This document is Amendment 2 (effective June 11, 2026) to solicitation 140FGA26Q0034, issued by the U.S. Fish and Wildlife Service (FWS), GAOA, located in Falls Church, VA. The amendment responds to eight contractor questions regarding fence modification work.

The solicitation pertains to approximately 2 miles of fence modification involving the installation of 3-inch diameter, 10-foot long (minimum) metal posts with 2 7/8-inch diameter, 8-foot long brace rails. No stays are required between T-posts, and standard fence clips are acceptable. Clearing of trees, brush, and obstructions is permitted "if necessary" only, limited to up to 4 feet on each side of the fence line, with preservation of existing vegetation. The work includes construction and/or replacement of 7 gates, each 16 feet wide, with wood gate sticks replaced using 2-inch steel tubing. The solicitation explicitly states that a bid bond is not required; however, payment and performance bond requirements apply based on contract value thresholds (Payment Bond required for amounts over $35,000; both Payment and Performance Bonds required for amounts exceeding $150,000). The period of performance runs from July 27, 2026, to June 30, 2027. Contractors must acknowledge receipt of this amendment prior to the deadline specified in the original solicitation or submit changes by letter or electronic communication referencing the solicitation and amendment numbers.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Nicole Johnson

See continuation page

FWS GAOA

FWS, GAOA

5275 Leesburg Pike Falls Church VA 22041

FGA

140FGA26Q0034

06/11/2026

06/11/2026

1 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140FGA26Q0034/0002

Amendment 2 responds to contractor questions received.

Q1. What size metal posts and brace rails are to be used?

A1. 3" diameter, 10' long (minimum) metal posts with 2 7/8" diameter, 8' long brace rails.

Q2. Do we need to clear and grub along the 2 miles of fence modification?

A2. Clearing is allowed "if necessary," not required continuously. The SOW states the contractor "will, if necessary, clear fence lines of trees, brush, and other obstructions large enough to hinder construction operations." Clearing limits: up to 4 feet on each side of the fence, with the side(s) permitted depending on whether the line is interior (either/both sides) or boundary (USFWS side only). Preserve existing vegetation as much as possible.

Q3. Are stays used in between the T-posts?

A3. No stays required.

Q4. Are the Steel T-Post Lay-Down Fence Clips and Weld On Steel Post Clips from Tincup Creek

Fence acceptable to use?

A4. Not sure what these are but the standard fence clips normally used are acceptable.

Q5. Just to clarify, there are no wood posts?

A5. No wood posts used in construction however there are wood posts involved in the sections to be removed.

Q6. Are there any gates needed along the new fence lines? If so, how many, where, and what length?

A6. There are 7 gates that either need to be constructed and/or replaced. 16 feet wide gates.

Q7. The document mentions replacing wood gate sticks with steel tubing. What size steel tubing?

A7. 2"

Continued...

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140FGA26Q0034/0002

Q8. Is a bid bond required when the bid is submitted? We did see the requirement for the

100% payment bond after the bid is awarded.

A8. The solicitation explicitly states, "A Bid

Bond is NOT required." Payment/Performance

Protections: The solicitation text notes bond thresholds (Any amount over $35,000 requires submission of a Payment Bond. Any amount over

$150,000 requires both Payment and Performance

Bonds.)

Period of Performance: 07/27/2026 to

06/30/2027

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .