Revised_Statement_of_Work_0001.pdf
PDF 694 KB Posted
- Attached to
- OR-OFFICE OTRD-FURNITURE INSTALL
- Solicitation number
- 140FS124Q0033
About this file
This statement of work outlines furniture removal, design, and installation services required by the U.S. Fish and Wildlife Service Regional Office in Portland, Oregon. Approximately 15,000 square feet of office space in the Fort Vancouver, Washington building must be reconfigured with furniture from the Portland office, including 11 offices and 56 cubicles across three floors. The selected contractor will disassemble and pack the existing furniture in Portland, store it temporarily, then transport, design layouts for, and install it in the new Fort Vancouver space by March 2024. Additional design and purchasing services are required to supplement the reused furniture and ensure a cohesive look. The contractor must coordinate all logistical aspects and provide project management to complete the work on schedule.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. FISH AND WILDLIFE SERVICE, REGIONAL OFFICE in PORTLAND, OR
OFFICE FURNITURE SYSTEMS – REMOVAL STORAGE AND INSTALL AT FORT VANCOUVER
STATEMENT OF WORK
PROJECT DESCRIPTION:
The U.S. Fish and Wildlife Service (Service) located in Portland, OR requires a vendor to remove office systems furniture from the Service’s Portland Regional Office leased through the General Services Administration (GSA), third and sixth floors, located at 911 NE 11th Avenue, transfer it to a storage location near the install location, and then complete the necessary work to install the furniture in office space located at Fort Vancouver, WA that is currently under construction. The Fort Vancouver (Vancouver) site is lease by the National Park Service. The site is approximately 15,000 gross sq. ft. located on three floors at Bldg 993, Ft, Vancouver, Washington.
The vendor must be able to meet the deadline as close as possible to remove the furniture from the Portland, OR office by March 1, 2024 (this date may shift due to the GSA construction schedule)
Requirements are to remove furniture in Portland Regional Office, pack furniture for shipping, place in storage near the install at Vancouver site in early 2024. The Service will notify the contractor of the approximate construction completion date so that the contractor can arrange, assembly, and installation at Fort Vancouver. A space design/build services will also be required prior to installing the furniture at Fort Vancouver.
The contractor shall furnish all labor, supervision, materials, equipment, and related services necessary to perform the work required under this contract in an orderly and efficient manner, to the complete satisfaction of the Government.
GENERAL DESCRIPTION:
The contractor shall furnish all labor, supervision, materials, supplies, tools, equipment, expertise, and services necessary to perform the disassembly of Portland furniture, packing, storing, and shipping. The contractor will also provide, design, layout, assembly, and installation of all Portland furniture in Vancouver. – including ensuring all furniture electric outlets and data ports are operable. The contractor shall work in coordination with the Service personnel, the building owner’s management company (as needed), and any other contractors required to complete the project.
The selected contractor is required to familiarize themselves with the floor plans and the existing conditions of the floors at the Vancouver building location. The existing floor plan is included at the end of the document (see footnote on attachment). The awarded contractor shall review all site conditions and verify they are acceptable for the awarded furniture solution. The awarded contractor shall also meet with the agency representatives to review the design/reconfiguration solutions, as well as order any additional furniture needed under the design to match finishes or other aspects of the furniture removed from Portland.
The awarded contractor shall provide a complete project and schedule with deadlines, developed in coordination with the Service project team.
The awarded contractor shall be responsible for assessing, evaluating, verifying, and confirming the conditions of the Portland and Vancouver buildings, accessibility, site restrictions, parking, deliveries, loading dock, storage and staging, hours of availability/accessibility of all the above and any other conditions associated with, and which may affect cost of transportation, delivery, and installation. The Contractor shall ensure that their design, layout, and installation is in compliance with area building code requirements, as well as Federal, State and local code requirements.
STATEMENT OF WORK
OVERALL REQUIREMENTS:
All additional pieces of the office furniture added to the Portland furniture shall be designed and finished to provide a unified look throughout the new Vancouver space. All products and furniture systems shall be installed to be stable, durable, and designed for long life, appropriate for the intended staff and public use. Sound attenuation measures for all new cubicles is extremely important. It is also important where possible to incorporate environmental sustainability considerations into product selection, such as sustainable sourcing and manufacture, longevity, recyclability, and certification/rating of sustainability. Laminate adhesives used to fabricate on-site or shop-applied assemblies containing laminate adhesives must contain no urea-formaldehyde.
PROJECT MANAGEMENT:
The successful contractor will provide overall project management for space planning, product specific design, specifications, orders, delivery, and installation according to the schedule required by the Service’s project team.
