This document is a Revised Schedule of Items for the Construction Services for Quarters 2 Rehabilitation Project at the Culebra National Wildlife Refuge (NWR) in Culebra, Puerto Rico. It lists the Base Bid Tasks (10-70) and Option Tasks (80-90) with descriptions, quantities, and unit pricing required for the project. The Base Bid Tasks include mold detection, repairing and repainting exterior walls, repairing damaged storm shutters and interior walls/doors, deep cleaning floor tiles, replacing the propane tank concrete storage structure, and a roof inspection. The Option Tasks cover mold mitigation and roof repair. Bidders are required to provide pricing and cost element breakdowns for each line item. The related federal contract opportunity has the solicitation number 140FHR24R0008 and is for the PR Culebra NWR Quarters 2 Rehabilitation project, to be awarded by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED SCHEDULE OF ITEMS

for

Construction Services for Quarters 2 Rehabilitation Project at the Culebra NWR, Culebra, Puerto Rico

BASE BID TASKS (10-70)

OPTION TASKS (80-90)

CLIN Number Description Quantity Unit Amount

80 Mold Mitigation Square Foot $

90 Roof Repair 1 Lump Sum $___________

TOTAL (BASE BID + OPTION

TASKS (10-90)

NOTE:

Provide pricing and cost element break downs for each of the items listed.

CLIN Number Description Quantity Unit Amount

10 Mold Detection 1 Lump Sum $

20 Repair and Repaint Damaged Exterior Walls

1 Lump Sum $

30 Repair Damaged Storm Shutters

1 Lump Sum $

40 Repair Damaged Interior Walls and Doors

1 Lump Sum $

50 Deep Clean Floor Tiles 1 Lump Sum $

60 Replace Propane Tank Concrete Storage Structure

1 Lump Sum $

70 Roof Inspection 1 Lump Sum $____________

TOTAL (BASE BID

TASKS (10-70)

REVISED SCHEDULE OF ITEMS
NOTE: