This document is a Statement of Work (SOW) for the delivery and placement of 500 tons of 3/4 inch AB gravel and 400 tons of 4-8 inch cobble rip rap to the Merced National Wildlife Refuge. The gravel and rip rap are to be delivered and placed at the North Merced Unit and East Marsh Unit locations within the refuge between May 15, 2024 and November 30, 2024. The required products must be virgin, 12-inch minus fractured rock with no recycled materials. Delivery trucks are expected to provide 20-25 tons of gravel and 20 tons of rip rap per load. The refuge manager will provide daily or weekly requests for material amounts and delivery locations, and the contractor will be expected to fulfill the requests within 48 hours. The U.S. Fish and Wildlife Service will be responsible for final gravel spreading and placement. The related federal contract opportunity is Solicitation Number 140FGA24Q0019 for "Gravel and Cobble Delivery to Merced NWR" issued by the Department of the Interior Fish and Wildlife Service.

View the file

Other files

File Type Posted
GAOA_Gravel_Merced_NWR_SOW-FY24_1_0002.pdf PDF
Sol_140FGA24Q0019_Amd_0002.pdf PDF
B08_Solicitation_Price_Schedule_140FGA24Q0019_0001.xlsx XLSX spreadsheet
Sol_140FGA24Q0019_Amd_0001.pdf PDF
Sol_140FGA24Q0019.pdf PDF
A04_Statement_of_Work_0040665183.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

DELIVER 500 TONS OF ¾ AB GRAVEL AND 400 TONS RIP RAP COBBLE TO

Merced NWR

1. GENERAL: The Merced NWR will require the delivery and placement of 400 tons of virgin 3/4AB gravel and 400 tons of 4-8” Cobble Rip Rap to multiple locations on Merced NWR. Gravel will be spread to cover areas of refuge administration roads and water control structures impacted by activities related to the cleaning of canals and replacement of structures on the Merced unit of the Merced NWR. Rip Rap will be end dumped at designated water control structure locations on the Merced Unit. Gravel and Rip Rap will be delivered or stockpiled at designated water control structures at the Merced unit

2. SCOPE:

Provide a total of 500 tons of virgin ¾ AB gravel and 400 tons 4-8” Cobble Rip Rap to locations (North Merced Unit, East Marsh unit) on the Merced National Wildlife Refuge.

Two hundred (200) tons of ¾ AB gravel, one-hundred sixty (160) of 4-8” Cobble Rip Rap to North Merced Unit.

Three hundred (300) tons of ¾ AB gravel, Two-hundred forty (240) Tons Rip Rap Cobble to East Marsh unit.

A gravel delivery truckload is considered between 20-25 tons. Gravel will be belly dumped or side dumped on existing gravel roads and disturbed construction areas at an even rate. A rip rap delivery truck load will be considered 20 tons and will be stockpiled, or end dumped at designated locations. Areas where gravel and rip rap are to be placed will be marked in advance. Gravel will be placed in quantities to allow coverage of an average width of 7 feet to an average thickness of 4 inches. Some areas may require an average width of 5 feet and others up 10 feet to an average thickness of 4 inches.

Material must be ¾” Class 2 Aggregate Base virgin or 12” minus fractured rock; no recycled materials such as asphalt, porcelain or concrete will be accepted.

3. PLACE/DELIVERY AND PERIOD OF PERFORMANCE: Deliveries will be at various locations within the Merced National Wildlife Refuge. Site Foreman will provide load amount requests and delivery locations on a daily or weekly basis to the contractor, deliveries of the requested amount of materials will be expected within 48 hours of request. Period of performance is from May 15th, 2024 – November 30, 2024.

Delivery locations:

North Merced Unit-200 ¾ AB gravel, 160 Tons Rip Rap Cobble Merced National Wildlife Refuge – Red Barn, North Merced 37.189812°, -120.610951° 6689 W Sandy Mush Rd Merced, CA 95341

East Marsh Merced Unit- 300 Tons ¾”AB, 240 Tons Rip Rap Cobble Delivery within one mile of or stockpile at:

Merced National Wildlife Refuge-Maintenance Shop 7430 W Sandy Mush Rd Merced, CA 95341

4. GOVERNMENT FURNISHED EQUIPMENT OR

MATERIALS/INFORMATION:

Delivery requirement is to belly dump gravel and spread gravel as much as allowed by normal operating practices of delivery equipment at designated locations within the Merced NWR and end dump rip rap. USFWS equipment will finish spreading gravel to final requirements.

5. AVAILABILITY: Normal duty hours are Monday thru Friday 7:00 a.m. – 4:00 p.m.

6. TECHNICAL COORDINATOR: Gabriel Sandoval, Merced Refuge Manager.

Cell Phone 209-587-5530. Office # 209-826-3508.