pdf PDF
B08_-_140FS126Q0050_Full_Solicitation_Package.pdf PDF
Sol_140FS126Q0050.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140FS126Q0050 - RFI

Questions & Responses

RFI 1.Please confirm an acceptable alternative for the lead commissioning agent qualifications (experience, education, commissioning background). ANSWER:

A. 25+ years HVAC/BAS background: YES.

B. Hands-on maintenance/repair experience: DOCUMENT AT LEAST 5 YEARS OF

EXPERIENCE.

C. BS/MS in Mechanical Engineering: YES, IN ADDITION TO AT LEAST 5 YEARS

EXPERIENCE.

D. Significant commissioning experience: "SIGNIFICANT" SHALL MEAN AT LEAST 5

YEARS EXPERIENCE.

RFI 2. Will a controls technician be available onsite, and does the O&M staff have a login for Metasys configuration and trending? ANSWER:

There is no controls technician available at the project site. Staff has a log-in that allows configuration of alarms and trend logs.

RFI 3. Clarify the RFP requirement for 2-point calibration and whether slope/intercept is applicable for thermistors. ANSWER:

Thermistors use non-linear lookup tables, so slope/intercept calibration is not meaningful; verify readings fall within acceptable error band and adjust offset if needed. Rtds or linear transmitters may use slope/intercept where applicable (e.g., heating water or outside air).

RFI 4. Clarify whether the contractor is required to perform maintenance tasks in addition to retro-commissioning checklists. ANSWER:

Item 8.2 refers to necessary site visits for contract completion. It is NOT intended to require general maintenance. Retro-commissioning checklists are expected; performing maintenance tasks is NOT.

RFI 2. Will a controls technician be available onsite, and does the O&M staff have a login for Metasys configuration and trending? ANSWER:
RFI 3. Clarify the RFP requirement for 2-point calibration and whether slope/intercept is applicable for thermistors. ANSWER:
RFI 4. Clarify whether the contractor is required to perform maintenance tasks in addition to retro-commissioning checklists. ANSWER: