Sol_140FGA26R0040_Amd_0001.pdf
PDF 812 KB Posted
- Attached to
- Charles Russell NWR Montana Roof Replacement
- Solicitation number
- 140FGA26R0040
About this file
This document is Amendment 0001 to a federal solicitation (140FGA26R0040) for roof replacement services at the Charles Russell National Wildlife Refuge Fort Peck Bunkhouse. The amendment incorporates questions and answers clarifying project scope and requirements, with a performance period of October 1, 2026 through April 30, 2027. The proposal due date of September 7, 2026 is not extended.
The project involves replacing the roof on a 13-year-old bunkhouse constructed in 2013, which features approximately 3,300 square feet of roof area with a 4:12 pitch, 107 feet of total ridge length across two separate ridges (house and porch), and six penetrations. The scope includes 6-inch gutters with six 3-inch-wide downspouts located at building corners and 18-inch drip edge installation. Ridge ventilation deficiencies must be corrected as part of the base scope work. The contractor must estimate the cost for any concealed decking deterioration discovered after shingle removal and include that cost in the firm fixed price proposal. The Fish and Wildlife Service (FWS) administered by the General Services Administration (GSA) is issuing this solicitation. Contractors must comply with Buy American requirements under FAR 52.225-9 for construction materials, self-certifying compliance unless requesting an exception for foreign materials. All required state of Montana licensing, certifications, and permits for Valley County work are the contractor's responsibility. Weather delays during the October 2026 through April 2027 performance period will be addressed through potential contract modifications at the Contracting Officer's discretion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Ryan Boisvert
See continuation page
FWS GAOA
FWS, GAOA
5275 Leesburg Pike Falls Church VA 22041
FGA
140FGA26R0040
08/21/2026
08/21/2026
1 10
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
140FGA26R0040/0001
The purpose of this amendment, 0001, is to incorporate the following attached questions and answers:
Period of Performance: 10/01/2026 to
04/30/2027
Charles Russell NWR Fort Peck Bunkhouse Roof Replacement
Questions and Answers
1. Roof measurements and drawings: Please provide any available roof plans, photographs, dimensions, verified roof area, roof pitch, eave/rake/ridge lengths, penetrations, and gutter/downspout quantities. If these are unavailable, will the quotation deadline be extended to allow time for the site inspection and field takeoff described in the solicitation?
Answer 1: The roof has 107’ of total ridge length(s) (two separate ridges (house and attached porch), approximately 3,300 square feet of roof, 4:12 pitch, and there are 6 penetrations. The proposal due date of September 7, 2026 will not be extended.
2. Roof deck and sheathing: How should damaged or deteriorated decking and sheathing be priced? Please provide an estimated quantity, allowance, unit-price line item, or change-order procedure for concealed deterioration discovered after demolition.
Answer 2: We do not anticipate any deteriorated decking as the current roof damage is new (hasn’t had a lot of snow/ice/rain) on it, and the building is only 13 years old. If damage is detected after the shingles come off, then yes, we want that repaired correctly and would work with contracting to secure any additional costs.
The estimated cost to the contractor will be determined by the contractor and included in their total firm fixed price proposal amount.
3. Asbestos requirements: Please provide any asbestos survey, sampling results, or hazardous-material assessment for the existing roofing system. Are asbestos testing, abatement, disposal, worker training, and final air clearance included in the base scope?
If asbestos is discovered after award, will it be handled as a differing site condition or contract modification?
Answer 3: The bunkhouse was constructed in 2013 and therefore has no asbestos issues.
4. Performance period: SF 1442 states that work must begin within 10 calendar days after
Notice to Proceed and be completed within 201 calendar days. The Statement of Work states a 60-calendar-day performance period. Please confirm which period controls and the anticipated Notice to Proceed date.
Answer 4: Confirming that the performance of performance is
October 1, 2026 - April 30, 2027
5. Winter conditions: If performance is expected during the October 2026 through April
2027 period, please clarify how weather delays will be handled and whether temporary protection, snow removal, heating, or other cold-weather measures must be included in the base price.
Answer 5: The Contracting Officer will determine if a modification to extend the period of performance as the situation may arise.
6. Licensing and permits: The Statement of Work requires licenses and certifications necessary for work in Valley County and references the South Dakota Department of
Environmental Quality. Please identify the correct Montana authority and confirm the specific contractor licenses, registrations, and permits the Government requires for this direct federal project.
Answer 6: Corrected to State of Montana
7. Domestic material requirements: The Statement of Work includes an American Iron and Steel requirement, and the solicitation includes FAR 52.225-9. Please confirm the material-origin standard and documentation required for roof panels, clips, gutters, fascia, flashing, fasteners, and other incorporated steel products.
Answer 7: Offerors only need to self-certify compliance under FAR 52.225-9 for construction materials that meet the Buy American requirements. A separate certificate is not required unless the offeror is requesting an exception. If an offeror seeks to use foreign construction material, they must submit a request for an exception in accordance with FAR 52.225-10 and provide the supporting documentation required by that provision.
8. Gutters and roof accessories: Please provide the required gutter and downspout sizes, gauges, profiles, locations, and quantities. Please also confirm whether the specified drip edge is intended to be 18 inches wide.
Answer 8: There are a total of 6 downspouts (on building corners) and they are 3” wide. We would like 6” gutters. Standard gauge is fine. 18 inch drip edge is acceptable.
9. Ridge ventilation: Is evaluation and correction of inadequate ridge ventilation included in the lump-sum base scope? If deficiencies are discovered during construction, will additional ventilation work be handled through a contract modification?
Answer 9: Inadequate ridge ventilation is included in the work to be completed in the solicitation.
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .