This document is a Statement of Work (SOW) for the delivery of 500 tons of AB gravel and 400 tons of rip rap to the Merced National Wildlife Refuge (NWR) in California. The gravel will be used to cover areas of refuge administration roads and water control structures, while the rip rap will be used to reinforce water control structures and culverts. The SOW specifies that the gravel and rip rap must be virgin material, and no recycled materials will be accepted. Deliveries are expected to be completed between May 15, 2024, and November 30, 2024, with the contractor required to deliver the requested materials within 48 hours of a request from the Site Foreman. The contract opportunity related to this SOW is Solicitation Number 140FGA24Q0019, issued by the Department of the Interior Fish and Wildlife Service, for Gravel and Cobble Delivery to Merced NWR.

View the file

Other files

File Type Posted
Sol_140FGA24Q0019_Amd_0002.pdf PDF
B08_Solicitation_Price_Schedule_140FGA24Q0019_0001.xlsx XLSX spreadsheet
Sol_140FGA24Q0019_Amd_0001.pdf PDF
GAOA_Gravel_Merced_NWR_SOW-FY24_0001.pdf PDF
Sol_140FGA24Q0019.pdf PDF
A04_Statement_of_Work_0040665183.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

DELIVER 500 TONS OF ¾ AB GRAVEL AND 400 TONS RIP RAP TO Merced

NWR

1. GENERAL: The Merced NWR will require the delivery and placement of 400 tons of virgin 3/4AB gravel and 400 tons of 12-18” large aggregate cracked Rip Rap to multiple locations on Merced NWR. Gravel will be spread to cover areas of refuge administration roads and water control structures impacted by activities related to the cleaning of canals and replacement of structures on the Merced unit of the Merced NWR.

Rip Rap will be end dumped at designated water control structure locations on the Merced Unit. Gravel and Rip Rap will be delivered or stockpiled at designated water control structures at the Merced unit.

2. SCOPE:

Provide a total of 500 tons of virgin ¾ AB gravel and 400 tons 12-18” Rip Rap to locations (North Merced Unit, East Marsh unit) on the Merced National Wildlife Refuge.

Two hundred (200) tons of ¾ AB gravel, one-hundred sixty (160) Tons of 12-18” Rip Rap to North Merced Unit.

Three hundred (300) tons of ¾ AB gravel, Two-hundred forty (240) Tons of 12-18” Rip Rap to East Marsh unit.

A gravel delivery truckload is considered between 20-25 tons. Gravel will be belly dumped or side dumped on existing gravel roads and disturbed construction areas at an even rate. A rip rap delivery truck load will be considered 20 tons and will be stockpiled, or end dumped at designated locations. Areas where gravel and rip rap are to be placed will be marked in advance. Gravel will be placed in quantities to allow coverage of an average width of 7 feet to an average thickness of 4 inches. Some areas may require an average width of 5 feet and others up 10 feet to an average thickness of 4 inches.

Material must be ¾” Class 2 Aggregate Base virgin or 12” minus fractured rock; no recycled materials such as asphalt, porcelain or concrete will be accepted. Rip rap will be reinforcement for water control structures and culverts.

3. PLACE/DELIVERY AND PERIOD OF PERFORMANCE: Deliveries will be at various locations within the Merced National Wildlife Refuge. Site Foreman will provide load amount requests and delivery locations on a daily or weekly basis to the contractor, deliveries of the requested amount of materials will be expected within 48 hours of request. Period of performance is from May 15th, 2024 – November 30, 2024.

Delivery locations:

North Merced Unit-200 ¾ AB gravel, 160 Tons Rip Rap Merced National Wildlife Refuge – Red Barn, North Merced 37.189812°, -120.610951° 6689 W Sandy Mush Rd Merced, CA 95341

East Marsh Merced Unit- 300 Tons ¾”AB gravel, 240 Tons Rip Rap Delivery within one mile of or stockpile at:

Merced National Wildlife Refuge-Maintenance Shop 7430 W Sandy Mush Rd Merced, CA 95341

4. GOVERNMENT FURNISHED EQUIPMENT OR

MATERIALS/INFORMATION:

Delivery requirement is to belly dump gravel and spread gravel as much as allowed by normal operating practices of delivery equipment at designated locations within the Merced NWR and end dump rip rap. USFWS equipment will finish spreading gravel to final requirements.

5. AVAILABILITY: Normal duty hours are Monday thru Friday 7:00 a.m. – 4:00 p.m.

6. TECHNICAL COORDINATOR: Gabriel Sandoval, Merced Refuge Manager.

Cell Phone 209-587-5530. Office # 209-826-3508.