FWS_Bon_Secour__telecom_addendum_03-07-25_0003.pdf

PDF 104 KB Posted

Attached to
AL-BON SECOUR NWR-REPLACE HDQTRS OFFICE
Solicitation number
140FGA25R0004
Issued by

About this file

This document is a Telecom Addendum for the Bon Secour Headquarters/Visitor Center detailing specific telecommunications infrastructure requirements. The scope includes extending fiber optic connectivity from an existing building to a new building, which involves splicing and running fiber optic cable, terminating with connectors compatible with a Cisco 9200 48-port PoE Switch, and installing a two-inch metal conduit. The contractor is responsible for running and terminating three CAT 6A cables to access points, creating mounting surfaces for access points, and relocating an existing government cabinet while maintaining manufacturer clearance requirements.

The government will provide and install a Cisco 9200 48-port PoE Switch, three Cisco 9120 Access Points, and the existing cabinet. The contractor must furnish all CAT6A cables with proper terminations to patch panels and wall drops, mounting surfaces for access points compatible with ceiling materials, fiber optic cable and appurtenances, conduit, and a 4'x8' 3/4" backboard for telecommunications equipment. The project is associated with Solicitation Number 140FGA25R0004 for the Department of the Interior Fish and Wildlife Service's Bon Secour National Wildlife Refuge headquarters office replacement.

View the file

Other files

File Type Posted
Sol_140FGA25R0004_Amd_0009.pdf PDF
Questions_and_Answers_7_0009.pdf PDF
Sol_140FGA25R0004_Amd_0008.pdf PDF
Sol_140FGA25R0004_Amd_0007.pdf PDF
Attachment_-_Past_Performance_Questionnaire_0007.pdf PDF
Questions_and_Answers_6_0007.pdf PDF
Questions_and_Answers_5_0006.pdf PDF
Sol_140FGA25R0004_Amd_0006.pdf PDF
Questions_and_Answers_4_0005.pdf PDF
Sol_140FGA25R0004_Amd_0005.pdf PDF
BSNWR_VCHQ_Sign_In_0004.pdf PDF
Sol_140FGA25R0004_Amd_0004.pdf PDF
Questions_and_Answers_(3)_0004.pdf PDF
REVISED_SOW_-_Bon_Secour_Headquarters_3_10_25_0003.pdf PDF
Questions_and_Answers_2_0003.pdf PDF
FWS_Agency_Specific_Requirements_for_IT_Infrast_0003.pdf PDF
Division_27_Specifications__Communications_0003.pdf PDF
Sol_140FGA25R0004_Amd_0003.pdf PDF
Questions_and_Answers_0002.pdf PDF
Sol_140FGA25R0004_Amd_0002.pdf PDF
Sol_140FGA25R0004_Amd_0001.pdf PDF
B09_-_Solicitation_Amendment_(140FGA25R0004_P0001)_0001.pdf PDF
B08_-_Solicitation_(Building_Rendering).pdf PDF
B08_-_Solicitation__(140FGA25R0004).pdf PDF
B08_-_Solicitation_Form_1442_(140FGA25R0004).pdf PDF
B08_-_Solicitation_(Drawings).pdf PDF
Sol_140FGA25R0004.pdf PDF
B08_-_Solicitation__(Geotechnical_Survey).pdf PDF
B08_-_Solicitation_(Statement_of_Work).pdf PDF
B08_-_Solicitation_(Specifications).pdf PDF
B08_-_Solicitation_(Bid_Schedule).docx DOCX document
B08_-_Solicitation_(DOL_Wage_Determination).pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BON SECOUR HEADQUARTERS/VISITOR CENTER TELECOM ADDENDUM

Extension of Fiber Optic from current location to designated network space:

Fiber optic is currently hooked up and functional in existing visitor center/headquarters. Contractor will splice and run fiber optic from existing building to new building. Existing fiber must be extended and terminated with the correct connectors for use in a Cisco 9200 48-port PoE Switch. Government will purchase and install the new switch.

Fiber optic inside the new building will be run through a (two inch) 2-inch metal conduit that is installed by the Contractor.

Once this extension and connection is complete, testing of the fiber line must be conducted and validated by the installer.

Existing Cabinet:

The existing Government cabinet will be removed, reused, and installed by the Contractor. Maintain manufacturer required clearances around the rack.

Cable terminations for access points:

Three CAT 6A cables are required to be run and terminated with connectors from the designated network area to access points through the wall and ceiling. Cable needs to be terminated and provide enough slack for connecting an access point from the ceiling.

CAT6A cables are required to be run and terminated with connectors from the designated network area

(IT Printer Room) to access points. A mounting surface shall be installed for an access point by the

Contractor.

Ethernet:

The Contractor shall run CAT6A cables from the switch to all cable drop locations shown in the construction drawings.

Government furnished items:

One (1) Cisco 9200 48-port PoE Switch, installed by Government

Three (3) Cisco 9120 Access Points (DOIWIFI), installed by Government

Existing cabinet to be moved and reused/installed by Contractor

Contractor furnished items:

All Cat6A cables, correctly terminated to patch panels and wall drops

Mounting surfaces each access point, that are made for the ceiling type/material they are mounted on such as gypsum board and/or drop ceiling.

All fiber optic cable, appurtenances, and conduit

4'x8', 3/4" backboard for telecommunications equipment

More details are in the following documents:

1. FWS AGENCY SPECIFIC REQUIREMENTS FOR IT INFRASTRUCTURE, March 2024 Version 2.0

2. Sheet E-104 of the Construction Drawings

3. Division 27 Specifications, Communications