This document is a Questions and Answers (Q&A) file for Solicitation 140FGA25R0004, a project to replace headquarters offices at Bon Secour National Wildlife Refuge (NWR). The Q&A addresses technical specifications and system details for the construction project, including clarifications on security systems, surveillance, intrusion detection, and access control. Key responses indicate that video surveillance will not be installed, intrusion detection system panels are limited to specific Bosch and DMP models, and no landscape plans are included. The project requires grading, topsoiling, seeding, and mulching as specified in the Civil drawings and Division 31 - Earthwork sections. The solicitation is issued by the Department of the Interior Fish and Wildlife Service, with contractors seeking clarity on various technical and specification requirements for the construction project.

View the file

Other files for this federal contract opportunity

Other files attached to AL-BON SECOUR NWR-REPLACE HDQTRS OFFICE, newest first.
File Type Posted
Questions_and_Answers_7_0009.pdf PDF
Sol_140FGA25R0004_Amd_0009.pdf PDF
Sol_140FGA25R0004_Amd_0008.pdf PDF
Attachment_-_Past_Performance_Questionnaire_0007.pdf PDF
Questions_and_Answers_6_0007.pdf PDF
Sol_140FGA25R0004_Amd_0007.pdf PDF
Sol_140FGA25R0004_Amd_0006.pdf PDF
Questions_and_Answers_5_0006.pdf PDF
Questions_and_Answers_4_0005.pdf PDF
Sol_140FGA25R0004_Amd_0005.pdf PDF
Questions_and_Answers_(3)_0004.pdf PDF
BSNWR_VCHQ_Sign_In_0004.pdf PDF
Sol_140FGA25R0004_Amd_0004.pdf PDF
FWS_Bon_Secour__telecom_addendum_03-07-25_0003.pdf PDF
REVISED_SOW_-_Bon_Secour_Headquarters_3_10_25_0003.pdf PDF
Sol_140FGA25R0004_Amd_0003.pdf PDF
Division_27_Specifications__Communications_0003.pdf PDF
FWS_Agency_Specific_Requirements_for_IT_Infrast_0003.pdf PDF
Questions_and_Answers_0002.pdf PDF
Sol_140FGA25R0004_Amd_0002.pdf PDF
B09_-_Solicitation_Amendment_(140FGA25R0004_P0001)_0001.pdf PDF
Sol_140FGA25R0004_Amd_0001.pdf PDF
Sol_140FGA25R0004.pdf PDF
B08_-_Solicitation_(Statement_of_Work).pdf PDF
B08_-_Solicitation_(Building_Rendering).pdf PDF
B08_-_Solicitation_(DOL_Wage_Determination).pdf PDF
B08_-_Solicitation_(Bid_Schedule).docx DOCX document
B08_-_Solicitation_(Drawings).pdf PDF
B08_-_Solicitation_Form_1442_(140FGA25R0004).pdf PDF
B08_-_Solicitation__(140FGA25R0004).pdf PDF
B08_-_Solicitation__(Geotechnical_Survey).pdf PDF
B08_-_Solicitation_(Specifications).pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bon Secour NWR Construc on Services Solicita on 140FGA25R0004

Ques ons and Answers #2

1. I have a question regarding the security systems on this project. The specifications for division 28 in section (28 20 00) mention a video surveillance system. I didn't see any camera icons on the drawings.

USFWS Response: As per question 24 in B08-Solicitation (Statement of Work), Video surveillance will not be installed. Please ignore the video surveillance specifications for this project.

2. IN spec section 28 20 00 it mentions intrusion detection in section 283100, but I did not see that section in the specs.

USFWS Response: As per question 22 in B08-Solicitation (Statement of Work), For the intrusion detection system, the construction drawings on E-104 reference Appendix 1 INTRUSION DETECTION SYSTEM (IDS) of the Specifications.

System Panels Authorized include:

A. Bosch model numbers 8512G or 9512G series or B. DMP model XR150 Note: Proprietary panels will not be accepted due to the inability to provide adequate support.

3. I noticed the access control rough in detail on the E104 drawing, but I didn't see any specifications for a system. Is the division 28 for surveillance, and intrusion, and or access control open for bid on this project?

USFWS Response: Please see questions 2 and 3 above. Please review questions and answers in B08-Solicitation (Statement of Work).

4. I see data drops on the drawing, but no telecom specs, is division 27 telecom open for bid on this project?

USFWS Response: Please review questions 22-28 and answers in B08-Solicitation (Statement of Work).

5. Are there any landscaping drawings?

USFWS Response: There is no landscape plans. USFWS does not want shrubs, trees, etc planted. Grading, topsoiling, seeding, mulching, as required in the Civil drawings and Division 31 – Earthwork are required.