The contractor shall identify and provide a single point of contact (POC) to provide overall management and supervision during the period of performance. The single POC will serve as representative for the Service project team to ensure the delivery and installation of furniture awarded by the Service. The single POC shall serve as a liaison among all the various furniture manufacturers, corporate representatives, service providers and subcontractors to ensure successful delivery and installation and shall have the authority to act on behalf of all the product and service providers. It is necessary to ensure furniture is successfully delivered and installed on time. During installation, the POC, an installation project manager or contractor’s representative should be on site at all times during installation services and shall have the authority to act for the contractor at all times.
DISASSEMBLY AND PACKING REQUREIMENTS:
The contractor shall furnish all labor, supervision, materials, supplies, tools, equipment, and expertise necessary to perform the inventorying, disassembly and packing of furniture located in Portland for shipping. Consideration of (TBD) storage of furniture will be required due to the date the furniture must be removed from Portland space while allowing time for construction completion at the Vancouver site. Contractor must ensure furniture is efficiently disassembled and packed to be used in the new designed space located in Vancouver, WA. The contractor shall work in coordination with the Service personnel, the building owner’s (NPS and GSA) management (as needed), and any other contractors required to complete the project.
STORAGE REQUIREMENTS:
The contractor will be required to store the packed furniture in a secure location provided by the National Park Service near the install site in Vancouver. The date will be determined by the completion of construction at the Vancouver site.
SHIPPING REQUIREMENTS:
The contractor shall arrange all shipping to include ground transportation from on-site in Portland to storage location to onsite location in Vancouver. Contractor must arrange delivery to the Service offices in the Vancouver (NPA) building location in accordance with the installation schedule and complying with all building owner schedules and loading requirements. Contractor will be responsible for payment, bill of lading, and any other permitting or requirement by the shipping and transportation vendors.
STATEMENT OF WORK
REMOVAL AND EXCESS OF EXISITING FURNITURE:
Contractor will provide for the complete removal and excess/recycle/disposal of all existing cubicles and furniture as required by Service for the proper install of new furniture and/or partitions, unless the Service project team provides any exceptions (some components may be reused elsewhere). The contractor shall make any necessary arrangements with private parties and with local officials pertaining to locations and regulations of such disposal. Any fees or charges for disposal of materials shall be the responsibility of the contractor.
DESIGN & LAYOUT:
Furniture requirements for offices, cubicles, and other areas, will be developed in conjunction with the contractor and Service project team. Design, layout, and requirements will be developed during onsite meeting(s) or video calls between the contractor and Service project team.
The Service requires the design and layout for space in the basement, 1st, and 2nd floors, with approximately 11 offices and 56 cubicles to be reconfigured, and 1 mail room. The offices are of various types and sizes (cubicles or offices with doors; small, medium, or large sized offices). The contractor shall work the Service project team to design and layout a configuration in alignment with objectives of the Service for this project:
• Improve flow of the office cubicles and storage with efficiencies where possible
• Update office space for shift to technology-based work (i.e., less paper storage), and provide more ergonomic design of workspace such as ergonomic workspace tools/furniture
The contractor shall be responsible for providing all design aspects and documents to the customer for review and approval. The design shall incorporate the workstations/offices to be occupied by the Service/customer and all supporting equipment such as printers, storage, copiers, etc. unless otherwise specifically excluded by the Service project team.
• A copy of the finalized design shall be submitted to the Service Contracting Officer (or representative) and project team. The successful contractor will assist the customer by proposing colors, fabrics and accessories which will coordinate with carpets, paints, etc. in the area.
• The Contractor shall conduct a site verification to ensure design of the dimensions of the product line and the plans are correct and are within the dimensions of the building layout.
Relief for the contractor not making this verification will not be given. Walkways and passageways shall not be less than indicated on the building drawings.
• Any difficulties in reaching agreement or making progress on the design by either party should be reported to Service Contracting Officer.
• Any request to modify design documents or pricing must be proposed by the contractor and approved in writing by the Service Contracting Officer. No performance on a requested change order shall be performed until a signed modification has been received by the contractor.
INSTALLATION SERVICES:
The contractor shall furnish all labor, materials, equipment, and related services necessary to perform the work required under this contract in an orderly and efficient manner, to the complete satisfaction of the Government. Upon award, the project schedule, including installation, shall be developed in cooperation with the Service project team.
STATEMENT OF WORK
The contractor is responsible to ensure the installation plans are compatible and in accordance with the manufacturer's planning guides. The contractor is required to provide installation plans.
The contractor shall submit specifications, shop drawings, and finish samples for any additional furniture that is ordered and must be reviewed and approved by the Service Contracting Officer (or representative) and project team.
Any request to modify installation documents or pricing must be proposed by the contractor and approved in writing by the Service Contracting Officer. No performance on a requested change order shall be performed until a signed modification has been received by the contractor.
