Solicitation_140FS125Q0032_Questions_0001.pdf

PDF 68 KB Posted

Attached to
CA-KERN NWR-SALT CEDAR REMOVAL Federal contract opportunity
Solicitation number
140FS125Q0032
Issued by
Department of the Interior Fish and Wildlife Service

About this file

This is a Questions and Answers document for Solicitation 140FS125Q0032 regarding a sawyer crew to remove salt cedar trees at the FWS Kern National Wildlife Refuge in California. The document addresses 16 questions from potential contractors about the project requirements and specifications.

Key details revealed include: this is a new requirement with no incumbent; the project covers 18 net acres total with options for 5, 10, or 18 acres; work must be performed on foot once on site though existing roads/levees can be used for access; cut salt cedars must be below 18" in height; weekend work is possible below 85 degrees with advance coordination; no camping is allowed on site; invoicing can be done after completion of each option if Option 3 is awarded; contractors must provide their own high-clearance vehicle for site visits; and the refuge staff will mark the project boundaries with wooden stakes and provide maps for the awarded acreage. The project uses acres rather than individual trees as the unit of measurement, and a masticator was used in other locations but there is no directly comparable prior work area.

View the file

Other files for this federal contract opportunity

Other files attached to CA-KERN NWR-SALT CEDAR REMOVAL, newest first.
File Type Posted
Sol_140FS125Q0032_Amd_0006.pdf PDF
B08_Provisions_And_Clauses_0006.pdf PDF
Sol_140FS125Q0032_Amd_0005.pdf PDF
Sol_140FS125Q0032_Amd_0004.pdf PDF
REVISED_CHAINSAW_SALT_CEDER_MAP_0004.pdf PDF
REVISED_SOW_Kern_NWR_Salt_Cedar_Chainsaw_crew_0003.pdf PDF
Sol_140FS125Q0032_Amd_0003.pdf PDF
Sol_140FS125Q0032_Amd_0002.pdf PDF
Solicitation_140FS125Q0032_Additional_Questions_0002.pdf PDF
Sol_140FS125Q0032_Amd_0001.pdf PDF
Wage_Determination_No_1977-0727.pdf PDF
Sol_140FS125Q0032.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION 140FS125Q0032

Sawyer Crew to Remove Salt Cedar Trees

FWS Kern NWR CA

Questions and FWS Responses (Bolded)

1. Is there an incumbent and what is the contract ID? This is a new requirement.

2. What are the documents needed to submit a quote? As stated in the solicitation, “*Complete the SF-18 (and any Amendments thereto As), including all Representations/Certifications (FAR 52.204-24, FAR 52.204-26, FAR 52.204-29, and FAR 52.209-11) listed in the RFQ, your Unique Entity ID assigned by SAM.gov (https://sam.gov/content/home), valid email address and, any questions via email to Roger Lockhart, Contractor Montech, Inc.: roger_lockhart@fws.gov. Telephone calls not accepted”.

3. When is the site visit? Contact Miguel Jimenez, Project Leader at:

miguel_jimenez@fws.gov to schedule a site visit.

4. What are the requirements for a site visit? Arrive on time and drive your own high clearance vehicle to site.

5. How many trees are expected to be trimmed/removed? Project is by acres not tress as identified in the Statement of Work (SOW).

6. What are the submission requirements for this project? See response to Question 2, above.

7. If awarded all options, can we invoice after completing each unit? or do we need to complete all units before submitting an invoice? If Option 3 is awarded, then as each option is completed, the invoice can be uploaded to IPP (Electronic Invoicing and Payment Requirements – Invoice Processing Platform) for work completed and accepted.

8. Will camping be allowed on the refuge for the contracting crew? There is no camping or overnight stay at the Refuge/project site.

9. What is the project budget for this requirement? This information is not available.

10. How waterlogged / dry are the soils. Can a vehicle be driven through or is everything on foot? You can use existing roads/levees to access project site, but once on site, everything is on foot.

mailto:miguel_jimenez@fws.gov

11. In the past, how many crew members were utilized to cut this or another comparable area? There is no comparable area. In other locations we used a masticator

12. INSPECTION AND ACCEPTANCE: Ensure all cut salt cedars are below 18” in height and not piled above height of existing vegetation. Does this mean when Salt Cedars are cut if they fall and lay on vegetation it can’t be above 18’’. No, as long as the cut stems/stumps are not above 18". The cut limbs can lay above 18".

13. Is the project site the entire white area identified on the map? Yes, the entire project site highlighted on the map is 18 net acres

14. Will the contracted project area (5, 10, or 18 acres) be marked in the fi eld for the contractor? Yes, refuge staff will identify project area awarded with wooden steaks around the project area contracted.

15. Can new maps be developed for the number of acers that are awarded? Yes, refuge will create maps identifying project area that is awarded (5, 10, or 18 acres).

16. Is there a possibility to work Saturday and Sunday also? Due to fire risk, and if temperatures are under 85 degrees, we can be flexible and allow weekend work. This must be coordinated with the Technical Representative in advance.