This is a Statement of Work (SOW) for contract number 140FGA26Q0059 issued by the U.S. Fish and Wildlife Service for road repair work at Rocky Mountain Arsenal National Wildlife Refuge in Colorado.

The contractor must provide asphalt patching of approximately 338 square yards and reverse (inverted) capeseal treatment on 0.75 miles of Rattlesnake Hill Road (FWS Route 101) extending from Havana Street to a large metal swing gate. The road is 22.7 feet wide and currently in poor condition. Reverse capeseal is a technique involving slurry placement on the bottom layer followed by chipseal and compaction. Work must comply with SECTION 321216 - ASPHALT PAVING specifications for both patching and reverse capesealing, specifically addressing surface preparation, hot mix asphalt placement, and compaction. The contractor is responsible for developing a traffic control plan and may close the road to all access during construction. Work must begin within 30 days of award and be completed by March 31, 2027. Normal duty hours are Monday through Friday, 7:00 a.m. to 4:30 p.m., with any work outside these hours requiring coordination with the Contracting Officer Representative. Quality control will be maintained according to industry standards and provided with the contractor's proposal. Government acceptance is contingent upon completion of all items listed in the SOW that are operational and compliant with state and federal codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140FGA26Q0059 Patching and Reverse Capeseal Rattlesnake Hill Road at Rocky Mountain Arsenal NWR

STATEMENT OF WORK

The U.S. Fish and Wildlife Service Project Lead (PL) for this requirement is:

The U.S. Fish and Wildlife Service Contracting Officer Representative (COR) for this requirement is:

Statement of Work – This Statement of Work (SOW) describes the general performance of the project and does not attempt to show the exact construction of the work in complete detail. The Contractor is responsible for providing high-quality completed work that maintains the performance intent established by this document.

Overview – The U.S. Fish and Wildlife Service (FWS) needs the Contractor to provide repairs to the entire Rattlesnake Hill Road (FWS Route 101) beginning at Havana Street to the large metal swing gate. This road is 0.75 miles of concrete asphalt. The road is 22.7 feet wide. The road is in poor condition and will require a reverse (or inverted) capeseal in place from start to finish. Reverse capeseal is a known technique where slurry is placed on the bottom layer, followed by chipseal and compaction. This project will also require approximately 338 square yards of asphalt patching.

Project Purpose – This project aims to repair all asphalt surfaces at the refuge’s Rattlesnake Hill Road.

Project Description / Scope of Work

RT#101, RATTLESNAKE HILL ROAD

Asphalt patching of approximately 338 square yards and reverse (or inverted) capeseal of 0.75 miles of the Rattlesnake Hill Road (FWS Route 101) from Havana Street to the large metal swing gate.

This road is 0.75 miles of concrete asphalt. The road is 22.7 feet wide.

For all patching, reference specifications for PATCHING within SECTION 321216 - ASPHALT PAVING attached. For reverse capesealing, reference EXECUTION within SECTION 321216 – ASPHALT PAVING specifically SURFACE PREPARATION, PLACING HOT MIX ASPHALT, and COMPACTION attached.

The road may be closed to all access for the duration of construction work. Contractor is responsible for developing a traffic control plan to ensure contractor and public safety during cracksealing operations.

Place of Performance and Period of Performance

Work must not begin until the official Notice to Proceed (NTP) is received from the Contracting Officer.

Performance Start: 30 days from award Performance End: March 31, 2027

Normal duty hours are Monday through Friday 7:00 a.m. - 4:30 p.m.

The refuge is open for most federal holidays.

Contactor must coordinate any work activities outside of normal duty hours with the Contracting Officer Representative (COR).

Deliverables and/or Delivery Schedule:

All surfaces on the refuge’s Rattlesnake Hill Road shall be patched and reverse capesealed. This road is

0.75 miles of concrete asphalt. The road is 22.7 feet wide.

Evaluation and Acceptance

The contractor will be evaluated as detailed herein. Government acceptance is contingent upon: All of the items listed with the State of Work are completed and are operational following state and federal codes.

Quality Control/Quality Assurance:

QC will be maintained according to industry standards and made available to the agency with the contractor’s proposal.

Photographs:

File details come from the government source that posted it. Updated .