Completion of the furniture installation services by the contractor shall include the following tasks:
1. Responsible for compliance of all products and installation to the general specifications and with all applicable state, local and federal building codes, and local ordinances and regulations. Ensure installation conforms to the requirements of the Uniform Federal Accessibilities Standards. The responsibility for determining and assuring compliance is that of the successful contractor.
2. Bring any unexpected conflicts or issues during product installation to the Service Contracting Officer (or representative) and project team for resolution. Any difficulties in reaching agreement or making progress on the installation by either party should be reported to Service Contracting Officer.
3. Responsible for coordinating with the Service project team, leased building manager (if needed) and other contractors on the installation of all supporting trade work, such as electrical and IT, to provide a complete furniture system installation
4. Check parts at disassembly location and/or factory prior to shipping to ensure order is complete and that installation shall not be delayed as a result of missing parts or an incomplete delivery.
5. Arrange delivery to the Service building location in accordance with the installation schedule.
6. Provide on-site management, coordination, and technical assistance by a project manager (or contractor representative) working with the Service project team throughout the installation phase. Provide installation supervision by an experienced, on-site supervisor that has received appropriate training by or from the furniture systems manufacturer to oversee qualified furniture systems installers.
7. Coordinate all deliveries and installation times with the Service project team (and the leased building manager if needed).
8. Responsible for ensuring that the contractor’s installation personnel are identifiable and will need to coordinate access with building security and management.
9. Meet all incoming delivery vehicles at the building, unload deliveries, check for damages, and move furniture to the desired areas in coordination with building security and management.
10. Ensure the installation is in accordance with the manufacturer's planning guides.
11. Do not interrupt building utility services without the prior written approval of the Service or leased building manager.
12. Conduct installation services during regular business hours to the maximum extent possible according to the schedule developed with Service approval. If required to meet the approved installation schedule, evening and weekend hours may be necessary and determined in advance and with approval from the Service Contracting Officer (or representative) and based on building requirements and/or client time requirements.
13. Provide a professional installation that is square, plum and properly aligned with adjoining furniture.
STATEMENT OF WORK
14. Provide and utilize proper measures (protective runners, pads, etc.) to protect the building (elevators, walls, floors, etc.).
15. Correct (at the contractor’s expense) any installation problems, which are the result of incorrect layouts, insufficient field verification, delivery errors and damaged product.
16. Protect all warranties by immediately correcting all omissions, mistakes, or damage.
17. Remove from the project site any defective product or material that has been delivered to the site in error, unless otherwise directed by the Service Contracting Officer (or representative).
18. Replace damaged and/or missing product by means that will prevent, minimize, or eliminate installation delays. Damaged product replacements, including communications, shipping, and installation, will be at the selected contractor's expense. All damaged products shall be removed from the job site immediately. Correct all minor deficiencies and make all minor adjustments as required for compliance with life safety codes within seventy-two (72) hours after completing installation. Touch-up all nicks and scratches on the furniture that occurs during installation, if possible, in lieu of replacement.
19. Take responsibility for any damage to the leased building which occurs during delivery and installation. It is incumbent upon the successful contractor to identify any existing damage to the building by means of a pre-Installation and delivery walk-thru, and daily submissions of checklists to the designated agency representative on site. Correct at contractor's expense or pay the Government to repair any building damage caused by the installation team, including damage to walls, ceiling, and floors. Restore the building to the condition it was in at the start of furniture installation. If the contractor repairs building damage, the damage repaired must meet the environmental specifications required by the Service or leased building manager.
20. Clean and dust furniture surfaces inside and out with a spray cleaner upon completion of installation of each floor. Use only approved non-toxic cleaners.
21. Clean up and dispose of waste materials or rubbish in accordance with this paragraph and all applicable federal, state & local regulations, standards, codes & laws.
22. The contractor shall at all times keep the job site, including staging and storage areas used by the contractor, free from accumulations of waste material or rubbish. This material shall be removed on a daily basis to eliminate the accumulation of debris. Prior to completion of the work, the contractor shall remove from the vicinity of the work all shipping containers, packing, rubbish, unused materials, and other like material, belonging to the contractor or used under the contractor's discretion.
23. Review the installation of the site with Service Contracting Officer (or representative) and prepare a punch list of any problems that shall be corrected. Correct all punch list items, to the satisfaction of the Service Contracting Officer (or representative) within ten (10) working days after completing the furniture installation.
24. Provide an inventory of all products installed under this project.
25. Provide product warranties and manuals (electronic files are acceptable) and keys.
26. Conduct a post-installation orientation/training sessions for personnel to instruct users and assigned maintenance personnel how to maintain panels, work surfaces, and components utilized in the project. The training shall include, but is not limited to the following: cleaning, repairs, assembly, disassembly, maintenance and rearrangement of panels, work surfaces and components.
27. When installation is complete the contractor shall submit a statement of acceptance, to be reviewed and signed by the Service Contracting Officer (or representative) with any exceptions noted, with final version retained by the Service Contracting Officer.
28. All new construction should be in similar or complementary materials, configurations, colors to the furniture removed from the Portland site.
29. Identify cost efficiencies where able. Service is open to economies of design and installation if products meet quality standards.
STATEMENT OF WORK
On-Site TECHNICAL REPRESENTATIVE Steve Hayes-Liston Cell: 503-737-9371 Email: steve_hayes-liston@fws.gov
Appendix A
Portland Regional Office
Loca�on of Furniture Removal
05/07/20
Furniture removal from:
Portland regional office:
911 NE 11th Ave Portland, OR 97232
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in mm
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in Feet
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
FEC
AutoCAD SHX Text
MEN
AutoCAD SHX Text
CUST.
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text 4E68 60.00 SqFt
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text 4E70 60.00 SqFt
AutoCAD SHX Text 4E72 60.00 SqFt
AutoCAD SHX Text 4E74 60.00 SqFt
AutoCAD SHX Text 4E76 60.00 SqFt
AutoCAD SHX Text 4E78 60.00 SqFt
AutoCAD SHX Text 4E80 60.00 SqFt
AutoCAD SHX Text 4E82 60.00 SqFt
AutoCAD SHX Text 4E84 60.00 SqFt
AutoCAD SHX Text 4E86 60.00 SqFt
AutoCAD SHX Text 4E88 60.00 SqFt
AutoCAD SHX Text 4E64 04089 142.25 SqFt 1436
AutoCAD SHX Text 4E60 04063 164.72 SqFt 1436
AutoCAD SHX Text 4E34 04078 81.17 SqFt 1436 FOCUS RM
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text 4E61 60.00 SqFt
AutoCAD SHX Text 4E63 60.00 SqFt
AutoCAD SHX Text 4E67 60.00 SqFt
AutoCAD SHX Text 4E69 60.00 SqFt
AutoCAD SHX Text 4E73 60.00 SqFt
AutoCAD SHX Text 4E75 60.00 SqFt
AutoCAD SHX Text 4E79 60.00 SqFt
AutoCAD SHX Text 4E81 60.00 SqFt
AutoCAD SHX Text 4E12 60.00 SqFt
AutoCAD SHX Text 4E14 60.00 SqFt
AutoCAD SHX Text 4E16 04017 58.44 SqFt 1436 FOCUS RM
AutoCAD SHX Text 4E18 60.00 SqFt
AutoCAD SHX Text 4E20 60.00 SqFt
AutoCAD SHX Text 4E24 60.00 SqFt
AutoCAD SHX Text 4E26 60.00 SqFt
AutoCAD SHX Text 4E28 60.00 SqFt
AutoCAD SHX Text 4E30 60.00 SqFt
AutoCAD SHX Text 4E05 040110 318.17 SqFt 1436
AutoCAD SHX Text 4E68 60.00 SqFt
AutoCAD SHX Text 4E07 141.98 SqFt
AutoCAD SHX Text 4E11 141.98 SqFt
AutoCAD SHX Text 4E13 141.98 SqFt
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text 4E17 60.00 SqFt
AutoCAD SHX Text 4E19 60.00 SqFt
AutoCAD SHX Text 4E21 60.00 SqFt
AutoCAD SHX Text 4E23 60.00 SqFt
AutoCAD SHX Text 4E25 60.00 SqFt
AutoCAD SHX Text 4E27 60.00 SqFt
AutoCAD SHX Text 4E29 60.00 SqFt
AutoCAD SHX Text 4E31 60.00 SqFt
AutoCAD SHX Text 4E33 60.00 SqFt
AutoCAD SHX Text 4E35 60.00 SqFt
AutoCAD SHX Text 4E37 60.00 SqFt
AutoCAD SHX Text
FOURTH FLOOR PLAN - EAST
AutoCAD SHX Text
AutoCAD SHX Text 4W00 04057 636.95 SqFt 1436
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text 4E65 04090 58.42 SqFt 1436 COPY RM
AutoCAD SHX Text 040112 TTO 5641.96 SqFt 1436 AOR04324
AutoCAD SHX Text 4E83 04069 77.03 SqFt 1436 FOCUS RM
AutoCAD SHX Text 4E39 040117 91.89 SqFt 1436
AutoCAD SHX Text 4E41 040118 91.52 SqFt 1436
AutoCAD SHX Text 4E43 04071 168.24 SqFt 1436
AutoCAD SHX Text 4E42 04073 190.17 SqFt 1436 CONFERENCE RM
AutoCAD SHX Text 4E89 04002 80.28 SqFt 1436 FOCUS RM
AutoCAD SHX Text 4E40 040103 80.20 SqFt 1436 FOCUS RM
AutoCAD SHX Text 4E90 04077 99.48 SqFt 1436
AutoCAD SHX Text 4E92 04074 99.96 SqFt 1436
AutoCAD SHX Text 4E94 04075 150.2 SqFt 1436
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
RR
AutoCAD SHX Text
101.33 SqFt 1436
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
NWRS
AutoCAD SHX Text
4E EGRESS
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
SHEET __ OF __
AutoCAD SHX Text
ORIGINAL DRAWING
AutoCAD SHX Text
NOT ONE INCH
AutoCAD SHX Text
ON THIS SHEET
AutoCAD SHX Text
ACCORDINGLY, IF
AutoCAD SHX Text
ADJUST SCALES
AutoCAD SHX Text 0" 1"
AutoCAD SHX Text
ONE INCH ON
AutoCAD SHX Text
THIS BAR IS
AutoCAD SHX Text
VERIFY SCALE
AutoCAD SHX Text
REGIONAL OFFICE R-1 USFWS
AutoCAD SHX Text
SPACE PLANNING
AutoCAD SHX Text
FOURTH FLOOR WEST
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
LAYOUT
AutoCAD SHX Text
RO
AutoCAD SHX Text
RO
AutoCAD SHX Text 10/3/16
AutoCAD SHX Text
1G-OR-MISC-630-6.0
AutoCAD SHX Text
AutoCAD SHX Text shayesliston Rectangle
CAPPNCAPMGCAPMCCAPQTCAPDH
C A
P T
G
CAPGC
CAPPNCAPMGCAPMCCAPQTCAPDH
C A
P T
G
CAPGC
CAPPNCAPMGCAPMCCAPQTCAPDH
CAPTG
CAPGC CAPPNCAPMGCAPMCCAPQTCAPDH
CAPTG
CAPGC
05/07/20
Furniture removal from:
Portland regional office:
911 NE 11th Ave Portland, OR 97232
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
FEC
AutoCAD SHX Text
MEN
AutoCAD SHX Text
CUST.
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
MECH.
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text F
AutoCAD SHX Text
ODI
AutoCAD SHX Text
COPY RM
AutoCAD SHX Text
BASS
AutoCAD SHX Text
BASS
AutoCAD SHX Text B&F
AutoCAD SHX Text
EN/WR
AutoCAD SHX Text B&F
AutoCAD SHX Text
EN/WR
AutoCAD SHX Text
CGS
AutoCAD SHX Text
EN/ENV
AutoCAD SHX Text
CGS
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
EN/WR
AutoCAD SHX Text
SAFTY
AutoCAD SHX Text
CGS
AutoCAD SHX Text B&F
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text 3E00 1084.52 SqFt
AutoCAD SHX Text 3E63
AutoCAD SHX Text 3E70
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text 3E72 60.00 SqFt
AutoCAD SHX Text 3E74 60.00 SqFt
AutoCAD SHX Text 3E76 60.00 SqFt
AutoCAD SHX Text 3E78 60.00 SqFt
AutoCAD SHX Text 3E80 60.00 SqFt
AutoCAD SHX Text 3E82 60.00 SqFt
AutoCAD SHX Text 3E84 60.00 SqFt
AutoCAD SHX Text 3E86 60.00 SqFt
AutoCAD SHX Text 3E88 60.00 SqFt
AutoCAD SHX Text 3E90 60.00 SqFt
AutoCAD SHX Text 3E94
AutoCAD SHX Text
EN/CON
AutoCAD SHX Text 3E07 60.00 SqFt
AutoCAD SHX Text 3E13
AutoCAD SHX Text 3E14
AutoCAD SHX Text 3E08 60.00 SqFt
AutoCAD SHX Text 3E17
AutoCAD SHX Text 3E19
AutoCAD SHX Text 3E23
AutoCAD SHX Text 3E18
AutoCAD SHX Text 3E71 70.24 SqFt
AutoCAD SHX Text 3E73 60.00 SqFt
AutoCAD SHX Text 3E24 60.00 SqFt
AutoCAD SHX Text 3E75 60.00 SqFt
AutoCAD SHX Text 3E26 60.00 SqFt
AutoCAD SHX Text 3E77 60.00 SqFt
AutoCAD SHX Text 3E79 60.00 SqFt
