This document is a Revised Schedule of Items for the Construction Services for Quarters 2 Rehabilitation Project at the Culebra National Wildlife Refuge (NWR) in Culebra, Puerto Rico. It lists the Base Bid Tasks (10-70) and Option Tasks (80-90) with descriptions, quantities, and unit pricing required for the project. The Base Bid Tasks include mold detection, repairing and repainting exterior walls, repairing damaged storm shutters and interior walls/doors, deep cleaning floor tiles, replacing the propane tank concrete storage structure, and a roof inspection. The Option Tasks cover mold mitigation and roof repair. Bidders are required to provide pricing and cost element breakdowns for each line item. The related federal contract opportunity has the solicitation number 140FHR24R0008 and is for the PR Culebra NWR Quarters 2 Rehabilitation project, to be awarded by the Department of the Interior Fish and Wildlife Service.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVISED SCHEDULE OF ITEMS
for
Construction Services for Quarters 2 Rehabilitation Project at the Culebra NWR, Culebra, Puerto Rico
BASE BID TASKS (10-70)
OPTION TASKS (80-90)
CLIN Number Description Quantity Unit Amount
80 Mold Mitigation Square Foot $
90 Roof Repair 1 Lump Sum $___________
TOTAL (BASE BID + OPTION
TASKS (10-90)
NOTE:
Provide pricing and cost element break downs for each of the items listed.
CLIN Number Description Quantity Unit Amount
10 Mold Detection 1 Lump Sum $
20 Repair and Repaint Damaged Exterior Walls
1 Lump Sum $
30 Repair Damaged Storm Shutters
1 Lump Sum $
40 Repair Damaged Interior Walls and Doors
1 Lump Sum $
50 Deep Clean Floor Tiles 1 Lump Sum $
60 Replace Propane Tank Concrete Storage Structure
1 Lump Sum $
70 Roof Inspection 1 Lump Sum $____________
TOTAL (BASE BID
TASKS (10-70)