This is a Request for Information (RFI) Questions and Answers document for a caribou sculpture installation project at Tetlin National Wildlife Refuge in Tok, Alaska, managed by the U.S. Fish and Wildlife Service (USFWS).
The contractor is responsible for providing all labor to install the sculptures and perform related touchup work, including welding antlers onto the sculptures. The contractor must provide their own welding equipment and bronze finishing materials. The Government will provide the hoist/lift, straps for lifting, ladders, and power and hand tools. Payment will be structured as firm fixed line items reflecting major project milestones: Display Sketches (00010), Sculpture Model (00011), Wax Model (00012), Bronze Casting (00013), and Site Installation (00014). This is a brand-new contract with no incumbent. Design phase deliverables including initial sketches and clay maquette photos should be submitted electronically as email attachments to USFWS Alaska Region and Tetlin National Wildlife Refuge for review and approval. The contractor must furnish a detailed diagram of the sculpture base including exact dimensions, anchoring/bolt pattern specifications, and clearance requirements; the refuge will prepare the concrete pad based on these specifications. The contractor is not responsible for pouring the concrete pad. A summer-time photo of the installation location has been provided, with additional close-up images to be sent once snow melts. The revised delivery date is October 1, 2027.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI Questions and Answers
1. Installation Responsibilities Please confirm whether the Government will furnish and bear the cost of all materials and equipment required for installation at the site. Additionally, clarify if the contractor’s responsibility is limited to installation labor and related workmanship, or if the Government also intends to provide labor for the installation.
If Government labor will be provided, please specify which party will be responsible for the associated labor costs.
The vendor will have to provide the labor to install the sculptures and related "touchup work" (i.e., welding the antler on the sculptures). The vendor will be responsible for securing their preferred welding equipment and operating it, as well as the bronze finishing compounds or materials that they may need during the installation. The government will provide the following equipment for installation:
o Hoist/lift, which will be used to place the sculptures onto the foundation.
o Staps for lifting sculpture o Ladders to be used to access the sculpture o Power tools, hand tools, etc…
2. Payment Terms and Progress Payments Does the Government intend to incorporate a schedule of values that would allow for payments tied to major project milestones, such as:
Firm Fixed Line items will reflect major milestones as follows:
00010 Caribou Sculptures Display Sketches
00011 Caribou Sculpture Model
00012 Caribou Sculpture Wax Model
00013 Caribou Sculpture Bronze Casting
00014 Caribou Sculptures Site Installation
3. Contract History Is this a brand-new contract, or is there (or was there) an incumbent performing these services?
Brand-new requirement.
4. Design Phase Deliverables Where should the design phase small-scale maquettes and initial sketches be delivered for approval?
USFWS Alaska Region and Tetlin National Wildlife Refuge, Tok, Alaska.
5. Are these to be physically delivered to a specific site, or should they be submitted electronically (digital files) for review?
The initial sketches can be sent as email attachments for review and approval by the USFWS. Photos of the clay Marquette from various angles can also be sent to the USFWS as email attachments for review and eventual approval.
6. Site Information If possible, can the program provide:
o Photos of the installation location and surroundings. See the attached summer-time photo of the lawn area and approximate location.
o Any close-up images showing condition or mounting details. Currently, the site is under 3 feet of snow, but photos can and will be sent to the contractor once the ground is snow-free.
7. Does the contractor have to provide or create the concrete pad in which these sculptures are going on?
The contractor is not responsible for providing or pouring the concrete pad for the sculptures; this will be completed by the refuge. However, the contractor must furnish a detailed diagram of the sculpture base to ensure proper preparation of the pad. This diagram shall include the exact dimensions of the base footprint, anchoring or bolt pattern specifications, and any clearance or proximity requirements necessary for installation. The refuge will use this information to confirm the correct size, alignment, and positioning of the concrete pad prior to installation of the sculpture.
8. Delivery Lead Time is being updated to:
October 1 2027 revised delivery date.