AutoCAD SHX Text 3E30 60.00 SqFt
AutoCAD SHX Text 3E81 60.00 SqFt
AutoCAD SHX Text 3E32 60.00 SqFt
AutoCAD SHX Text 3E83 60.00 SqFt
AutoCAD SHX Text 3E34 60.00 SqFt
AutoCAD SHX Text 3E85 60.00 SqFt
AutoCAD SHX Text 3E36 60.00 SqFt
AutoCAD SHX Text 3E87 60.00 SqFt
AutoCAD SHX Text 3E38 60.00 SqFt
AutoCAD SHX Text 3E89 60.00 SqFt
AutoCAD SHX Text 3E29 60.00 SqFt
AutoCAD SHX Text 3E31 60.00 SqFt
AutoCAD SHX Text 3E33 60.00 SqFt
AutoCAD SHX Text 3E35 60.00 SqFt
AutoCAD SHX Text 3E37 60.00 SqFt
AutoCAD SHX Text 3E39 60.00 SqFt
AutoCAD SHX Text 3E41
AutoCAD SHX Text 3E43
AutoCAD SHX Text
THIRD FLOOR PLAN - EAST
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in mm
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in Feet
AutoCAD SHX Text 03009 124.36 SqFt 1436
AutoCAD SHX Text 03010 94.91 SqFt 1436
AutoCAD SHX Text 03011 94.60 SqFt 1436
AutoCAD SHX Text 03018 189.00 SqFt 1436
AutoCAD SHX Text 030079 539.83 SqFt 1436
AutoCAD SHX Text 03055 142.96 SqFt 1436
AutoCAD SHX Text 03054 142.45 SqFt 1436
AutoCAD SHX Text 03058 142.45 SqFt 1436
AutoCAD SHX Text 03059 90.22 SqFt 1436
AutoCAD SHX Text 03060 54.22 SqFt 1436
AutoCAD SHX Text 03053 150.20 SqFt 1436
AutoCAD SHX Text 03061 144.57 SqFt 1436
AutoCAD SHX Text 03067 145.49 SqFt 1436
AutoCAD SHX Text 030080 62.07 SqFt 1436
AutoCAD SHX Text 030091 72.86 SqFt 1436
AutoCAD SHX Text 3E10
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text 3E15
AutoCAD SHX Text 3E25
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text 3E16
AutoCAD SHX Text 03019 677.62 SqFt 1436
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text 03048 96.25 SqFt 1436
AutoCAD SHX Text 3E69
AutoCAD SHX Text 030082 TTO 4653.10 SqFt 1436
AutoCAD SHX Text 3E42
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text 030087 111.07 SqFt 1436
AutoCAD SHX Text 030078 41.79 SqFt 1436
AutoCAD SHX Text 3E09 60.00 SqFt
AutoCAD SHX Text 3E11 60.00 SqFt
AutoCAD SHX Text SUITE 3E01 OFFICE of DIVERSITY & INCLUSION
AutoCAD SHX Text R9
AutoCAD SHX Text R9
AutoCAD SHX Text R9
AutoCAD SHX Text
COPY AREA
AutoCAD SHX Text B&F
AutoCAD SHX Text
3E EGRESS
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
SHEET __ OF __
AutoCAD SHX Text
ORIGINAL DRAWING
AutoCAD SHX Text
NOT ONE INCH
AutoCAD SHX Text
ON THIS SHEET
AutoCAD SHX Text
ACCORDINGLY, IF
AutoCAD SHX Text
ADJUST SCALES
AutoCAD SHX Text 0" 1"
AutoCAD SHX Text
ONE INCH ON
AutoCAD SHX Text
THIS BAR IS
AutoCAD SHX Text
VERIFY SCALE
AutoCAD SHX Text
REGIONAL OFFICE R-1 USFWS
AutoCAD SHX Text
SPACE PLANNING
AutoCAD SHX Text
THIRED FLOOR EAST
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
LAYOUT
AutoCAD SHX Text
RO
AutoCAD SHX Text
RO
AutoCAD SHX Text 10/3/16
AutoCAD SHX Text
1G-OR-MISC-630-4.0
AutoCAD SHX Text
AutoCAD SHX Text shayesliston Cross-Out
PL
OT
TE
R
PAPER CUTTER SCANNER
IMD-EN
05/07/20
26X40
Furniture removal from:
Portland Regional Office 911 NE 11th Ave Portland, OR 97232
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
CPENTID
AutoCAD SHX Text
DN
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
DN
AutoCAD SHX Text
FEC
AutoCAD SHX Text
FEC
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
MECH.
AutoCAD SHX Text
EN
AutoCAD SHX Text
EN
AutoCAD SHX Text
EN
AutoCAD SHX Text
EN
AutoCAD SHX Text B&F
AutoCAD SHX Text B&F
AutoCAD SHX Text B&F
AutoCAD SHX Text B&F
AutoCAD SHX Text
CGS
AutoCAD SHX Text
CGS
AutoCAD SHX Text
CGS
AutoCAD SHX Text
CGS
AutoCAD SHX Text
CGS
AutoCAD SHX Text
CGS
AutoCAD SHX Text
CGS
AutoCAD SHX Text
EN
AutoCAD SHX Text
BASS
AutoCAD SHX Text
ABA
AutoCAD SHX Text
ABA
AutoCAD SHX Text 3W90 262.83 SqFt
AutoCAD SHX Text 3W89 60.00 SqFt
AutoCAD SHX Text 3W87 60.00 SqFt
AutoCAD SHX Text 3W85 60.00 SqFt
AutoCAD SHX Text 3W83 60.00 SqFt
AutoCAD SHX Text 3W44 159.83 SqFt
AutoCAD SHX Text
CGS
AutoCAD SHX Text 3W74
AutoCAD SHX Text B&F
AutoCAD SHX Text 3W40 60.00 SqFt
AutoCAD SHX Text 3W38 60.00 SqFt
AutoCAD SHX Text 3W36 60.00 SqFt
AutoCAD SHX Text 3W34 60.00 SqFt
AutoCAD SHX Text 3W32 60.00 SqFt
AutoCAD SHX Text 3W30 60.00 SqFt
AutoCAD SHX Text 3W28 60.00 SqFt
AutoCAD SHX Text 3W26 60.00 SqFt
AutoCAD SHX Text 3W27
AutoCAD SHX Text 3W25
AutoCAD SHX Text 3W37 60.00 SqFt
AutoCAD SHX Text 3W35 60.00 SqFt
AutoCAD SHX Text 3W33 60.00 SqFt
AutoCAD SHX Text 3W31 60.00 SqFt
AutoCAD SHX Text 3W29 60.00 SqFt
AutoCAD SHX Text 3W19
AutoCAD SHX Text 3W17 76.67 SqFt
AutoCAD SHX Text 3W13
AutoCAD SHX Text 3W09
AutoCAD SHX Text 3W07
AutoCAD SHX Text 3W20 60.00 SqFt
AutoCAD SHX Text 3W18 60.00 SqFt
AutoCAD SHX Text 3W16 60.00 SqFt
AutoCAD SHX Text 3W14 60.00 SqFt
AutoCAD SHX Text 3W12 60.00 SqFt
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
AutoCAD SHX Text 3W81 60.00 SqFt
AutoCAD SHX Text 3W79 60.00 SqFt
AutoCAD SHX Text 3W77 60.00 SqFt
AutoCAD SHX Text 3W75 60.00 SqFt
AutoCAD SHX Text 3W71 60.00 SqFt
AutoCAD SHX Text 3W69 60.00 SqFt
AutoCAD SHX Text 3W67 60.00 SqFt
AutoCAD SHX Text 3W65 60.00 SqFt
AutoCAD SHX Text 3W88
AutoCAD SHX Text 3W84 60.00 SqFt
AutoCAD SHX Text 3W82 60.00 SqFt
AutoCAD SHX Text 3W80 60.00 SqFt
AutoCAD SHX Text 3W78 60.00 SqFt
AutoCAD SHX Text 3W76 60.00 SqFt
AutoCAD SHX Text 3W72 60.00 SqFt
AutoCAD SHX Text 3W70 60.00 SqFt
AutoCAD SHX Text 3W68 60.00 SqFt
AutoCAD SHX Text 3W66 60.00 SqFt
AutoCAD SHX Text 3W64 60.00 SqFt
AutoCAD SHX Text 3W62
AutoCAD SHX Text 3W10 60.00 SqFt
AutoCAD SHX Text
COPY RM
AutoCAD SHX Text 03072 141.50 SqFt 1436
AutoCAD SHX Text 03020 141.50 SqFt 1436
AutoCAD SHX Text 03022 141.95 SqFt 1436
AutoCAD SHX Text 03023 141.95 SqFt 1436
AutoCAD SHX Text 03013 94.63 SqFt 1436
AutoCAD SHX Text 03017 94.64 SqFt 1436
AutoCAD SHX Text 03027 189.29 SqFt 1436
AutoCAD SHX Text 03026 137.56 SqFt 1436
AutoCAD SHX Text 03048 90.44 SqFt 1436
AutoCAD SHX Text 03028 141.95 SqFt 1436
AutoCAD SHX Text 030089 TTO 5628 SqFt 1436
AutoCAD SHX Text
CONFERENCE AREA
AutoCAD SHX Text 030034 141.90 SqFt 1436
AutoCAD SHX Text 030083 94.68 SqFt 1436
AutoCAD SHX Text 3W15
AutoCAD SHX Text 3W21
AutoCAD SHX Text 3W59
AutoCAD SHX Text 030086 74.45SqFt 1436
AutoCAD SHX Text 030095 73.89 SqFt 1436
AutoCAD SHX Text 3W41
AutoCAD SHX Text 3W39
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text 030090 58.75 SqFt 1436
AutoCAD SHX Text 3W63
AutoCAD SHX Text 030090 56.80 SqFt 1436
AutoCAD SHX Text 3W06
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text 03070 83.86 SqFt 1436
AutoCAD SHX Text 03047 1064.82 SqFt 1436
AutoCAD SHX Text
THIRD FLOOR PLAN - WEST
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in mm
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Scale in Feet
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text
66.67 SqFt
AutoCAD SHX Text 03029 290.86 SqFt 1436
AutoCAD SHX Text
3W EGRESS
AutoCAD SHX Text
EN
AutoCAD SHX Text
138.75 SqFt
AutoCAD SHX Text
CONFERENCE ROOM
AutoCAD SHX Text
AutoCAD SHX Text 030090 56.80 SqFt 1436
AutoCAD SHX Text
FOCUS RM
AutoCAD SHX Text 03047 1064.82 SqFt 1436
AutoCAD SHX Text
DESIGNED
AutoCAD SHX Text
DRAWN
AutoCAD SHX Text
CHECKED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BY
AutoCAD SHX Text
SHEET __ OF __
AutoCAD SHX Text
ORIGINAL DRAWING
AutoCAD SHX Text
NOT ONE INCH
AutoCAD SHX Text
ON THIS SHEET
AutoCAD SHX Text
ACCORDINGLY, IF
AutoCAD SHX Text
ADJUST SCALES
AutoCAD SHX Text 0" 1"
AutoCAD SHX Text
ONE INCH ON
AutoCAD SHX Text
THIS BAR IS
AutoCAD SHX Text
VERIFY SCALE
AutoCAD SHX Text
REGIONAL OFFICE R-1 USFWS
AutoCAD SHX Text
SPACE PLANNING
AutoCAD SHX Text
THIRED FLOOR WEST
AutoCAD SHX Text
SPACE
AutoCAD SHX Text
LAYOUT
AutoCAD SHX Text
RO
AutoCAD SHX Text
RO
AutoCAD SHX Text 10/3/16
AutoCAD SHX Text
1G-OR-MISC-630-3.0
AutoCAD SHX Text
AutoCAD SHX Text bhelm Sticky Note b
Appendix B
Fort Vancouver Office
Loca�on of Furniture Design and Install
Basement Offices Shared Cubes Bullpen Floor
Ecologoical Services 1 5 0 2 Migratory Birds 0 1 0 1
WSFR 0 1 1
RBA 1 0 0 1
Science Applications 1 1 0 B Fisheries 3 1 0 B National Wildlife Refuges 3 5 0 2 Office of Communications 2 2 0 2
Office of Law Enforcement 0 0 0 1
IRTM 1 1 0 B
JAO 0 0 2
Bullpen/hotel / growth 10 Totals 12 17 2
BREAK ROOM
Est – 16’ x 20’
CONFERENCE
ROOM
Est – 16’ x 35’
FOCUS
ROOM
IRTM IRTM
FAC
FAC
FAC
FAC
Hotel
Hotel
First floor
CONFERENCE
ROOM
Est – 24’ x 24’
Offices Shared Cubes Bullpen Floor Ecologoical Services 1 5 0 2 Migratory Birds 0 1 0 1
WSFR 0 1 1
RBA 1 0 0 1
Science Applications 1 1 0 B Fisheries 3 1 0 B National Wildlife Refuges 3 5 0 2 Office of Communications 2 2 0 2
Office of Law Enforcement 0 0 0 1
IRTM 1 1 0 B
JAO 0 0 2
Bullpen/hotel / growth 10 Totals 12 17 2
NOTE: Conference Room on the upper right corner of 1st floor could also be used as a touchdown space for Hugh and
Bridget. Estimated size – 16’ x 10’
MB
RBA
WSFR
Hotel
Hotel
Hotel
Second floor Turn into office
CONF
ROOM
11’x13’
Offices Shared Cubes Bullpen Floor Ecologoical Services 1 5 0 2 Migratory Birds 0 1 0 1
WSFR 0 1 1
RBA 1 0 0 1
Science Applications 1 1 0 B Fisheries 3 1 0 B National Wildlife Refuges 3 5 0 2 Office of Communications 2 2 0 2
Office of Law Enforcement 0 0 0 1
IRTM 1 1 0 B
JAO 0 0 2
Bullpen/hotel / growth 10 Totals 12 17 2
OCOCOC
OC
SA
SA
NWR
NWR
NWR
NWR
NWR
NWR
NWR
NWR
ES ES
ES
ES ES
ES
| PROJECT DESCRIPTION: |
| GENERAL DESCRIPTION: |
| OVERALL REQUIREMENTS: |
| PROJECT MANAGEMENT: |
| DESIGN & LAYOUT: |
| INSTALLATION SERVICES: |
| FTV space basic design.pdf |
| Slide Number 1 |
| Slide Number 2 |
| Slide Number 3 |
File details come from the government source that posted it. Updated .